Loading...
ST0701-CS091215Page 1 of 1 Keith Marvin -field report no. 8 (bridge) From: "Rodriguez, Jorge" <jrodriguezghalff.com> To: Matt Oyen <Matt0gPacTrust.com> Date: 12/15/2009 2:11 PM Subject: field report no. 8 (bridge) CC: Keith Marvin <kmarvin @ci.coppell.tx.us >, "Farris, Kody" <kharris @lhlacy.com >, "Littleton, Dave" <dlittletonghalff.com> Attachments: rpt8- 12- 15- 09.doc; 100_2316.jpg; 100_2326.jpg; 100_2335.jpg; 100_2338.jpg; 100_2340.jpg Mat Here is our field report no.8 and several pictures of the bridge for your records. The structural engineer visited the site this morning. Please call me if any question. thanks Jorge Rodriguez, P.E. MEN Project Manager 1BUE HALFF HALFF ASSOCIATES, INC. 1201 N. Bowser Road Richardson, Texas 75081 Phone 214 - 346 -6203 Fax 214 - 739 -0095 www.halff.com file: / /C: \Documents and Settings \radloo \Local Settings\ Temp \XPgrpwise \4B2798FECity_... 8/31/2011 :■: 1201 North Bowser Rd. Halff A ichardson, Texas 75081 Inc. • ( 214) 346 -6200 ENGINEERS ARCHITECTS SCIENTISTS PLANNERS SURVEYORS Fax (214) 739 -0095 FIELD OBSERVATION '1' 1 : AVO: 24732 & 25816 Date /time: December 15, 2009 10:00 A.M. Project Description: Southwestern Boulevard Improvements Contractor /Subcontractor: Lacy Construction Engineer's Representative: Jonathan McCulley WEATHER AND SITE CONDITIONS: Cold, Clear EQUIPMENT ON JOBSITE: 2 Cranes, 2 backhoes not in use STORED MATERIALS: formwork WORK IN PROGRESS: Erecting beams for stage 1 LABOR FORCE ON JOBSITE: Crane operators, laborers, supervisors, contractor DIRECTIONS GIVEN TO CONTRACTOR OR OTHER CONVERSATIONS WITH CONTRACTOR: N/A COMMENTS: Rip -rap under bridge poured for stage 1. All bents and abutments for stage 1 complete with bearing pads in place. Observed span 2 beams placed. Span 1 and 3 should be finished today. COPIES: ® OWNER ® ARCHITECT ® CONTRACTOR ❑ ® FILE �, ;,� ��� . � ����� q rT NIL . or 17)