ST0701-CS100208:■: 1201 North Bowser Rd.
Halff A ichardson, Texas 75081
Inc. • ( 214) 346 -6200
ENGINEERS ARCHITECTS SCIENTISTS PLANNERS SURVEYORS Fax (214) 739 -0095
FIELD OBSERVATION RE
AVO: 24732 & 25816 Date /time: February 5, 2010
3:00 PM
Project Description: Southwestern Boulevard Improvements
Contractor /Subcontractor: Lacy Construction
Engineer's Representative: Jorge L. Rodriguez, P.E.
WEATHER AND SITE CONDITIONS:
Cool, Sunny and Wet
EQUIPMENT ON JOBSITE:
Earth moving equipments
Excavation equipments
STORED MATERIALS:
Dirt, gravel, storm drain, and water pipes
WORK IN PROGRESS:
Earthwork, water, waste water, storm drain, bridge and pavement preparation.
LABOR FORCE ON JOBSITE:
Equipment operators and laborers.
DIRECTIONS GIVEN TO CONTRACTOR OR OTHER CONVERSATIONS WITH CONTRACTOR:
N/A
COMMENTS:
At the time of the visit laborers were pouring concrete on the bridge. Concrete pavement for the road was
done in several areas from Coppell Road to Denton Tap. Water main and wastewater are under construction
from the bridge to Belt Line Road. Storm drain main line is almost done from the bridge to Belt Line. Inlet
protections and erosion control look good. Pavement also looks good. Batch plant was working.
COPIES: ® OWNER ® ARCHITECT ® CONTRACTOR ❑ ® FILE
Page 1 of 1
Keith Marvin
From: "Rodriguez, Jorge" <jrodriguezghalff.com>
To: Matt Oyen <Matt0gPacTrust.com>
Date: 2/8/2010 10:04 AM
CC: Keith Marvin <kmarvin @ci.coppell.tx.us >, Kody Farris <kharris @lhlacy.com >,
"Littleton, Dave" <dlittletonghalff.com>
Attachments: 20100208signed pay application.pdf; 2010-25-01001 jpg; 2010-25-01005 jpg; 2010-
25-01 01O.jpg; 2010-25-01011 jpg; 2010-25-01015 jpg; 2010-25-01021 jpg; 2010 -25-
01025 jpg; 2010 -25 -01 029.jpg; rptl 1- 02 -05- l O.doc
Matt
I attach the signed application for payment # 5 and field report no. 10 for your records. I also attach several
pictures. I will sent you the original application for payment by mail. Please call me if any question
Photo 001 Pavement at Coppell Rd intersection
Photo 005 Pavement nearest the Bridge
Photo 010 Pouring concrete on the Bridge
Photo 011 Bridge Slab
Photo 015 Pavement to the East side of the Bridge
Photo 021 Sub grade preparation
Photo 025 Storm pipe to the east
Photo 029 Wye Inlet
Jorge Rodriguez, P.E. MEN
Project Manager 1BUE HALFF
HALFF ASSOCIATES, INC.
1201 N. Bowser Road
Richardson, Texas 75081
Phone 214 - 346 -6203
Fax 214 - 739 -0095
www.halff.com
file: / /C: \Documents and Settings \radloo \Local Settings \Temp \XPgrpwise \4B6FE 1 BCCity_o... 9/8/2011
,yam p
i�r nir_r UdE — _ate
¥
2 ~
pq ' ` 'AG
LN
, ..
r �
ii
m d w oo - � dp
�_
.',
a =._:,
�`� ��
,� , ,.
,�"
-
- � �;�� �
�.�
�.
46
E W-r-
N i �701111
% 'o m%4 WMIMI 6-
FT jTj W�p
L it - L
Rj
or
- X J � °� ,P - � k,
-
ir
a,� M
m
®• 1 �.
® 440
LahbL
•
d