Loading...
ST0701-CS091222 (8/31/2011) Keith Marvin - FW: 8" water main on Bullock DR (SW Blvd)Page 1 From: "Rodriguez, Jorge" <jrodriguez@halff.com> To: "kmarvin@ci.coppell.tx.us" <kmarvin@ci.coppell.tx.us> CC: "matto@pactrust.com" <matto@pactrust.com>, "Littleton, Dave" <dlittleton... Date: 12/22/2009 11:15 AM Subject: FW: 8" water main on Bullock DR (SW Blvd) Attachments: 200912028inchwater.pdf Keith Please see the attached sketch that I sent to Rick and Kody three weeks ago. Please call me if any question thanks Jorge ________________________________ From: Rodriguez, Jorge Sent: Wednesday, December 02, 2009 9:17 AM To: Richard Odell; Harris, Kody Subject: 8" water main on Bullock DR (SW Blvd) Rick The City requested to abandon the existing 8" water main. This is the reason that our plans shows to build 120 lf of a new 8" water main as shown on the attached drawing. We also have to plug the existing 8" water main as shown on the enclosed drawing. Please call me if any question. Thanks Jorge Rodriguez, P.E. Project Manager [cid:838291015@02122009-1583] HALFF ASSOCIATES, INC. 1201 N. Bowser Road Richardson, Texas 75081 Phone 214-346-6203 Fax 214-739-0095 www.halff.com