ST0701-CS100506Project Description: Southwestern Boulevard Improvements
Contractor /Subcontractor: Lacy Construction
Engineer's Representative: Jorge L. Rodriguez, P.E.
WEATHER AND SITE CONDITIONS:
Warm and Sunny
EQUIPMENT ON JOBSITE:
Earth moving equipments
Excavation equipments
STORED MATERIALS:
Dirt, gravel, rebars
WORK IN PROGRESS:
Earthwork, paving and bridge
LABOR FORCE ON JOBSITE:
Equipment operators and laborers.
DIRECTIONS GIVEN TO CONTRACTOR OR OTHER CONVERSATIONS WITH CONTRACTOR:
NIA
COMMENTS:
At the time of the visit laborers were installing rock rip -rap at the bridge and also installing reinforcing to the
west of the bridge. Pavement at the intersection with Coppell Road is done and looks good. No evidence of
cracks. Silt fence and erosion control at different locations looks O.K. Driveway at Sta. 2 +01.8 shall be
constructed as per plans to avoid conflict on this property. Inlet protections and erosion control look good.
Batch plant was working.
COPIES: ® OWNER ® ARCHITECT ® CONTRACTOR ❑ ® FILE
Page 1 of 1
Keith Marvin - Pay application and site visit report
From: "Rodriguez, Jorge" <jrodriguezghalff.com>
To: "mattO @pactrust.com" <mattO @pactrust.com >, Keith Marvin
<kmarvingcoppelltx. gov>
Date: 5/7/2010 9:50 AM
Subject: Pay application and site visit report
CC: "Farris, Kody" <kharrisglhlacy.com >, "Littleton, Dave" <dlittletonghalff.com>
Attachments: 2010 -25 -01 003.jpg; 2010-25-01005 jpg; 2010 -25 -01 009.jpg; 2010-25-01011 jpg;
2010 -25 -01 013.jpg; rptl 6- 05 -07- l 0.doc; 20100507signedapplication.pdf
Gentlemen
Please see attached field report No. 16, payment application and several pictures for your records. Please call
me if any question
Photo 003 .................Paving at the intersection of Southwestern Blvd. with Coppell Road
Photo 005 ................. Driveway at Sta.2 +01.8
Photo 009 and 11 .... Reinforcing for pavement between STA. 7 +00 to 11.20 approximately
Photo 013 .................Retaining walls
I will send you additional photos on separate email due to the sizes.
Thanks
Jorge L. Rodriguez, P.E.
Project Manager
HALFF ASSOCIATES, INC.
1201 North Bowser Road
Richardson, Texas 75081
Phone 214 - 346 -6203
Fax 214 - 739 -0095
www.halff.com
file: / /C: \Documents and Settings \radloo \Local Settings\ Temp \XPgrpwise \4BE3E249City_of... 9/7/2011
p pw-
¢, Tt �.
_ .e it b
F
lib L61
rw
L
�,•�»�� �
� ®�\
�
®'�, i
E �
`� � �
,,�
Page 1 of 1
Keith Marvin - Additional photos
From: "Rodriguez, Jorge" <jrodriguezghalff.com>
To: "mattO @pactrust.com" <mattO @pactrust.com >, Keith Marvin
<kmarvingcoppelltx. gov>
Date: 5/7/2010 10:06 AM
Subject: Additional photos
CC: "Farris, Kody" <kharrisglhlacy.com >, "Littleton, Dave" <dlittletonghalff.com>
Attachments: 2010 -25 -01 015.jpg; 2010 -25 -01 017.jpg; 2010 -25 -01 019.jpg; 2010 -25 -01 021.jpg;
2010 -25 -01 028.jpg; 2010 -25 -01 032.jpg; 2010 -25 -01 035.jpg
Hi guys
Photo 015 ..................... Sub -grade preparation at the bridge connection
Photo 017 .....................Aerial sanitary sewer crossing the creek
Photo 019 ...................Rock Rip -Rap underneath the Bridge
Photo 021 ....................Sub -grade preparation
Photo 028 ................. Bullock Drive intersection
Photo 032 ..................Sub -grade preparation at Belt Line Intersection
Photo 035 ...............,,Sanitary Sewer Manhole at Belt Line
Here are the additional photos.
Please call me if any questions
Thanks
Jorge L. Rodriguez, P.E.
Project Manager
HALFF ASSOCIATES, INC.
1201 North Bowser Road
Richardson, Texas 75081
Phone 214 - 346 -6203
Fax 214 - 739 -0095
www.halff.com
file: / /C: \Documents and Settings \radloo \Local Settings\ Temp \XPgrpwise \4BE3E618City_of... 9/7/2011
}
j ob -
A
{
%..A;
k
k-
x
E m
r L
`J
d r 1
fi.
x
E m
A v
m'
_.�
.,w
-F .
�? e
I
_
\ \�]
ar
\ {
� * �
.. .� �
\
� 11 \7-11
' �2