ST0701-CS091201
Page 1 of 1 Keith Marvin - field report No. 6 & 7 From: "Rodriguez, Jorge" <jrodriguezghalff.com> To: "MattOgpactrust.com" <MattOgpactrust.com> Date: 12/1/2009 2:29 PM Subject: field report No. 6 & 7 CC: Keith Marvin <kmarvin @ci.coppell.tx.us >, "Farris, Kody" <kharris @lhlacy.com >, "Littleton, Dave" <dlittletonghalff.com> Attachments: 2009 -11 -30 00 l .jpg; 2009 -11 -30 004.jpg; 2009 -11 -30 003 .jpg; 2009 -11 -30 002.jpg; 2009-11-30 007. jpg; 2009-11-30 009. jpg; 2009-11-30 013. jpg Mat Here are more pictures for your records 001. Existing bushes at Southwestern Blvd. intersection with Belt Line 002. Existing bushes from a different angle 003. Existing 72" Storm drain pipe parallel to Belt Line Rd. 004. Existing Bushes from a different angle 007. 8" water main construction crossing SW. Blvd 009. Sub -grade preparation under construction. 013. Storm drain inlets under construction Thanks Jorge Rodriguez, P.E. MEN Project Manager 1BUE HALFF HALFF ASSOCIATES, INC. 1201 N. Bowser Road Richardson, Texas 75081 Phone 214 - 346 -6203 Fax 214 - 739 -0095 www.halff.com file: / /C: \Documents and Settings \radloo \Local Settings \Temp \XPgrpwise \4B 15284ACity_... 8/31/2011 Page 1 of 1 Keith Marvin -Field Report N0.6 &7 (last email) From: "Rodriguez, Jorge" <jrodriguezghalff.com> To: "MattOgpactrust.com" <MattOgpactrust.com> Date: 12/1/2009 2:33 PM Subject: Field Report N0. 6 &7 (last email) CC: Keith Marvin <kmarvin @ci.coppell.tx.us >, "Farris, Kody" <kharris @lhlacy.com >, "Littleton, Dave" <dlittletonghalff.com> Attachments: 2009 -11 -30 016.jpg; 2009 -11 -30 026 Jpg; 2009 -11 -30 029.jpg; 2009 -11 -30 034.Jpg Matt 016. Water service connection to the school. 026. Temporary asphalt pavement and sub -grade preparation. 029. Sub -grade preparation for the road. 034. Existing 16" water main location Please call me if any question Thanks Jorge Rodriguez, P.E. MEN Project Manager 1BUE HALFF HALFF ASSOCIATES, INC. 1201 N. Bowser Road Richardson, Texas 75081 Phone 214 - 346 -6203 Fax 214 - 739 -0095 www.halff.com file: / /C: \Documents and Settings \radloo \Local Settings \Temp \XPgrpwise \4B 15292ACity_... 8/31/2011 :■: 1201 North Bowser Rd. Halff A ichardson, Texas 75081 Inc. • ( 214) 346 -6200 ENGINEERS ARCHITECTS SCIENTISTS PLANNERS SURVEYORS Fax (214) 739 -0095 FIELD OBSERVATION '1' 1 AVO: 24732 & 25816 Date /time: November 30, 2009 10:00 A.M. Project Description: Southwestern Boulevard Improvements Contractor /Subcontractor: Lacy Construction Engineer's Representative: Jonathan McCulley WEATHER AND SITE CONDITIONS: Cool, Sunny, Dry EQUIPMENT ON JOBSITE: Backhoe STORED MATERIALS: Formwork WORK IN PROGRESS: Cleaning bent caps. Preparation for beams. Backfilling behind Abutment 4 (Stage 1) LABOR FORCE ON JOBSITE: Five laborers DIRECTIONS GIVEN TO CONTRACTOR OR OTHER CONVERSATIONS WITH CONTRACTOR: N/A COMMENTS: Abutment 1 and 4 (Stage 1) finished with backwalls (no wingwalls). Interior Bents 2 and 3 (Stage 1) finished with earwalls. COPIES: ® OWNER ® ARCHITECT ® CONTRACTOR ❑ ® FILE :■: 1201 North Bowser Rd. Halff A ichardson, Texas 75081 Inc • (214) 346 -6200 ENGINEERS ARCHITECTS SCIENTISTS PLANNERS SURVEYORS Fax (214) 739 -0095 FIELD IM S 91.�T/V Y "tTl N 9111]. I AVO: 24732 & 25816 Date /time: November 30, 2009 3:00 PM Project Description: Southwestern Boulevard Improvements Contractor /Subcontractor: Lacy Construction Engineer's Representative: Jorge L. Rodriguez, P.E. WEATHER AND SITE CONDITIONS: Cool, Sunny and Dry EQUIPMENT ON JOBSITE: Earth moving equipments Excavation equipments STORED MATERIALS: Dirt, gravel, storm drain, waste water and water pipes WORK IN PROGRESS: Earthwork, water, waste water, storm drain, and sub -grade preparation. Road detour was built. LABOR FORCE ON JOBSITE: Kody Harris (Lacy), Keith Marvin (City of Coppell Engineer Department) and Rick (City Inspector), equipment operators and laborers. DIRECTIONS GIVEN TO CONTRACTOR OR OTHER CONVERSATIONS WITH CONTRACTOR: We coordinate the work progress to sign the monthly payment application report. Contractor proposes water main relocation at Belt Line connection. We discuss alternatives to verify advantages and disadvantages. We will prepare two alternatives with the proposed layouts. There are five AT &T communication conduits in conflict at the Storm Drain connection with the existing Junction Box. Contractor will coordinate with the utility company possible conduits relocation. We will also check if there are possible storm drain alternatives. COMMENTS: At the time of the visit sub -grade preparation for the road was under construction. Water main and wastewater are under construction from the bridge to Belt Line Road. All service connections to the north side are done. Storm drain is under construction from the bridge to Belt Line. Inlet protections and erosion control look good. A few gravel and dirt stockpiles were poured in the site. Drilled shaft foundations for phase one is done. The existing pole that is feeding the lighted school sign is inclined and shall be relocated. Contractor shall coordinate with the City relocation as needed. See pictures. COPIES: ® OWNER ® ARCHITECT ® CONTRACTOR ❑ ® FILE J. -� IL r ML E TA c `WT W L ; m It . r 66 ,tea'•• r' NL s r ,. . 1 -16 i °a y ro P . • lfl78 1 ®Ir I R IL i � 1 �•. r 3� A V6� IL ® . • . �' 9r . r . 1 a'# ;4 c 16 1 - 'fie `: • m � m ,: ,�e � � -- � - " -.' _. "-tea, '°� "F" m IY s, � .. • - - _, ° _ - ® � _ _,�.. ° - A � " , m • +e W W e r fi r` ® • °• a• r` A. L e i MW 1 �, _ • 1' ° the m ,a e f r e j � .g a ••� a .r , € u , m m e � ' R d- _ , y �- -_ � 1 W. r Iff e ere 0 . • ' � �` A r.0 s, OL t ° as - . ° •� n :w , °� • ' y • ir ma - m J • r ^m e : ,. •r`° a "� c e ru s wo m .. � „ �•• *fir a CI A e .` r =� 3 Or L 0ill ila 1 -l" A -, ME. '. OIL %-§6p 9; In AM& I NI 4 E-1 9wi: -7 IL- If -'L IF M �rh tin Vr N 16 -301-A ON 4F % OU k 4 v e - . Alo .� > | F | 2■ ^/« f .�) ~i �. a :f ■ � w <ML 4. IL © ° ME ., . ] mov�