Loading...
ST0701-CS101116(9/6/2011) Keith Marvin - ADA compliance Page 1 From: "Rodriguez, Jorge" <jodriguez @halff.com> To: "'fredcawyer @aol.com "' <fredcawyer @aol.com> CC: Matt Oyen <MattO @PacTrust.com >, Keith Marvin <kmarvin @coppelltx.gov >, "'... Date: 11 /16/2010 11:14 AM Subject: ADA compliance Attachments: 5262 ADA Compliance.pdf; ADA Compliance.docx Dear Fred: Please see attached letter from the contractor stating that to the best of his knowledge all the areas noted during the ADA inspection have been corrected. Also I attach several pictures I took last week on the mentioned areas. Please let me know if we have to provide any additional information or call me if any question. thanks Jorge L. Rodriguez, P.E. Project Manager [cid:image001.jpg @01 CB857D.B4B55520] HALFF ASSOCIATES, INC. 1201 North Bowser Road Richardson, Texas 75081 Phone 214 - 346 -6203 Fax 214 - 739 -0095 www.halff.com V Lacy Construction Civil Construction As Planned www IhIacy corn November 16, 2010 Pacific Realty Associates, L.P. (PacTrust) Matthew Oyen 15350 SW Sequoia Pkwy, Suite 300 Portland, OR. 97224 Project: Southwestern Blvd Job #: 5262 Dear Mr. Oyen, To the best of Lacy Construction knowledge the cross slopes in the areas noted during the ADA inspection have been corrected for compliance. Also, the tree and bush that encroached into the new sidewalk has been corrected. Please contact me with any questions at 21.4-535-4825. Sincerely, K dy Harris Project Manager 1880 Crown Road PO Box 541297 T: 214,357 0146 Dallas, Texas 75234 Dallas, Texas 75354-1297 F :214 350 0662 40M