Loading...
ST0701-CS091215 (9/8/2011) Keith Marvin - Fwd: RE: Southwestern Blvd ConstructionPage 1 From: Rhonda Adloo Subject: Fwd: RE: Southwestern Blvd Construction >>> Louis Macias <lmacias@coppellisd.com> 12/15/2009 2:22 PM >>> Keith, all is set for the disconnect of the flasher, let me know when you are ready for the other one to be done. Thanks, Louis