Loading...
ST0701-CS110831 T H E C 1 T Y O F COPPELL x : q August 31, 2011 VIA CERTIFIED MAIL Kody Harris Lacy Construction 1880 Crown Road Dallas TX 75234 RE: Southwestern Blvd., Project #ST 07 -01 Maintenance Repairs Required Dear Mr. Harris: Representatives of the City of Coppell recently conducted an inspection of the paving and utilities installed during the referenced project. Below are several important items that need your attention immediately, as follows: 1.) Backfill behind curb from bridge to the west, both sides of Southwestern Blvd., to the west end of the property @ 420 Southwestern. 2.) Fix broken sanitary sewer pads and readjust several clean outs to grade; add backfill around clean outs and meter cans. 3.) Remove rebar at west driveway of 420 Southwestern, north of the sidewalk. Please contact me at your earliest convenience with the date your crew will be onsite to remedy these deficiencies. Si erel , Rick O'Dell Construction Inspector Office Phone: (972) 304 -7090 Fax: (972) 304 -3570 cc: Ken Griffin, P.E., Director of Engineering & Public Works Glenn Hollowell, P.E., Asst. Director of Public Works David Littleton, P.E., Halff Associates Matt Oyen, PacTrust A FAMILY COMMUNITY FOR A LIFETIME 255 PARKWAY * P.O. BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * WWW.COPPELLTX.GOV