ST0701-CS101116(9/6/2011) Keith Marvin - ADA compliance Page 1
From: "Rodriguez, Jorge" <jodriguez @halff.com>
To: "'fredcawyer @aol.com "' <fredcawyer @aol.com>
CC: Matt Oyen <MattO @PacTrust.com >, Keith Marvin <kmarvin @coppelltx.gov >, "'...
Date: 11 /16/2010 11:14 AM
Subject: ADA compliance
Attachments: 5262 ADA Compliance.pdf; ADA Compliance.docx
Dear Fred:
Please see attached letter from the contractor stating that to the best of his knowledge all the areas noted
during the ADA inspection have been corrected.
Also I attach several pictures I took last week on the mentioned areas. Please let me know if we have to
provide any additional information or call me if any question.
thanks
Jorge L. Rodriguez, P.E.
Project Manager
[cid:image001.jpg @01 CB857D.B4B55520]
HALFF ASSOCIATES, INC.
1201 North Bowser Road
Richardson, Texas 75081
Phone 214 - 346 -6203
Fax 214 - 739 -0095
www.halff.com
V Lacy
Construction
Civil Construction As Planned
www IhIacy corn
November 16, 2010
Pacific Realty Associates, L.P. (PacTrust)
Matthew Oyen
15350 SW Sequoia Pkwy, Suite 300
Portland, OR. 97224
Project: Southwestern Blvd
Job #: 5262
Dear Mr. Oyen,
To the best of Lacy Construction knowledge the cross slopes in the areas noted
during the ADA inspection have been corrected for compliance. Also, the tree
and bush that encroached into the new sidewalk has been corrected.
Please contact me with any questions at 21.4-535-4825.
Sincerely,
K dy Harris
Project Manager
1880 Crown Road PO Box 541297 T: 214,357 0146
Dallas, Texas 75234 Dallas, Texas 75354-1297 F :214 350 0662
40M