Loading...
ST0701-EM100416 EXHIBIT C TERRACON CONSULTANTS, INC. COMPENSATION Client:City of CoppellDate: April 16, 2010 Coppell, Texas Coppell Road and Southwestern Boulevard Intersection Project:Project No. : 94091174 From Bethel Road to Southwestern Blvd. Coppell, Texas Unit RateQuantityTotal EARTHWORK Engineering technician, level I, per hour (min 4 Hours)40.008 320.00 Optimum Moisture/Density relationship(ASTM D698), ea.150.001 150.00 Atterberg limits, each50.001 50.00 Material finer than #200 sieve, each25.001 25.00 Nuclear density gauge, per day50.002 100.00 Vehicle charge, per trip45.002 90.00 Subtotal$ 735.00 CONCRETE Engineering technician, level I, per hour (min 4 Hours)40.0016 640.00 Concrete test cylinders, each14.0016 224.00 Cylinder pick-up, per hour40.002 80.00 Vehicle charge, per trip45.006 270.00 Subtotal$ 1,214.00 ENGINEERING / MANAGEMENT Project manager, per hour100.001 100.00 Subtotal$ 100.00 ESTIMATED TOTAL COST / BUDGET$ 2,049.00 Page 1 of 1