Loading...
ST0701-CS101111 (9/6/2011) Keith Marvin - Re: Southwestern BoulevardPage 1 From: Keith Marvin To:'kharris@lhlacy.com'; Oyen, Matt CC:Odell, Richard; 'Rodriguez, Jorge' Date: 11/11/2010 1:47 PM Subject: Re: Southwestern Boulevard Matt, I believe the repairs have all been made. Halff Associates may want to visit the site again, but I believe they can send in the form indicating that all deficiencies noted during the TDLR inspection have been corrected. At this time, we believe the project to be complete. We will issue a Final Acceptance Letter shortly. The two year maintenance period will begin on the date of the Final Acceptance. Please send us your final pay request. Thanks, Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> Matt Oyen <MattO@PacTrust.com> 11/9/2010 6:39 PM >>> Kody - Have you been out to the site to review the walkway cross slopes in the areas noted during the ADA inspection on Southwestern Boulevard? If so what is the current status of those areas as well as the walkway repairs at the bridge. When you have a moment could you please shoot me a quick status update, or give me a call. Thanks, Matthew Oyen, PE Construction Manager Pacific Realty Associates, L.P. (PacTrust) 15350 SW Sequoia Pkwy, Suite 300 Portland, OR 97224 Office: 503 624-6300 Cell: 503 523-7619 matto@pactrust.com