Mat
Here is our field report no.8 and several pictures of the bridge for your records. The structural engineer visited the
site this morning.
Please call me if any question.
thanks
Jorge Rodriguez, P.E. MEN
Project Manager 1BUE HALFF
HALFF ASSOCIATES, INC.
1201 N. Bowser Road
Richardson, Texas 75081
Phone 214 - 346 -6203
Fax 214 - 739 -0095
www.halff.com
file: / /C: \Documents and Settings \radloo \Local Settings\ Temp \XPgrpwise \4B2798FECity_... 8/31/2011
:■: 1201 North Bowser Rd.
Halff A ichardson, Texas 75081
Inc. • ( 214) 346 -6200
ENGINEERS ARCHITECTS SCIENTISTS PLANNERS SURVEYORS Fax (214) 739 -0095
FIELD OBSERVATION '1' 1 :
AVO: 24732 & 25816 Date /time: December 15, 2009
10:00 A.M.
Project Description: Southwestern Boulevard Improvements
Contractor /Subcontractor: Lacy Construction
Engineer's Representative: Jonathan McCulley
WEATHER AND SITE CONDITIONS:
Cold, Clear
EQUIPMENT ON JOBSITE:
2 Cranes, 2 backhoes not in use
STORED MATERIALS:
formwork
WORK IN PROGRESS:
Erecting beams for stage 1
LABOR FORCE ON JOBSITE:
Crane operators, laborers, supervisors, contractor
DIRECTIONS GIVEN TO CONTRACTOR OR OTHER CONVERSATIONS WITH CONTRACTOR:
N/A
COMMENTS:
Rip -rap under bridge poured for stage 1. All bents and abutments for stage 1 complete with bearing pads in
place. Observed span 2 beams placed. Span 1 and 3 should be finished today.