Loading...
ST0701-CS100810 (2) (9/7/2011) Keith Marvin - RE: Final As-Built Drawings and Close Out documentsPage 1 From: Keith Marvin To:Odell, Richard; Rodriguez, Jorge CC:Harris, Kody; Oyen, Matt Date: 8/10/2010 9:34 AM Subject: RE: Final As-Built Drawings and Close Out documents Jorge, Please submit one set of black line prints for review prior to final submittal of as-builts. I have not heard back on the scheduling of the TDLR inspection. Have you requested the inspection yet? Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "Rodriguez, Jorge" <jrodriguez@halff.com> 8/10/2010 9:31 AM >>> Rick I have plan to submit the AS BUILT drawings to the City this week. I followed the construction sets with the mark-ups that Kody Harris gave to me. He told me that you went with him making your mark-ups on this sets. Please let me know if you request to review prior to submitting final ones to the City. Thanks Jorge -----Original Message----- From: Keith Marvin [mailto:kmarvin@coppelltx.gov] Sent: Tuesday, July 06, 2010 4:56 PM To: Rodriguez, Jorge; Kody Harris Cc: Richard Odell; Matt Oyen Subject: RE: Final As-Built Drawings and Close Out documents Please coordinate your as-built work with Rick O'Dell. He'll need to review and sign off on preliminary as-builts prior to submitting final ones to the city. Final submittal will be one set of mylars, one set of black line drawings, and a CD with CADD files for both projects. Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "Rodriguez, Jorge" <jrodriguez@halff.com> 7/6/2010 4:45 PM >>> Kody Could you please provide the final as-built mark-ups. I am able to start working on the preparation of the as-built drawings as soon as you provide the requested mark-ups. Thanks Jorge From: Matt Oyen [mailto:MattO@PacTrust.com] (9/7/2011) Keith Marvin - RE: Final As-Built Drawings and Close Out documentsPage 2 Sent: Wednesday, June 30, 2010 10:23 AM To: Rodriguez, Jorge; Harris, Kody; Littleton, Dave Subject: Final As-Built Drawings and Close Out documents I wanted to see if you have begun coordination on final as-builts and close out documents. I am assuming that we are close enough to complete at this point that we could begin preparation of the as-built drawings. Obviously we would like to close out this project with the City as quickly as possible and would ask that you coordinate on the as-built effort if you have not already done so. Thanks, Matthew Oyen, PE Construction Manager Pacific Realty Associates, L.P. (PacTrust) 15350 SW Sequoia Pkwy, Suite 300 Portland, OR 97224 Office: 503 624-6300 Cell: 503 523-7619 matto@pactrust.com