Loading...
ST0701-CS100416:■: 1201 North Bowser Rd. Halff A ichardson, Texas 75081 Inc. • ( 214) 346 -6200 ENGINEERS ARCHITECTS SCIENTISTS PLANNERS SURVEYORS Fax (214) 739 -0095 FIELD OBSERVATION '1' 1 AVO: 24732 & 25816 Date /time: April 16, 2010 10.30 AM Project Description: Southwestern Boulevard Improvements Contractor /Subcontractor: Lacy Construction Engineer's Representative: Jorge L. Rodriguez, P.E. WEATHER AND SITE CONDITIONS: Warm and Sunny EQUIPMENT ON JOBSITE: Earth moving equipments Excavation equipments STORED MATERIALS: Dirt, gravel, rebars WORK IN PROGRESS: Earthwork, paving, waste water and pouring concrete embankment. LABOR FORCE ON JOBSITE: Equipment operators and laborers. DIRECTIONS GIVEN TO CONTRACTOR OR OTHER CONVERSATIONS WITH CONTRACTOR: N/A COMMENTS: At the time of the visit laborers were pouring concrete embankment at the bridge. Pavement poured looks good. No evidence of cracks. Driveways at the School are done and look great. Silt fence at different locations look O.K. Sanitary sewer manhole at Belt Line is under construction. Also aerial sanitary sewer line at the Creek is under construction. Driveway at Sta. 2 +01.8 shall be constructed as per plans to avoid conflict on this property. Inlet protections and erosion control look good. Batch plant was working. COPIES: ® OWNER ® ARCHITECT ® CONTRACTOR ❑ ® FILE ., _, � u .� ,_ � �� ��_ w � `_ �� .. �� V If _-o d 0 - ,u e r 11 r Ilu I rw 31, A. :x MAIL 611- b I �- m -ot _x jr i.