ST0701-CN100504�t
SUPPLEMENT TO AGREEMENT FOR SERVICES
CHANGE TO
SCOPE OF SERVICES AND FEES
This SUPPLEMENT to AGREEMENT FOR SERVICES to the original Agreement for Services (original Agreement dated June 30, 2009
Agreement reference number P94090723 is between City of Coppell ( "Client") and Terracon Consultants, Inc. ( "Consultant') for additional or changed
Services to be provided by Consultant for client on the Project, as described in the Agreement for Services, unless otherwise described in the Project
Information section of Consultant's Supplemental Proposal dated May 4, 2010 ( "Supplemental Proposal "), or Exhibit A to this Supplement (which
section or exhibit is incorporated into the Supplement). This Supplement is incorporated into and part of the Agreement for Services.
1. Scope of Services. The scope of the additional or changed Services are described in the Scope of Services section of the Consultant's
Supplemental Proposal, unless Services are otherwise described below or in Exhibit B to this Supplement (which section or exhibit are
incorporated into the Supplement).
Test eathwork and concrete at the intersection of Coppell Road and Southwestern Boulevard.
2. Compensation. Client shall pay compensation for the additional or changed Services performed at the fees stated in the Supplemental
Proposal unless fees are otherwise stated below or in Exhibit C to this Supplement (which section or exhibit are incorporated into the
Supplement).
See attached Exhibit C for $2,049.00
All terms and conditions of the Agreemeqt for Services shall continue in full force and effect. This Supplement is accepted and Consultant is
authorized to proceed/ // , A/
Consultant:
By:
Name/Title:
Address:
Client: City of Coppell
Date: 5/4/2010 By: Date:
Name/Title:
Suite 100
Dallas, Texas 75247
Phone: 214.630.1010 Fax: 214.630.7070
Address: 255 East Parkway Boulevard
Coppell, Texas 75019
Phone: 972- 304 -3681 Fax: 972- 304 -3570
Supplement Reference Number ( Terracon Supplemental Proposal or Project Number): 94091174
EXHIBIT '
TERRACQN CONSULTANTS, INC.
COMPENSAT
Client: City ofCoppe||
CoppoU.Texaa
Project: Coppel| Road and Southwestern Boulevard Intersection
From Bethel Road bo Southwestern Blvd.
CnppnU.Texao
Unit Rate
���AT161 0�
Engineering technician, level |. per hour (min 4Hours)
40.00
Optimum Moisture/Density ne|aUonohip(AST[ND0Q8.ea.
150J30
Attarbnng limits, each
50D0
Material finer than #2O0 sieve, each
25.00
Nuclear density gauge, per day
50.00
Vehicle charge, per trip
45.00
CONCRETE
Engineer technician, leve |. per hour (min 4Hours)
40.00
Concrete test cylinders, each
14.00
Cylinder piok+up. per hour
40.00
Vehicle charge, per trip
45.00
ENGINEERING /MANAGEMENT
Project manager, per hour 100.00
EST TOTAL COST /BUDGET
Quantity
Date: May4,2010
Project No.: 94091174
Total
8
1
1
1
2
2
Subtotal $
320.00
150.00
50.00
25.00
100.00
90.00
16
640.00
16
zu«.uo
2
80.00
O
270.00
Subtotal $
1.214.00
1
100.00
Subtotal $
100D0
Page 1 of 1
1t
SUPPLEMENT TO AGREEMENT FOR SERVICES
CHANGE TO
SCOPE OF SERVICES AND FEES
This SUPPLEMENT to AGREEMENT FOR SERVICES to the original Agreement for Services (original Agreement dated July 29, 2009
Agreement reference number P08942080A -RR is between City of Coppell ( "Client') and Terracon Consultants, Inc. ( "Consultant") for additional or
changed Services to be provided by Consultant for client on the Project, as described in the Agreement for Services, unless otherwise described in the
Project Information section of Consultant's Supplemental Proposal dated May 4. 2010 ( "Supplemental Proposal "), or Exhibit A to this Supplement
(which section or exhibit is incorporated into the Supplement). This Supplement is incorporated into and part of the Agreement for Services.
1. Scope of Services. The scope of the additional or changed Services are described in the Scope of Services section of the Consultant's
Supplemental Proposal, unless Services are otherwise described below or in Exhibit B to this Supplement (which section or exhibit are
incorporated into the Supplement).
Test eathwork and concrete to complete the Southwestern Boulevard Prioject.
2. Compensation. Client shall pay compensation for the additional or changed Services performed at the fees stated in the Supplemental
Proposal unless fees are otherwise stated below or in Exhibit C to this Supplement (which section or exhibit are incorporated into the
Supplement).
See attached Exhibit C for $3,678.00
All terms and condition of the Agreement a "Ices shall continue in full force and effect. This Supplement is accepted and Consultant is
authorized to procee .
Consultant: T raco s Client: City of Coppeil
B Date: 5/4/2010 By: Date:
Name/Title: c J. Name/Title:
Address: 8901 Carpenter Freeway, Suite 100 Address: 255 East Parkway Boulevard
Dallas, Texas 75247 Coppeil, Texas 75019
Phone: 214.630.1010
Fax: 214.630.7070 Phone: 972 - 304 -3681 Fax: 9 - 304 -3570
Supplement Reference Number ( Terracon Supplemental Proposal or Project Number): 94091193
Rev. 1
EXHIBIT C
TERRACON CONSULTANTS, INC.
COMPENSATION
Client: City ofCoppe Date May4,2010
Cnppel|.Texaa
Project: Southwestern Boulevard Project Nn. : 94091193
Coppe|Road to Grapevine Creek
CoppeU.Toxaa
Unit Rate Quantity Total
WTIT-.Tflfl�
Engineer technician, level |. per hour (min 4Hours)
40.00
24
96010
Optimum Moisture8}enodyneloUonaNp(ASTM D698), ea.
150.00
1
150.00
Atterberg limits, each
50.00
1
50.00
Material finer than #2UO sieve, each
25.00
U
-
Nuclear density gauge, per day
50.00
4
200.00
Vehicle charge, per trip
45.00
O
270.00
Subtotal $
1.630.00
�Gwqs��
Engineer technician, level |. per hour (min 4Hours)
Concrete test cylin each
Cylinder pid+up. per hour
Vehicle charge, per trip
ENGINEERING /MANAGEMENT
Project manager, per hour
EST TOTAL COST /BUDGET
40.00
24
960.0
14.00
32
448]]0
40.00
2
80.00
45.00
8
360.00
Subtotal $
1.048.00
2 200.00
$
3,678.00
Page 1 of 1