Loading...
ST0701-LR100508CONCRETE COMPRESSIVE STRENGTH TEST REPORT Report Number: 94091 194.0066 1 ficell, r r a c a n Service Date: 04/09/10 8901 Carpenter Frwy. Report Date: 05/08/10 Revision 2 Dallas, TX 75247 214 - 630 -1010 Reg No:F -3272 Client Project PacTrust Pacific Realty Associates LP Attn: Matthew Oyen 15350 Southwest Sequoia Pkwy Ste 300 Portland, OR 97224 Southwestern Boulevard Grapevine Creels to Beltline Road Coppell, TX Project Number: 94091194 Material Information Sample Information Specified Strength: 4,000 psi @ 28 days Mix ID: 1701 Supplier: Lattimore Batch Time: 1404 Plant: 07 Truck No.: 1012 Ticket No.: 7215975 Field Test Data Test Slump (in): Air Content (' %,): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pct) Result Specification 3 3 -5 3.5 3 -6 75 80 146.0 Sample Date: 04/09/10 Sample Time: 1532 Sampled By: Koda W. Shadix Weather Conditions: Clear Accumulative Yards: 8.5 Batch Size (cy): 8.5 Placement Method: Direct Discharge Water Added Before (gal):0 Area Water Added After (gal): 0 Sample Location: Sta. 31 +66 Placement Location: Inlet Walls, Southwestern Boulevard, No. 1D Sta. 31 +66 to Sta. 50 +83 Laboratory Test Data Age at Maximum Compressive Set Specimen Diameter Area Date Date Test Load Strength Fracture No. 1D (in) (sq in) Received Tested (days) (Ibs) (psi) Type 1 1 6.00 28.27 04/10/10 04/16/10 7 130,970 4,630 2 1 2 6.00 28.27 04/10/10 04/23/10 14 140,510 4,970 2 1 3 6.00 28.27 04/10/10 05/07/10 28 169,150 5,980 2 1 4 6.00 28.27 04/10/10 05/07/10 28 161,570 5,710 2 Average (28 days) 5,850 Comments Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required fie samples. Terracon Rep.: Koda W. Shadix Started: 1230 Reported To: Oscar / Lacy Construction Finished: 1630 Contractor: Lacy Construction Report Distribution: (I) i Pacific Realty Associates LP (I) City orCoppell TX Reviewed By: (1) Cily of Coppell Tx (2) I-lalff Assoc hic (1) Lacy Construction Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Cuuen-s- 21- u9,Rev.3 Page 1 o'f 1 Senior Project Manager