Loading...
ST0701-CS101112 (2) Page 1 of 1 Keith Marvin - SW Boulevard From:   "Rodriguez, Jorge" <jrodriguez@halff.com> To:   "'kharris@lhlacy.com'" <kharris@lhlacy.com> Date:   11/12/2010 2:45 PM Subject:   SW Boulevard CC:   Keith Marvin <kmarvin@coppelltx.gov>, Matt Oyen <MattO@PacTrust.com>   Kody   I talked to Fred Cawyer (TDLR inspector) in regard how to proceed with the TAS inspection and he request that the contractor issue a letter stating that in the best of his knowledge the cross slopes in the areas noted during the ADA inspection were fixed for compliance. Also a point that I did not verify was if the tree and bush that encroached into the new sidewalk was removed. Please include in your letter. I took some pictures today and one time I receive your letter, I'll attach as a confirmation that everything noted on the TAS inspection report was fixed for compliance. Please give me a call if any question   Thanks   Jorge L. Rodriguez, P.E. Project Manager   HALFF ASSOCIATES, INC.   1201 North Bowser Road Richardson, Texas 75081 Phone 214-346-6203 Fax 214-739-0095 www.halff.com     file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4CDD5306City_o...9/6/2011