Loading...
ST0701-LR100427Specified Strength: 4,000 psi @ 28 days Sample Date: 04/12/10 Sample Time: 1435 Sampled By: Francisco J. Morillo Mix ID: DCCOG504 Weather Conditions: Clear Supplier: Redi -Mix Accumulative Yards: 6 Batch Size (cy): 6 Batch Time: 1345 Plant: 136 Placement Method: Direct Discharge Truck No.: 1190 Ticket No.: 25185033 Water Added Before (gal):0 Water Added After (gal): 0 Field Test Data Sample Location: Beam #2 Test Result Specification Placement Location: Bridge, westbound Slump (in): 4 3 -5 Air Content ( %): 5.0 3 -6 Concrete Temp. (F): 85 Ambient Temp. (F): 89 Plastic Unit Wt. (pcf): 147.5 Laboratory Test Data Age at Maximum Compressive Set Specimen Diameter Area Date Date Test Load Strength Fracture No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type 1 1 6.00 28.27 04/13/10 04/19/10 7 115,090 4,070 4 1 2 6.00 28.27 04/13/10 04/26/10 14 122,630 4,340 4 1 3 6.00 28.27 04/13/10 05110110 28 1 4 6.00 28.27 04/13/10 05110110 28 Comments: Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and casl compressive strength samples. Terracon Rep.: Francisco J. Morillo Started: 1230 Reported To: Finished: 1500 Contractor: Lacy Construction Z///// Report Distribution: Reviewed By: (1) City of Coppell TX (1) City of Coppell TX (1) City of Coppell TX (2) HalffAssoc Inc Eric . Cle eland, P.E. (1) Lacy Construction (1) PacTrust Pacific Realty Associates LP Senior Proje anager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR0001, 5- 21 -09, ReO Page 1 of 1 REPORT OF SOIL-LIME MIXTURE PULVERIZATION Irerracon Consultina Enalneers & Scientists 8901 Carpenter Frwy., Suite #100 Dallas, TX 75247 (214) 630-1010 Reg No.: F -3272 Date of Service: 04/27/10 Client: PacTrust Pacific Realty Associates LP 15350 Southwest Sequoia Pkwy Ste 300 Portland, OR 97224 Contractor: Test Location: SW Boulevard W Bound Test Method: NCTCOG Report No.: 94091194.0081 Project No.: 94091194 Project: Southwestern Boulevard Grapevine Creek to Beltline Road Coppell, TX Specification Requirements: Minimum Passing 1-3/4" Sieve: 100% I Minimum Passing #4 Sieve: 60% Sample Condition: Field Moist TEST LOCATION 1-3/4" SIEVE #4 SIEVE NO. % PASSING % PASSING North Half of SW Boulevard I Sta. 27+44 - Sta. 28+75 100 66 2 Sta. 30+28 100 52 3 RETEST OF TEST#2 - Sta. 30+25 100 56 4 RETEST OF TESTS#2 & #3 - Sta. 30+25 100 64 5 1 Sta. 3+00 100 68 6 1 Sta. 0+75 100 70 Comments: Technician: B. Thomas Report Distribution: (1) PacTrust Pacific Realty Associates LP (1) City of Coppell TX (1 ) Lacy Construction (1) City of Coppell TX (2) Halff Assoc Inc Senior Project Manager d.-r 'rh is report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of Terracon.