Loading...
ST0701-CS091222 (3) Page 1 of 2 Keith Marvin - RE: Waste water stub outs From:   "Harris, Miranda" <mharris@lhlacy.com> To:   "Harris, Kody" <kharris@lhlacy.com>, "Rodriguez, Jorge" <jrodriguez@halff.com> Date:   12/22/2009 4:01 PM Subject:   RE: Waste water stub outs CC:<kmarvin@ci.coppell.tx.us>, <matto@pactrust.com>, "Littleton, Dave"     <dlittleton@halff.com>, "Murawski, Ron" <rmurawski@lhlacy.com>   Jorge,   After reviewing the original attached drawing; the cost of the proposed work will be $900.  This includes potholing and surveying the 3 locations shown in the drawing.   Please let us know if you have any questions.   Thank you,   Miranda Harris LH LACY COMPANY 1880 Crown Rd. Dallas TX 75234   Office: 214-357-0146 Fax: 214-350-0662 From: Harris, Kody Sent: Monday, December 21, 2009 10:46 AM To: Rodriguez, Jorge Cc: kmarvin@ci.coppell.tx.us; matto@pactrust.com; Littleton, Dave; Murawski, Ron; Harris, Miranda Subject: RE: Waste water stub outs   Jorge,   We are evaluating the cost impact to obtain the information requested. As soon as I have that information I will send an estimate for your review.   Thanks,   KODY HARRIS PROJECT MANAGER LH LACY COMPANY 1880 CROWN RD. DALLAS TX 75234 O (214) 357 - 0146 F (214) 350 - 0662   From: Rodriguez, Jorge [mailto:jrodriguez@halff.com] Sent: Monday, December 21, 2009 10:40 AM To: Harris, Kody file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4B30ED66City_...8/31/2011 Page 2 of 2 Cc: kmarvin@ci.coppell.tx.us; matto@pactrust.com; Littleton, Dave Subject: RE: Waste water stub outs   Kody   When do you think we will receive the below requested information. I'll be out next week, so please let me know for further coordination.   Thanks   Jorge   From: Rodriguez, Jorge Sent: Wednesday, December 16, 2009 3:34 PM To: 'kharris@lhlacy.com' Cc: 'kmarvin@ci.coppell.tx.us'; 'matto@pactrust.com'; Littleton, Dave Subject: Waste water stub outs Kody   We were checking possible waste water stub outs locations and we are pretty tied at the existing 24" water crossing locations. The attached sketch shows three possible stub out locations, but we need to verify the top elevations of the existing 24 " water main at the clouded locations. We are giving approximate coordinate values at these locations. We are trying to connect the stub outs to the proposed manholes. Please provide this information as soon as you can to move forward on this issue.   Thanks very much   Jorge Rodriguez, P.E. Project Manager   HALFF ASSOCIATES, INC.   1201 N. Bowser Road Richardson, Texas 75081 Phone 214-346-6203 Fax 214-739-0095 www.halff.com         Privileged/Confidential Information may be contained in this message. If you are not the addressee indicated in this message, have received this message in error (or responsible for delivery of the message to such person), you may not copy or deliver this message to anyone. In such case, you should destroy this message and kindly notify the sender by reply email. Please advise immediately if you or your employer do not consent to Internet email for messages of this kind. Opinions, conclusions and other information in this message that do not relate to the official business of our firm shall be understood as neither given nor endorsed by it.   file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4B30ED66City_...8/31/2011 (8/31/2011) Keith Marvin - RE: Waste water stub outsPage 1 From: "Rodriguez, Jorge" <jrodriguez@halff.com> To: Keith Marvin <kmarvin@ci.coppell.tx.us>, "kharris@lhlacy.com" <kharris@l... CC: "Littleton, Dave" <dlittleton@halff.com>, "matto@pactrust.com" <matto@pa... Date: 12/22/2009 1:25 PM Subject: RE: Waste water stub outs All of these locations are pretty tied for crossing basically with the 24" water main. We have to check which one would work best but I think that the best option should be two stub outs (stub #1 and #3) if both work. Thanks Jorge -----Original Message----- From: Keith Marvin [mailto:kmarvin@ci.coppell.tx.us] Sent: Tuesday, December 22, 2009 11:31 AM To: Rodriguez, Jorge; kharris@lhlacy.com Cc: Littleton, Dave; matto@pactrust.com Subject: Re: Waste water stub outs Are you proposing to build all three of these stub outs, or are you checking to see which one would work best? Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "Rodriguez, Jorge" <jrodriguez@halff.com> 12/16/2009 3:34 PM >>> Kody We were checking possible waste water stub outs locations and we are pretty tied at the existing 24" water crossing locations. The attached sketch shows three possible stub out locations, but we need to verify the top elevations of the existing 24 " water main at the clouded locations. We are giving approximate coordinate values at these locations. We are trying to connect the stub outs to the proposed manholes. Please provide this information as soon as you can to move forward on this issue. Thanks very much Jorge Rodriguez, P.E. Project Manager [cid:703502621@16122009-324F] HALFF ASSOCIATES, INC. 1201 N. Bowser Road Richardson, Texas 75081 Phone 214-346-6203 Fax 214-739-0095 www.halff.com