ST0701-CS100713
Page 1 of 1
Keith Marvin - southwestern
From: "kmoore" <kent.moore3@verizon.net>
To: "Clay Phillips" <cphillips@ci.coppell.tx.us>
Date: 7/13/2010 12:45 PM
Subject: southwestern
Clay:
Construction resumed on southwestern yesterday. A small crew is doing the finish work on the sidewalk clean-up.
Debri is in the middle lane from the storms. Talked to a man at 7-11 who was changing his tire. Said he picked up
a bolt on southwestern.
Maybe a kind word to the construction foreman would result in getting the street swept. They have been good
about that all along, but if there is debri in the roadway, I figure you would want to know about that.
Kent
file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4C3C7602City_of...9/7/2011