ST0701-CN090925L. H. LACY COMPANY, Ltd. P.O. Box 541297 Dallas, TX 75354 -1297 Ph :(214)357-0146 RFI To: Jorge Rodriguez Halff Associates Ph: 817-847-1422 Fax: 817-232-9784 CC: Matthew Oyen (PacTrust), Harris, Kody (L.H. Lacy Company) Subject: TXDOT Standard Spec 2004,416.3-C Drawing: Cost Impact: RFI #: 4 Date: 9/23/2009 Job: 5262 SWem Blvd (SCoppell- Beltline) Phone: Spec Section: Schedule Impact: Request: See Attachment Date Required: 9124/2009 Requested by: Kody Harris L.H. Lacy Company Response: 5 R c O - Q otb+ - v, Yes t S��ffi�� � CO,nJ��c On ,OtnT OVQ� i s 5 ecov4 dues - �o., Tke %'F ,� I lz� a �e�,n,�P✓t \� IN 0'V ee- e-5 Answered by 9 /'15/0 : 1 pssac� o� c Company Date Page 1 of 1 ASHLAR CONTRACTING COMPANY RFI No Attention: Kody Harris Date of Request: 9 -23 -09 Date Response Required: 9 -30 -09 Job No.: Southwestern Blvd, Coppell CN: Contractor. L. H. Lacy Company Reference Document: TxDOT Stan. Spec. 2004, 416.3 -C Attachments: Problem Identification or Question: SHEET SC1.23 SHOWS THE BRIDGE SLAB CONSTRUCTION JOINT BETWEEN PHASE ONE AND TWO FLUSH WITH THE EDGE OF THE PRESTR. SLAB BEAM. DETAIL "B" ON THE SAME PAGE SHOWS THE GALVANIZED STEEL PLATE TO LAP ONTO THE TOP OF THE SLAB BEAM 3 ". WE PROPOSE TO MOVE THE CONSTUCTION JOINT FOUR INCHES FROM THE EDGE TO ALLOW INSTALLING THE GALVANIZED PLATES IN PHASE TWO. ALSO, WE PROPOSE TO HAVE THE GALVANIZED STEEL PLATE FABRICATED IN TYPICAL PIECES: 4'-0" X V -7 ". THE PIECES WILL BE INSTALLED WITH' /4" TO 1 /2" GAPS BETWEEN EACH PLATE. THE PIECES AT THE ENDS OF THE SLAB BEAMS WILL BE FIELD CUT TO FIT. Initiator of Request: Larry Kennon Date: 9 -23 -09 Suggested Resolution: Suggested Resolution By: Date: Resolution: Resolution By Company / Section Title Date Reviewed By Engineer Pr oject M anager Date Distribution: E X General Contractor ❑ ❑ ❑ ❑ ❑ El 171 ❑