Loading...
ST0701-CN100506(9/7/2011) Keith Marvin - Bridge Conduit Detail Page 1 From: "Rodriguez, Jorge" <jodriguez @halff.com> To: "Harris, Miranda" <mharris @lh lacy. com >, "Harris, Kody" <kharris @lh lacy. com> CC: Keith Marvin <kmarvin @coppelltx.gov >, "mattO @pactrust.com" <mattO @pactru... Date: 5/6/2010 9:35 AM Subject: Bridge Conduit Detail Attachments: RFI #11 BRIDGE CONDUIT DETAIL RESPONSE.pdf Miranda The enclosed details shows how to attach the 2" conduit to the bridge. The City of Coppell shall approve the proposed detail. Please call me if any question Thanks Jorge L. Rodriguez, P.E. Project Manager [cid:image001.jpg @01 CAECFE.2DF01 ECO] HALFF ASSOCIATES, INC. 1201 North Bowser Road Richardson, Texas 75081 Phone 214 - 346 -6203 Fax 214 - 739 -0095 www.halff.com L. H. LACY COMPANY, Ltd. P.O. Box 541297 Dallas, TX 75354 -1297 Ph: (214)357 -OM I RFI To: Jorge Rodriguez RFI #: 11 Halff Associates Date: 5/4!2010 Ph: 817 -847 -1422 Fax: 817- 232 -9784 Job: 5262 Salem Blvd (SCoppell- Beltline) Phone: CC: Kody Harris (L.H. Lacy Company), Matthew Oyen (PacTrust), Miranda Harris (LH Lacy Company) Subject: Bridge Conduit Details Drawing: Cost Impact: Spec Section: Schedule Impact: Request: Date Required: 5/512010 On plan sheet C5.06 of the 0 +00 to 15 +13 plans, it shows electrical conduit crossing the bridge. I need a detail showing how to attach the 2" conduit to the bridge. Requested by: Kody Harris L.H. Lacy Company Response: q ^ ! � /'} S[�p, H �`�"I� �G� S �• C°. �'C � . t ` O i � (`/J'�_ O� -so Lo -r(o ♦J . Answered by 66(4= 6 0 d 10 Company Date Page 1 of 1 S H AL F F Made by Date AVO Task Dept. Checked by Date Sheet No. For