Loading...
ST0701-CS100427 (9/7/2011) Keith Marvin - RE: Southwestern Blvd bridge railPage 1 From: "Littleton, Dave" <dlittleton@halff.com> To: Keith Marvin <kmarvin@coppelltx.gov>, "Rodriguez, Jorge" <jrodriguez@hal... CC: Richard Odell <RODELL@coppelltx.gov>, "Littleton, Dave" <dlittleton@half... Date: 4/27/2010 4:18 PM Subject: RE: Southwestern Blvd bridge rail Thanks, Keith. -----Original Message----- From: "Keith Marvin" <kmarvin@coppelltx.gov> To: "Rodriguez, Jorge" <jrodriguez@halff.com> Cc: "Richard Odell" <RODELL@coppelltx.gov>; "Littleton, Dave" <dlittleton@halff.com>; "McCulley, Jonathan" <JMcCulley@Halff.com>; "kharris@lhlacy.com" <kharris@lhlacy.com>; "Matt Oyen" <MattO@PacTrust.com> Sent: 4/27/2010 3:45 PM Subject: Re: Southwestern Blvd bridge rail Gentlemen, The City of Coppell has reviewed the proposed alternatives to replacement of the bridge rail already constructed on the south side of the bridge. While we would not have selected the rail that was built, we will not pursue removing it any further. As such, the contractor may make the necessary arrangements to construct the rail on the north side to match the exiting one. Feel free to contact me with any questions or comments. Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "Rodriguez, Jorge" <jrodriguez@halff.com> 4/13/2010 9:37 AM >>> Keith I attach the two documents I received from the contractor in regard the Bridge Rail. Please let us know which is the final decision and how do you want us to proceed. Please call Dave Littleton at 214-346-6213 or me at 214-346-6203 if any question. Thanks very much Jorge L. Rodriguez, P.E. Project Manager [cid:image001.jpg@01CADAEC.3D814720] HALFF ASSOCIATES, INC. 1201 North Bowser Road Richardson, Texas 75081 Phone 214-346-6203 Fax 214-739-0095 www.halff.com