ST0701-CS110831 T H E C 1 T Y O F
COPPELL
x : q
August 31, 2011 VIA CERTIFIED MAIL
Kody Harris
Lacy Construction
1880 Crown Road
Dallas TX 75234
RE: Southwestern Blvd., Project #ST 07 -01
Maintenance Repairs Required
Dear Mr. Harris:
Representatives of the City of Coppell recently conducted an inspection of the paving and utilities
installed during the referenced project. Below are several important items that need your attention
immediately, as follows:
1.) Backfill behind curb from bridge to the west, both sides of Southwestern Blvd., to the
west end of the property @ 420 Southwestern.
2.) Fix broken sanitary sewer pads and readjust several clean outs to grade; add backfill
around clean outs and meter cans.
3.) Remove rebar at west driveway of 420 Southwestern, north of the sidewalk.
Please contact me at your earliest convenience with the date your crew will be onsite to remedy
these deficiencies.
Si erel ,
Rick O'Dell
Construction Inspector
Office Phone: (972) 304 -7090
Fax: (972) 304 -3570
cc: Ken Griffin, P.E., Director of Engineering & Public Works
Glenn Hollowell, P.E., Asst. Director of Public Works
David Littleton, P.E., Halff Associates
Matt Oyen, PacTrust