ST0701-CS100409 (9/8/2011) Keith Marvin - FW: Job #5262 Change Order # 3Page 1 From: "Rodriguez, Jorge" <jrodriguez@halff.com> To: "kmarvin@coppelltx.gov" <kmarvin@coppelltx.gov> Date: 4/9/2010 4:38 PM Subject: FW: Job #5262 Change Order # 3 Attachments: mm 2010-04-09 Lacy.doc Keith I sent this email before with copy to you but I wrote your email address wrong. Thanks Jorge From: Rodriguez, Jorge Sent: Friday, April 09, 2010 4:26 PM To: 'Harris, Miranda'; 'kharris@lhlacy.com' Cc: 'mattO@pactrust.com'; 'marvin@coppelltx.go'; Littleton, Dave Subject: RE: Job #5262 Change Order # 3 Hi guys Please see attached memo for clarification of your proposal for the bridge rail Thanks Jorge From: Harris, Miranda [mailto:mharris@lhlacy.com] Sent: Friday, April 09, 2010 2:58 PM To: MattO@pactrust.com Cc: Rodriguez, Jorge; Harris, Kody Subject: Job #5262 Change Order # 3 Please contact us with any questions. Thank you, Miranda Harris LH LACY COMPANY 1880 Crown Rd. Dallas TX 75234 Office: 214-357-0146 Fax: 214-350-0662 Halff Associates, Inc. 1201 North Bowser Road Richardson, Texas 75081 (214) 346-6200 Fax (214) 739-0095 MEMORANDUM TO:DATE: Kody Harris April 9, 2010 Lacy FROM: AVO: Jorge L. Rodriguez, P.E. 24732-25816 EMAIL: jrodriguez@halff.com SUBJECT: Southwestern Boulevard - Coppell, Texas I received your proposal for the Bridge rail and I would like clarification of the following aspects: 1. - The original Bid shows an amount of $20,325.00 to build a type T411 bridge rail and your proposal shows $43,987.50 for demolition and construction of new rail. I understand that this operation would be more expensive than the original construction cost, but I would like clarification why the cost is more than double the original cost. 2.- I also requested a proposal to saw cut concrete around each Type "C" window leaving #7 bars in place and rebuild as Type "A" window. As requested, please provide a proposal for this option. 3. - Please let me know when you have scheduled to install the Type C411 bridge rail to the other side of the bridge, so we may coordinate this installation to either match existing or the modified rail. I would appreciate your promptly clarification to my questions. Thanks very much Jorge L. Rodriguez, P.E. Project Manager C:\DOCUME~1\radloo\LOCALS~1\Temp\XPgrpwise\mm 2010-04-09 Lacy.doc