Loading...
ST0701-LR100504REINFORCING STEEL OBSERVATIONS REPORT Report Number: 94091193.0148 Ireirracon Service Date: 04/28/10 8901 Carpenter Frwy. Report Date: 05/04/10 Dallas, TX 75247 214- 630 -1010 Reg No:F -3272 Client Project City of Coppell TX Southwestern Boulevard Attn: Keith Marvin Coppell Road to Grapevine Creek PO Box 9478 Coppell, TX Coppell, TX 75019 Proiect Number: 94091193 Drawings Utilized: Sheet SC1.2, dated May 09 Locations /Items Observed: Bridge Placement Span 1 & 3, W Bound Lanes Test Method: Visual Observation ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT Placing Drawings Approved X Bar Length and Shape �( Column Tie Spacing & Type Bar Size X Proper Bar Placement X Stirrup Spacing & Type Bar Grade X Properly Tied X Welded Splices Reber Clean X Dowel Bars in Place X Mechanical Splices Trash & Debris Removed X Proper Bar Supports X Lapped Splices X Number of Bars X Proper Cover /Clearance X Discrepancies /Comments: Any discrepancies found were corrected prior to completion of this observation. Services: Reinforcing steel (rebar) placement observation. Terracon Rep.: Jose A. Martinez Reported To: Contractor: Lacy Construction Report Distribution: (I) City of Coppell TX (1) City of Coppell TX (1) City of Coppell TX (2) Halff Assoc Inc Reviewed By: (1) Lacy Construction (1) PacTrust Pacific Realty Associates LP Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT0001. 3- 09 -10, Rev.6 Page 1 of t dgr REINFORCING STEEL OBSERVATIONS REPORT Report Number: 94091193.0154 Irerracon Service Date: 04/29/10 8901 Carpenter Frwy. Report Date: 05/04/10 Dallas, TX 75247 214- 630 -1010 Reg No: F -3272 Client Project City of Coppell TX Southwestern Boulevard Attn: Keith Marvin Coppell Road to Grapevine Creek PO Box 9478 Coppell, TX Coppell, TX 75019 Project Number: 94091193 PROJECT DATA Drawings Utilized: Sheet SC 1. 10, dated May 09 Locations /Items Observed: Wing Wall E & W of bridge on W Bound Lane Test Method: Visual Observation ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT Placing Drawings Approved X Bar Length and Shape X Column Tie Spacing & Type Bar Size X Proper Bar Placement X Stirrup Spacing & Type Bar Grade X Properly Tied X Welded Splices Reber Clean X Dowel Bars in Place X Mechanical Splices Trash & Debris Removed X Proper Bar Supports X Lapped Splices X Number of Bars X Proper Cover /Clearance X Discrepancies /Comments: Any discrepancies found were corrected prior to completion of this observation. Services: Reinforcing steel (rebar) placement observation. Terracon Rep.: Jose A. Martinez Reported To: Contractor: Lacy Construction Report Distribution: (1) City of Coppell TX (I) City of Coppell TX (1) City of Coppell TX (2) Halff Assoc Inc Reviewed By: (1) Lacy Construction (1) PacTCUSI Pacific Realty Associates LP The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT000l, 3- 09 -10, Rev.6 Page 1 of 1 dgr