Loading...
ST0701-CS100405 Page 1 of 1 Keith Marvin - FW: Job #5262 Change Order # 2 Rev From:   "Matt Oyen" <MattO@PacTrust.com> To:   "Keith Marvin" <kmarvin@coppelltx.gov> Date:   4/5/2010 4:22 PM Subject:   FW: Job #5262 Change Order # 2 Rev Attachments:   5262 CO #2 Rev.pdf   I have not studied the differences in the two plans that Lacy utilized for their change order pricing, but the revised total increased by almost $12,000.  I certainly think we should walk through the revised number with Kody to understand where this increase has come from, but you obviously have a better grasp of what the changes consisted of.  I was going to give Kody a call to walk me through this, but wanted to forwarded it along to you as I know you were trying to get everything in tomorrow.   Thanks,   Matthew Oyen, PE Construction Manager Pacific Realty Associates, L.P. (PacTrust) 15350 SW Sequoia Pkwy, Suite 300 Portland, OR 97224 Office: 503 624-6300 Cell: 503 523-7619 matto@pactrust.com From: Harris, Miranda [mailto:mharris@lhlacy.com] Sent: Monday, April 05, 2010 1:29 PM To: Matt Oyen Cc: Rodriguez, Jorge; Harris, Kody Subject: Job #5262 Change Order # 2 Rev     Please see the attached revised change order.  Please contact us with any questions.   Thank you, Miranda Harris LH LACY COMPANY 1880 Crown Rd. Dallas TX 75234   Office: 214-357-0146 Fax: 214-350-0662   file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4BBA0E5FCity_o...9/9/2011