FIELD OBSERVATION RE
AVO: 24732 & 25816 Date /time: March 4, 2010
3:00 PM
Project Description: Southwestern Boulevard Improvements
Contractor /Subcontractor: Lacy Construction
Engineer's Representative: Jorge L. Rodriguez, P.E.
WEATHER AND SITE CONDITIONS:
Cool and Sunny
EQUIPMENT ON JOBSITE:
Earth moving equipments
Excavation equipments
STORED MATERIALS:
Dirt, gravel, storm drain
WORK IN PROGRESS:
Earthwork, water, waste water, storm drain, bridge and pavement preparation.
LABOR FORCE ON JOBSITE:
Equipment operators and laborers.
DIRECTIONS GIVEN TO CONTRACTOR OR OTHER CONVERSATIONS WITH CONTRACTOR:
N/A
COMMENTS:
At the time of the visit laborers were installing the pavement steel from Belt Line to the Creek. Traffic was
open through the new road from Coppell Road to near the bridge. Water main is complete from Coppell Road
to the creek and also the storm drainage pipes installation. The rest of the utilities are under construction.
Pavement poured looks good. No evidence of cracks. Several driveways to access the properties were
constructed. Driveway at Sta. 2 +01.8 seems that was constructed too high. I recommend checking elevations
to avoid future conflict to access this property. Wastewater is under construction from the bridge to Belt Line
Road. Storm drain main line is almost done from the bridge to Belt Line. Inlet protections and erosion control
look good. Batch plant was working.
COPIES: ® OWNER ® ARCHITECT ® CONTRACTOR ❑ ® FILE
Page 1 of 1
Keith Marvin - Payment application No.6 and site visit report no. 12
From: "Rodriguez, Jorge" <jrodriguezghalff.com>
To: Matt Oyen <Matt0gPacTrust.com>
Date: 3/5/2010 2:23 PM
Subject: Payment application No.6 and site visit report no. 12
CC: Keith Marvin <kmarvin @ci.coppell.tx.us >, Kody Farris <kharris @lhlacy.com >,
"Farris, Miranda" <mharrisglhlacy.com>
Attachments: 20100305signed appl. no.6.pdf; rptl 2- 03 -04- l 0.doc; 2010 -03 -04 001- resize.jpg; 2010-
03-04 004- resize.jpg; 2010 -03 -04 005- resize.jpg; 2010 -03 -04 013- resize.jpg; 2010 -03-
04 014- resize.jpg; 2010 -03 -04 017- resize.jpg; 2010 -03 -04 019- resize.jpg; 2010 -03 -04
025- resize.jpg; 2010 -03 -04 023- resize.jpg
Matt
I attach the signed application fro payment No.6 and the field report No. 12 for your records. I also attach several
pictures. I will sent you the original application by mail. Please call me if any question.
Photo 001: Pavement preparation near to Belt Line
Photo 004: Pavement preparation at Belt Line
Photo 005: Pavement preparation from Belt Line to the creek
Photo 013: Bridge
Photo 014: Bridge
Photo 017: Pavement at Coppell Road with SW Boulevard intersection
Photo 019: Driveway
Photo 023: Curb inlet
Photo 025: Pavement at Coppell Road with SW Boulevard intersection
Thanks
Jorge Rodriguez, P.E.
Project Manager
HALFF ASSOCIATES, INC.
1201 N. Bowser Road
Richardson, Texas 75081
Phone 214 - 346 -6203
Fax 214 - 739 -0095
www.halff.com
file: / /C: \Documents and Settings \radloo \Local Settings\ Temp \XPgrpwise \4B9113CFCity_of... 9/8/2011
�' � .,r
�� „_' �
w. .
- 1
r - 1 i
2 u � ® 1 Avg
- 116 1
E
-
-
M. - .
Le
1
e — fir• -�� � r ,'
. -
�,� P : ® °� •^
„ �-
�' j •
_ ,% 2 • . r . 1 lu. _
oie
P
ii� l 5 �r� ° y � ■ � 1 ry
• . .. 1•s F
. 1 :° . � s . - • 11,1
° _
i
r
W _
.L�F °��
-`
.• P .1
tt•6.
i
�_E
rL
_
r
..
i ..
-`
.• P .1
tt•6.
i
�_E
-
"
'
`
~- L .
.: .
-
m�
�
m -
..
-
"
��' '
� `
�w —
'���
n� m
. � � �
�,�
�s
��
M�M6�,�
ti
a
L
.r
�-
u � �
1
psi
17rj
r e miw
` - .
c
r
rW
r
f -
` - .
o
W ,
■ ■ °: _ _ °
■ or A
—
ltr
r