Loading...
ST0701-CS100119 (9/8/2011) Keith Marvin - RE: new location for stub out at Sta. 0+48.12Page 1 From: Keith Marvin To:Oyen, Matt; Rodriguez, Jorge CC:Harris, Kody; Littleton, Dave; Odell, Richard Date: 1/19/2010 11:48 AM Subject: RE: new location for stub out at Sta. 0+48.12 Gentlemen, We have looked at the new location, and have no objection to this proposal. I agree with Matt that the manhole will likely be necessary if this stub out is used in the future, but does not appear to be needed at this time. We also intend to eliminate the manhole located at station 0+00 as part of our change order to add the new areal crossing. Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "Matt Oyen" <MattO@PacTrust.com> 1/15/2010 3:41 PM >>> Is it necessary to construct the manhole on the Southside at this time? ________________________________ From: Rodriguez, Jorge [mailto:jrodriguez@halff.com] Sent: Friday, January 15, 2010 1:39 PM To: Keith Marvin; Matt Oyen Cc: Harris, Kody; Littleton, Dave Subject: new location for stub out at Sta. 0+48.12 Keith and Mat I received a message from Kody stating that the area to the south of the proposed location for Lat B-1 stub out (STA 1+06.8) was paved. The attached sketch shows a new location for this stub out at the original Sta 0+48.12. We maintain the 3" clearance at the storm drain crossing location as shown. This new stub out location request to install a 4' manhole as shown. I would like to know any comments from the City before we proceed with the updated drawing and also request to the contractor does not pave the area until we resolve this issue. Thanks Jorge Rodriguez, P.E. Project Manager HALFF ASSOCIATES, INC. 1201 N. Bowser Road Richardson, Texas 75081 Phone 214-346-6203 Fax 214-739-0095 www.halff.com