ST0701-CS091113 Halff Associates, Inc. 1201 North Bowser Rd. Richardson, Texas 75081 (214) 346-6200 Fax (214) 739-0095 ENGINEERS • ARCHITECTS • SCIENTISTS • PLANNERS • SURVEYORS FIELD OBSERVATION REPORT NO. 5 AVO: 24732 & 25816 Date/time: November 13, 2009 10:00 AM Project Description: Southwestern Boulevard Improvements Contractor/Subcontractor: Lacy Construction Engineer's Representative: Robert Gossett, E.I.T. WEATHER AND SITE CONDITIONS: Overcast EQUIPMENT ON JOBSITE: Earth moving equipments Excavation equipments STORED MATERIALS: Dirt, gravel, storm drain, waste water and water pipes WORK IN PROGRESS: Storm drainage, and bridge construction LABOR FORCE ON JOBSITE: Equipment operators and laborers. DIRECTIONS GIVEN TO CONTRACTOR OR OTHER CONVERSATIONS WITH CONTRACTOR: Checked in and explained what I was doing. COMMENTS: At the time of the visit the bridge abutments and the drainage were under construction. Storm lines from Coppell Rd. to Grapevine Creek seem to be in place. The majority of line A, east of the creek seems to be installed. No signs of line B were visible. The water and waste water mains seemed to mostly complete on both sides of the creek. The temporary road west of the creek has been constructed and in use. There has been no road pavement or earthwork done at this time. COPIES: OWNER ARCHITECT CONTRACTOR FILE