Loading...
ST0701-CS100614(9/7/2011) Keith Marvin - Page 1 From: Matt Oyen <MattO @PacTrust.com> To: 'Keith Marvin' <kmarvin @coppelltx.gov> CC: Ben Chessar <BenC @PacTrust.com> Date: 6/14/2010 7:28 PM Attachments: PTR- Retail -2 Model (1).pdf Keith - per our conversation, attached is one of the initial layout thoughts we had for the Southwester lot. As I mentioned I did not do a thorough review of your development code prior to drafting this, so it may not meet all of your landscape, setback and orientation criteria. However, it is somewhat indicative of the type of development we think might work on the site. Once I have an opportunity to discuss with Benjamin what is July travel schedule is we may want to schedule a time to sit down with you and the planning staff to discuss the site. Thanks, Matt P � 1 I i Ell E f lµ } LE ; " n lw / I eb . — 1 1e �w MB +; 7 � �4 ��ER -- —� oE�c. T 6. All �.r N 6128 • �� V _ �La q T a L V + E 1 L W�sEi — l r P•Wl5 ll PtlMr f BLVD TOP 0 9e .LE o TSB ,Loose Ea V- 3 EF�10 ACV + / o , TL O a s sy .. O assn ' ssuN FL �13 FL El