Loading...
Royal Oaks-CS110906 T. Tabor Consulting PLLC (Firm ID# 5279) Civil, Mechanical & Electrical Engineering 3340 Roy Orr Blvd. Suite 208 Grand Prairie, TX 75050 September 6, 2011 Michael Garza, EIT City of Coppell 255 Parkway P.O. Box 9478 Coppell, Texas 75019 RE: Royal Oaks Construction Plan Review Comments 2011 -09 -01 The following are responses to the City of Coppell review comments: General Comments 1. Plans are not to scale, may be a printing issue. a. Will comply. Grading Plan 2. Show to remove all existing driveways along Heartz Rd. and Sandy Lake Rd. that are applicable. a. Will comply. 3. You have a 2.5 foot drop behind lots 12, 13, and 14. Our minimum slope is4:1; this does not comply, a short wall will need to be built or the lots need to be re- graded. a. We are in contact with Lutheran Church for permission to flow a portion of the site onto their parking lot and avoid removal of trees in this area. Water / Sewer 4. Leave the existing water meters in place along Heartz Rd You can still run the service to the location you would like. a. Will comply. 5. What will you do with the existing meter on Sandy Lake Rd North of Lot 6? a. Will comply. 6. You have enough depth in the sanitary sewer in Sandy Lake Rd. you may be able to make one run to serve the whole property and be able to have more depth in front of lot 1. Just a suggestion a. Will consider this option if conflicts occur during construction 7 Show all the existing utilities in Sandy Lake Rd. - there are 2 -30" water lines. a. Will comply. 8 See this plan sheet for valve location in red pen a. Will comply. 972 - 896 -6989 Page 1 of 2 TTabor @TTC- PLLC.COM Storm sewer 9 The Director of Engineering has requested that you use the existing stub -out on Heartz Rd. The city does not want to have parallel systems along Heartz Rd. The actual stub out may not be on the angle shown in the as- builts. It is unconventional but the flow is not that high. a. Will comply. If you have any questions please contact us. Respectfully Submitted, Tommy D. Tabor PE President G" - L L � () 1 AUG, \ 972 - 896 -6989 Page 2 of 2 TTabor @TTC- PLLC.COM