Loading...
ST0701-CS100506Project Description: Southwestern Boulevard Improvements Contractor /Subcontractor: Lacy Construction Engineer's Representative: Jorge L. Rodriguez, P.E. WEATHER AND SITE CONDITIONS: Warm and Sunny EQUIPMENT ON JOBSITE: Earth moving equipments Excavation equipments STORED MATERIALS: Dirt, gravel, rebars WORK IN PROGRESS: Earthwork, paving and bridge LABOR FORCE ON JOBSITE: Equipment operators and laborers. DIRECTIONS GIVEN TO CONTRACTOR OR OTHER CONVERSATIONS WITH CONTRACTOR: NIA COMMENTS: At the time of the visit laborers were installing rock rip -rap at the bridge and also installing reinforcing to the west of the bridge. Pavement at the intersection with Coppell Road is done and looks good. No evidence of cracks. Silt fence and erosion control at different locations looks O.K. Driveway at Sta. 2 +01.8 shall be constructed as per plans to avoid conflict on this property. Inlet protections and erosion control look good. Batch plant was working. COPIES: ® OWNER ® ARCHITECT ® CONTRACTOR ❑ ® FILE Page 1 of 1 Keith Marvin - Pay application and site visit report From: "Rodriguez, Jorge" <jrodriguezghalff.com> To: "mattO @pactrust.com" <mattO @pactrust.com >, Keith Marvin <kmarvingcoppelltx. gov> Date: 5/7/2010 9:50 AM Subject: Pay application and site visit report CC: "Farris, Kody" <kharrisglhlacy.com >, "Littleton, Dave" <dlittletonghalff.com> Attachments: 2010 -25 -01 003.jpg; 2010-25-01005 jpg; 2010 -25 -01 009.jpg; 2010-25-01011 jpg; 2010 -25 -01 013.jpg; rptl 6- 05 -07- l 0.doc; 20100507signedapplication.pdf Gentlemen Please see attached field report No. 16, payment application and several pictures for your records. Please call me if any question Photo 003 .................Paving at the intersection of Southwestern Blvd. with Coppell Road Photo 005 ................. Driveway at Sta.2 +01.8 Photo 009 and 11 .... Reinforcing for pavement between STA. 7 +00 to 11.20 approximately Photo 013 .................Retaining walls I will send you additional photos on separate email due to the sizes. Thanks Jorge L. Rodriguez, P.E. Project Manager HALFF ASSOCIATES, INC. 1201 North Bowser Road Richardson, Texas 75081 Phone 214 - 346 -6203 Fax 214 - 739 -0095 www.halff.com file: / /C: \Documents and Settings \radloo \Local Settings\ Temp \XPgrpwise \4BE3E249City_of... 9/7/2011 p pw- ¢, Tt �. _ .e it b F lib L61 rw L �,•�»�� � � ®�\ � ®'�, i E � `� � � ,,� Page 1 of 1 Keith Marvin - Additional photos From: "Rodriguez, Jorge" <jrodriguezghalff.com> To: "mattO @pactrust.com" <mattO @pactrust.com >, Keith Marvin <kmarvingcoppelltx. gov> Date: 5/7/2010 10:06 AM Subject: Additional photos CC: "Farris, Kody" <kharrisglhlacy.com >, "Littleton, Dave" <dlittletonghalff.com> Attachments: 2010 -25 -01 015.jpg; 2010 -25 -01 017.jpg; 2010 -25 -01 019.jpg; 2010 -25 -01 021.jpg; 2010 -25 -01 028.jpg; 2010 -25 -01 032.jpg; 2010 -25 -01 035.jpg Hi guys Photo 015 ..................... Sub -grade preparation at the bridge connection Photo 017 .....................Aerial sanitary sewer crossing the creek Photo 019 ...................Rock Rip -Rap underneath the Bridge Photo 021 ....................Sub -grade preparation Photo 028 ................. Bullock Drive intersection Photo 032 ..................Sub -grade preparation at Belt Line Intersection Photo 035 ...............,,Sanitary Sewer Manhole at Belt Line Here are the additional photos. Please call me if any questions Thanks Jorge L. Rodriguez, P.E. Project Manager HALFF ASSOCIATES, INC. 1201 North Bowser Road Richardson, Texas 75081 Phone 214 - 346 -6203 Fax 214 - 739 -0095 www.halff.com file: / /C: \Documents and Settings \radloo \Local Settings\ Temp \XPgrpwise \4BE3E618City_of... 9/7/2011 } j ob - A { %..A; k k- x E m r L `J d r 1 fi. x E m A v m' _.� .,w -F . �? e I _ \ \�] ar \ { � * � .. .� � \ � 11 \7-11 ' �2