Loading...
ST0701-CS100208:■: 1201 North Bowser Rd. Halff A ichardson, Texas 75081 Inc. • ( 214) 346 -6200 ENGINEERS ARCHITECTS SCIENTISTS PLANNERS SURVEYORS Fax (214) 739 -0095 FIELD OBSERVATION RE AVO: 24732 & 25816 Date /time: February 5, 2010 3:00 PM Project Description: Southwestern Boulevard Improvements Contractor /Subcontractor: Lacy Construction Engineer's Representative: Jorge L. Rodriguez, P.E. WEATHER AND SITE CONDITIONS: Cool, Sunny and Wet EQUIPMENT ON JOBSITE: Earth moving equipments Excavation equipments STORED MATERIALS: Dirt, gravel, storm drain, and water pipes WORK IN PROGRESS: Earthwork, water, waste water, storm drain, bridge and pavement preparation. LABOR FORCE ON JOBSITE: Equipment operators and laborers. DIRECTIONS GIVEN TO CONTRACTOR OR OTHER CONVERSATIONS WITH CONTRACTOR: N/A COMMENTS: At the time of the visit laborers were pouring concrete on the bridge. Concrete pavement for the road was done in several areas from Coppell Road to Denton Tap. Water main and wastewater are under construction from the bridge to Belt Line Road. Storm drain main line is almost done from the bridge to Belt Line. Inlet protections and erosion control look good. Pavement also looks good. Batch plant was working. COPIES: ® OWNER ® ARCHITECT ® CONTRACTOR ❑ ® FILE Page 1 of 1 Keith Marvin From: "Rodriguez, Jorge" <jrodriguezghalff.com> To: Matt Oyen <Matt0gPacTrust.com> Date: 2/8/2010 10:04 AM CC: Keith Marvin <kmarvin @ci.coppell.tx.us >, Kody Farris <kharris @lhlacy.com >, "Littleton, Dave" <dlittletonghalff.com> Attachments: 20100208signed pay application.pdf; 2010-25-01001 jpg; 2010-25-01005 jpg; 2010- 25-01 01O.jpg; 2010-25-01011 jpg; 2010-25-01015 jpg; 2010-25-01021 jpg; 2010 -25- 01025 jpg; 2010 -25 -01 029.jpg; rptl 1- 02 -05- l O.doc Matt I attach the signed application for payment # 5 and field report no. 10 for your records. I also attach several pictures. I will sent you the original application for payment by mail. Please call me if any question Photo 001 Pavement at Coppell Rd intersection Photo 005 Pavement nearest the Bridge Photo 010 Pouring concrete on the Bridge Photo 011 Bridge Slab Photo 015 Pavement to the East side of the Bridge Photo 021 Sub grade preparation Photo 025 Storm pipe to the east Photo 029 Wye Inlet Jorge Rodriguez, P.E. MEN Project Manager 1BUE HALFF HALFF ASSOCIATES, INC. 1201 N. Bowser Road Richardson, Texas 75081 Phone 214 - 346 -6203 Fax 214 - 739 -0095 www.halff.com file: / /C: \Documents and Settings \radloo \Local Settings \Temp \XPgrpwise \4B6FE 1 BCCity_o... 9/8/2011 ,yam p i�r nir_r UdE — _ate ¥ 2 ~ pq ' ` 'AG LN , .. r � ii m d w oo - � dp �_ .', a =._:, �`� �� ,� , ,. ,�" - - � �;�� � �.� �. 46 E W-r- N i �701111 % 'o m%4 WMIMI 6- FT jTj W�p L it - L Rj or - X J � °� ,P - � k, - ir a,� M m ®• 1 �. ® 440 LahbL • d