Loading...
ST0701-CS100713 Page 1 of 1 Keith Marvin - southwestern From:   "kmoore" <kent.moore3@verizon.net> To:   "Clay Phillips" <cphillips@ci.coppell.tx.us> Date:   7/13/2010 12:45 PM Subject:   southwestern   Clay:   Construction resumed on southwestern yesterday. A small crew is doing the finish work on the sidewalk clean-up.   Debri is in the middle lane from the storms. Talked to a man at 7-11 who was changing his tire. Said he picked up a bolt on southwestern.   Maybe a kind word to the construction foreman would result in getting the street swept. They have been good about that all along, but if there is debri in the roadway, I figure you would want to know about that.   Kent file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4C3C7602City_of...9/7/2011