Loading...
ST0701-CS100810(9/7/2011) Keith Marvin - FW: Texas Accessibility Reviews Page 1 From: "Rodriguez, Jorge" <jodriguez @halff.com> To: Keith Marvin <kmarvin @coppelltx.gov> Date: 8/10/2010 9:51 AM Subject: FW: Texas Accessibility Reviews Attachments: Invoice Blvd at Coppell.doc; Southwestern Boulevard Improvemen ts_report.pdf Keith I sent this email to Texas Accessibility Reviews last week and also I called yesterday to Kerry Arrington leaving a message. I'll submit one set of black line prints to your attention for review no later than Thursday. Please call me if any question Thanks Jorge From: Rodriguez, Jorge Sent: Thursday, August 05, 2010 10:02 AM To: 'txadareview @tx.rr.com' Cc: Richard Odell; kharris @lhlacy.com; matto @pactrust.com Subject: Texas Accessibility Reviews Good morning Kerry I would like to inform you that Southwestern Blvd improvements is completed. I would like to schedule the TDLR inspection as soon as you can. The City, contractor and us must participate. Please see attached copies of your plan review report and invoice Please let me know Thanks very much Jorge L. Rodriguez, P.E. Project Manager [cid:image001.jpg @01 CB3484.A80E7BC0] HALFF ASSOCIATES, INC. 1201 North Bowser Road Richardson, Texas 75081 Phone 214 - 346 -6203 Fax 214 - 739 -0095 www.halff.com 0 2537 Pilgrim Rest Drive Dallas, Texas 75237 Phone: 214-597-3429 Fax: 972-296-0237 txadanevievx@tx.rr.corn Matt Oyen PacTmst 15350 Sequoia Parkway Portland, C}0S7224 Re Southwestern Boulevard Improvements R.O.W. CoppnURdtoBe0inand CoppeU.TX 75018 PLAN REVIEW—COMPLETED Dear: Mr. Oyen Enclosed are the results of the plan review completed on the referenced facility. Identified on the report are areas of nonconformance with accessibility standards adopted bv the Texas Department of Licensing and Regulation for purposes of ensuring compliance with Texas Government Code, Chapter 4O0. Although deficiencies may have been noted, the referenced project may bo eligible for inspection approval if constructed in accordance with the Texas Accessibility Standards. Items which are the responsibility ofthe owner should be referred to the appropriate person for action. The building or facility owner must request an inspection from our office no later than thirty (3O) days after the completion of construction. |fthe completion date provided on the Project Registration Form isnnlonger oomaot, notify this office (in writing) of the revised completion date as soon aspossible. This determination does not address applicability ofthmAmericonnvvith Disabilities Act (\DA).(P.L1U1-336).nr any other local, state, orfederal requirement. For information on the ADA. call the AOA Hotline, (8OO)S49- 4232or the United States Department of Justice at(2O2)514-O3O1. Please reference the Department assigned project number in all future correspondence pertaining to this project. Thanks, Kerry Arrington RAS �-fb52 Texas Accessibility Specialist Texas Department of Licensing and Regulations o,au Accessibility xowe^n 253r Pilgrim Rest Drive Dallas, Texas - 523 - p: 214-597-3429 fvr2-2o6-o237 Plans and Specifications Review Report Article 9102, T.C.S. Texas Accessibility Standards Project: Southwestern Boulevard Improvements R.O.W. Coppell Rd to Beltline Rd Coppell, TX 75019 Owner: Pac Trust 15350 Sequoia Parkway Portland, OR 97224 Architect: Halff Associates Project Name: Southwestern Boulevard Improvements Reviewer: cukatu, ras # 0134 Date: 06.22.09 Texas Accessibility Reviews Project Scope: TAS 4.1, 4.3, 4.5, 4.7, 4.8 and 4.29 Project Description: Build a concrete road (3800 linear ft.); Drainage, paving and utility improvements. Status: �- In compliance X — Deficiency NI — Not Indicated NA —Not Applicable Standards Page Status Notes 4.1 Minimum Requirements C0.02 All areas of newly designed or newly constructed buildings and facilities required to be accessible by 4.1.2 and 4.1.3 and altered portions of existing buildings and facilities required to be accessible by 4.1.6 shall comply with these standards, 4.1 through 4.35 unless otherwise provided in this section or as modified in a special application section. 4.3 Accessible Route NA All walks, halls, corridors, aisles, skywalks, tunnels, 4.3.1 * General general circulation routes, and other spaces that are 4.3.2 Location part of an accessible route shall comply with 4.3. 4.3.2(1) Exterior At least one accessible route within the boundary of the Routes site shall be provided from public transportation stops, 4.3.2(2) Connecting accessible parking and accessible passenger loading Routes zones, a public streets or sidewalks to the accessible building entrance they serve. The accessible route shall, to the maximum extent feasible, coincide with the route for the general public. At least one accessible route shall connect accessible buildings, facilities, elements, and spaces that are on the same site. 4.3.3 Width C201- v` The minimum clear width of an accessible route shall C206 be 36 in. except at doors. If a person in a wheelchair must make a turn around an obstruction, the minimum clear width of the accessible route shall be 42 in. minimum. 4.3.4 Passing Space 0201- 'Ni If an accessible route has less than 60 in. clear width, C206 then the passing spaces at least 60 in. by 60 in. shall be located at reasonable intervals not to exceed 100 t. 4.3.7 Slope C201- v An accessible route with a running slope greater than 0206 1:20 is a ramp and shall comply with 4.8 Nowhere shall the cross slope of an accessible route exceed 1:50. Texas Accessibility Reviews 2537 Pilgrim Rest Drive Dallas, Texas 73237 • • 1 ` i i p: 214 -397 -3429 f 91 Pagel of 2 4.3.8 Changes in Level Along C2.04 — V Changes in levels along an accessible route shall Accessible Route C2.06 comply with 4.5,2, If an accessible route has changes in level greater than f in, then a curb ramp, ramp, elevator, or platform lift shall be provided. 4.5 Ground Surfaces C0.02 v Ground surfaces along accessible routes and in 4.5. 1 General accessible rooms and spaces including floors, walks, ramps, stairs, and curb ramps, shall be firm, stable, and slip-resistant 4, 5.2 Changes in Level C2.04 — N` Changes in level zip to % in. may be vertical and C2.06 without edge treatment. Changes in level between % in. and ',z in. shall be beveled with a slope no greater than 1. Changes in level greater than l in. shall be I accomplished by means of a ramp. 4.5.4 Gratings NA If gratings are located in walking surfaces or along accessible routes they shall have spaces no greater than Y2 in. wide in one direction. If gratings have elongated openings, then they shall be placed so that the long dimension is perpendicular to the dominant I direction of travel. 4.7 Curb Ramps C2.04 — Curb ramps shall be provided wherever an accessible 4. T 1 — 4.7.6 C2.06 route crosses a curb. Maximum slopes of adjoining gutters, road surface adjacent to ramp or accessible route shall not exceed 1:20. Minimum width of ram ps 36 in. 4.8 Ramps C2.04 — Any part of an accessible route with a slope greater 4.8.2 Slope and Rise C2.06 than 1:20 (5Yo) shall be considered a ramp and shall comply with 4.8 The least possible slope shall be used for any ramp. The maximum slope of a ramp in new construction shall bel:12. The maximum rise for any run shall be 30 in (760 mm). 4.29 Detectable Warnings NI Detectable warnings shall consist of raised truncated 4.29.2 Detectable Warnings domes with a diameter of nominal 0.9 in (23 mm), as on Walking Surfaces height of nominal 0.2(5 mm) in and a center-to-center spacing of nominal 2.35 in (60mm) and shall contrast visually with adjoining surfaces, either light-on-dark, or dark-on-light. *"Comments: All of the above conditions are indicated as met per the drawing, however please comply with the general note on page CO. 02 referring to the ADA compliance. Ensure compliance during the construction andprior to requesting an inspection. Texas Accessibility Reviews 2537 Pilgrim Rest Drive Dallas, Texas 7523.7 p: 214-591 f 91 Page 2 of 2 Dallas, TX 75237 p- 214 - 597 -3429 f- 972 - 296 -0237 TO Jorge Rodriguez Halff Associates 1201 N. Bowser Rd Richardson, TX 75081 Project: Southwestern Blvd Coppell, Texas