Loading...
ST0701-CS091112 Halff Associates, Inc. 1201 North Bowser Rd. Richardson, Texas 75081 (214) 346-6200 Fax (214) 739-0095 ENGINEERS • ARCHITECTS • SCIENTISTS • PLANNERS • SURVEYORS FIELD OBSERVATION REPORT NO. 4 AVO: 24732 & 25816 Date/time: November 12, 2009 10:00 A.M. Project Description: Southwestern Boulevard Improvements Contractor/Subcontractor: Lacy Construction Engineer's Representative: Jonathan McCulley WEATHER AND SITE CONDITIONS: Cool, Sunny, Dry EQUIPMENT ON JOBSITE: Backhoe STORED MATERIALS: Rebar cage for Abutment 4. Formwork. Miscellaneous rebar. WORK IN PROGRESS: Forming for Abutment 4. Columns for Bent 2. LABOR FORCE ON JOBSITE: Three workers on bridge site; one operating equipment. DIRECTIONS GIVEN TO CONTRACTOR OR OTHER CONVERSATIONS WITH CONTRACTOR: Discussed RFI #5, 6, and 7. COMMENTS: Abutment 1 was poured (no backwall yet). All drilled shafts were in place. Bent 2 columns were under construction. Drilled shaft rebar extending above shaft on Bent 3 requires straightening. Abutment 4 rebar cage was ready and forming for the abutment was in place. The contractor is hoping to start placing beams in a couple of weeks. COPIES: OWNER ARCHITECT CONTRACTOR FILE