ST0701-CN100406Lacy Lacon Company, LLC, General Partner 1880 Gown Road • P O Sax 54129 • Dallas. T% 75354 -1297 • (214) 357 -0146 TO: PacTrust 15350 SW Sequoia Pkwy, Suite 300 Portland, Oregon 97224 matto @pactrust,com () - Fax INTENT OF CHANGE: CHANGE ORDER REQUEST DATE: 416/2010 JOB #: 5262 Southwestern ATTN: Matt O en RE: Aerial Sanitary Crossin LOCATION: Coppell,Texas C.O. # Revised PAGE #: 1 ADJUSTMENT ITEM NO.. TO CONTrzAC I AMUUIV I =GR . ORIG. UNIT REV. UNIT TOTAL ADDITIONAL DESCRIPTION UNIT PRICE PRICE COST CAL DAYS Aerial Sanitary Crossing Is - 0 1 0 $31,000.00 $31,000.00 10 Remove Old Pie If 233 Sewer By-Pass Is 1 Construct Pipe Su ort ea 1 Install New Pie If 233 Construct Concrete Collar & Trainsition Cou lin 2 ea Connect Ex B1 Laterial to New MH 1 ea Eliminate MH 1 ea NET AMOUNT OF THIS CHANGE $ 31,000.00 10 CONDITIONS: The above is based on an email from Mr. Kieth Marvin with the City of Coppell dated March 24, 2010. Upon approved construction drawings, the above will be adjusted accordingly. AGREEMENT Ail terms, conditions, specifications, etc, as outlined in your original contract will apply to this addendum. Your signature in the space provided below will constitute acceptance of this addendum. Please sign and return one copy for our records. Contractor Owner L H Lac y, Lltd PacTrust BY: JA BY: S. Muraws DATE. 4/6/2010 DATE: Douglas McAfee Page 1 4/6/2010 (9/8/2011) Keith Marvin - Re: FW: Job #5262 Change Order # 2 Rev Page 1 From: Keith Marvin To: Oyen, Matt Date: 4/5/2010 5:55 PM Subject: Re: FW: Job #5262 Change Order # 2 Rev Attachments: #Southwestern Blvd Amendment - 3 AMENDMENT.doc Here you go Matt. I did just talk to Kody about the pricing too. They will review it in the morning. Keith Keith Marvin, P.E. Project Engineer (972) 304 -3681 >>> "Matt Oyen" < a O@PacTr s .co > 4/5/2010 4:16 PM >>> I have not studied the differences in the two plans that Lacy utilized for their change order pricing, but the revised total increased by almost $12,000. 1 certainly think we should walk through the revised number with Kody to understand where this increase has come from, but you obviously have a better grasp of what the changes consisted of. I was going to give Kody a call to walk me through this, but wanted to forwarded it along to you as I know you were trying to get everything in tomorrow. Thanks, Matthew Oyen, PE Construction Manager Pacific Realty Associates, L.P. (PacTrust) 15350 SW Sequoia Pkwy, Suite 300 Portland, OR 97224 Office: 503 624 -6300 Cell: 503 523 -7619 matto@pactrust.com From: Harris, Miranda f ail o: harris@lhlacy.co l Sent: Monday, April 05, 2010 1:29 PM To: Matt Oyen Cc: Rodriguez, Jorge; Harris, Kody Subject: Job #5262 Change Order # 2 Rev (9/8/2011) Keith Marvin - Re: FW: Job #5262 Change Order # 2 Rev Page 2 Please see the attached revised change order. Please contact us with any questions. Thank you, Miranda Harris LH LACY COMPANY 1880 Crown Rd. Dallas TX 75234 Office: 214 - 357 -0146 Fax: 214 - 350 -0662 Amendment To Purchase Agreement This AMENDMENT to the PURCHASE AGREEMENT is made by and between the City of Coppell, Texas (the "City "), and PW Commerce Center, LP, a Texas Limited Partnership (the "Company "), acting by and through their respective authorized officers. RTi'.CITAT.0 WHEREAS, City and Company entered into a PURCHASE AGREEMENT on or about August 28, 2008 to construct the "Project "; WHEREAS, Company is diligently working towards completion of the Project, the scope of which is detailed in the original agreement; WHEREAS, City desires to expand the scope of the Project to include a new aerial sewer line crossing consisting of the installation of 188 additional feet of sewer line, one additional pier, concrete collars, removal of manholes, and connection to an existing manhole, as indicated in the drawing included herewith, which has been provided to Company for review and pricing purposes; WHEREAS, the Company agrees to expand the original scope to include this additional work for the lump sum price of $XX,XXX, to be paid by City to Company within 30 days of completion of this work. NOW THEREFORE, be it resolved that the original PURCHASE AGREEMENT is hereby amended to include the additional work listed herein, and shown in the attached exhibits. City hereby agrees to increase the purchase price by $XX,XXX to compensate Company for all costs associated with this additional work. All other provisions of the contract are to remain in place. EXECUTED in duplicate originals on the day of , 2010. CITY OF COPPELL, TEXAS PW Commerce Center, LP L- go Clay Phillips, City Manager David W. Ramus, Vice President