ST0701-CN100413(9/8/2011) Keith Marvin - Southwestern Blvd bridge rail Page 1
From: "Rodriguez, Jorge" <jodriguez @halff.com>
To: "kmarvin @coppelltx.gov" <kmarvin @coppelltx.gov>
CC: "Littleton, Dave" <dlittleton @halff.com>
Date: 4/13/2010 9:46 AM
Subject: Southwestern Blvd bridge rail
Attachments: SWTERN BLVD 001.jpg; 5262 CO #3.pdf
Keith
I attach the two documents I received from the contractor in regard the Bridge Rail. Please let us know
which is the final decision and how do you want us to proceed. Please call Dave Littleton at 214 - 346 -6213
or me at 214 - 346 -6203 if any question.
Thanks very much
Jorge L. Rodriguez, P.E.
Project Manager
[cid:image001.jpg @01 CADAEC.3D814720]
HALFF ASSOCIATES, INC.
1201 North Bowser Road
Richardson, Texas 75081
Phone 214 - 346 -6203
Fax 214 - 739 -0095
www.halff.com
CMNGE ORDER REQUEST
Lacy
Lacon Company, LLC, General Partner
1880 Crown Road . P.O. Box 54129 • Dallas. TX 753541297 • (214) 357 -8146
TO: PacTrust
15350 SW Sequoia Pkwy, Suite 300
Portland, Oregon 97224
matto @pactrust.corin
() - Fax
INTENT OF CHANGE.
DATE:
41912010
JOB #:
5262 S o uthwestern
ATTN:
Matt Oyen _
RE:
Sanitary Sewer Laterals
LOCATION:
Cop pell, Texas
C.O. #
3
PAGE #:
I 1
An !"QTRRI=NT TO CONTRACT AMOUNT
ITEM
NO.
DESCRIPTION
UNITS
ORIG.,
QTY.
REV,
QTY
ORIG, UNIT
PRICE
REV. UNIT
PRICE
TOTAL
COST
ADDITIONAL
CAL DAYS
NEW
Railing (T411)
LF
0
150
0.00
293.25
$ 43,987.50
NEW
Temporary Traffic Railing
LF
0
176
0.00
17.25
$ 3,036.00
NEW
emporary Crash Cushion
EA
0
2
0.00
1 2,817.50
$ 5,635.00
NET AMOUNT OF THIS CHANGE
52,658.50
PRICE INCLUDES : Demolition of ex. T411 rail with type "C" windows on the south side of the existing bridge and construction of a new type T411 rail with
type "A" windows.
PRICE EXCLUDES: Traffic handling, barricades, striping, temporary pavement
SPECIAL CONDITIONS: To create a safe work area, the temporary crash cushions and temporary traffic barrier will have to be moved approximately ten
feet south of their present location during the construction of this new traffic rail. Two way traffic will be north of this re- located traffic barrier during the
construction of the new rail.
AGREEMENT
All terms, conditions, specifications, etc. as outlined in your original contract will apply to this addendum.
Your signature in the space provided below will constitute acceptance of this addendum.
Please sign and return one copy for our records.
Contractor
Owner
L H Lacy pany Ltd
PacTrust
BY: f/ _ J�
BY
DATE: 4/9/2010
I ,_
tfieseler Page 1 4/9/2010
ASHLAR CONTRACTING COMPANY
P. 0. BOX 713
LEWISVILLE, TX 75067
PH: 436 5509 FAX:436 6969
WITINEERM
RE- SOUTHWESTERN BLVD, COPPELL, TX
The followin i's meant to provide clarification for the proposal to replace the existin T411 rail on the south side of
the brid
1. The cost, of the new
it is more than the ori due to several reasons. The ori bid was red
from its actual price and olaced in mobilization. The cost for demolition is amiroximateiv 25%,of t
0
accountable.
3. Our schedule for pourin the phase 2 portion of the rail is,- The second We r
ek in May.