ST0701-CS100323:■: 1201 North Bowser Rd.
Halff A ichardson, Texas 75081
Inc. • ( 214) 346 -6200
ENGINEERS ARCHITECTS SCIENTISTS PLANNERS SURVEYORS Fax (214) 739 -0095
FIELD OBSERVATION RE
AVO: 24732 & 25816 Date /time: March 23, 2010
2:00 PM
Project Description: Southwestern Boulevard Improvements
Contractor /Subcontractor: Lacy Construction
Engineer's Representative: Jorge L. Rodriguez, P.E.
WEATHER AND SITE CONDITIONS:
Warm and Sunny
EQUIPMENT ON JOBSITE:
Earth moving equipments
Excavation equipments
STORED MATERIALS:
Dirt, gravel, rebars
WORK IN PROGRESS:
Earthwork, waste water and complete demolition of the existing bridge
LABOR FORCE ON JOBSITE:
Equipment operators and laborers.
DIRECTIONS GIVEN TO CONTRACTOR OR OTHER CONVERSATIONS WITH CONTRACTOR:
I spoke to the contractor about an adjustment to the swale at STA 17 +50 approximate. We will check if the
area to west could drain to the creek. I also talk to adjust the driveway nearest to Coppell Road.
COMMENTS:
At the time of the visit the bridge and two lanes were open to the traffic from the Bridge to Belt Line Road.
Laborers were working in the earthwork to the other side of the road Utilities are almost done. Pavement
poured looks good. No evidence of cracks. Driveway at Sta. 2 +01.8 seems that was constructed too high. I
talk to Kody and he is aware about and shall be fixed. Inlet protections and erosion control look good. Batch
plant was working.
COPIES: ® OWNER ® ARCHITECT ® CONTRACTOR ❑ ® FILE
(9/9/2011) Keith Marvin -field REPORT NO. 13 Page 1
From: "Rodriguez, Jorge" <jodriguez @halff.com>
To: Matt Oyen <MattO @PacTrust.com >, Keith Marvin <kmarvin @ci.coppell.tx.us>
CC: "kharris @lhlacy.comif <kharris @lh lacy. com >, "Littleton, Dave" <dlittleton...
Date: 3/25/2010 11:11 AM
Subject: field REPORT NO. 13
Attachments: rpt13- 03- 23- 10.doc; 2010 -03 -23 001.jpg; 2010 -03 -23 005.jpg; 2010 -03 -23 008.
j pg; 2010 -03 -23 009. j pg; 2010 -03 -23 015. j pg; 2010 -03 -23 017. j pg; 2010 -03 -23
023. j pg; 2010 -03 -23 031. j pg
Mat and Keith
I attach field report No. 13 and several pictures that I took for your records. Please call me if any question..
Photo 001 .............
Bridge demolition
Photo 005 ..............
Bridge
Photo 008 .............
Road Detour
Photo 009 ..............
Driveway at Sta. 2 +01.8
Photo 015 ..............
Roadway
Photo 017 ..............Wye
inlet
Photo 023 ..............Earthwork
in front of the school
Photo 031 ..............Earthwork
at Belt Line Rd. intersection
Thanks
Jorge Rodriguez, P.E.
Project Manager
[cid:550255115 @25032010 -1 ACC]
HALFF ASSOCIATES, INC.
1201 N. Bowser Road
Richardson, Texas 75081
Phone 214 - 346 -6203
Fax 214 - 739 -0095
www.halff.com
aa �
w
r
i 7
w
.
k
-
=
�a
. /
/
AL
\
:-
..,
-
a
lib
: . ON
r2 � �
- C
r
a � " E� � ,�
�, "� �A
:,
�w
�: +
R - - - -'�
�- � -, -
�'� _Z '
TV
6
_d
4 3 ,
9 .
V
lw
. .
j o
Ar
At 6 L _ • �� ° - A6 E
ry
a_. Y s
L r
16 16
9 P
s
r E -
® �' d . a� ° -� �!' �Y - W: O
` . ., .
. a Ll
'If jr It*
% WL
ff
<,
.M
n
I