Loading...
ST0701-LR100608CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon Report Number: 94091194.0090 Service Date: 05110110 8901 Carpenter Frwy. Report Date: 06/08/10 Revision 2 Dallas, TX 75247 214- 630 -1010 Reg No: F -3272 Client PacTrust Pacific Realty Associates LP Attn: Matthew Oyen 15350 Southwest Sequoia Pkwy Ste 300 Portland, OR 97224 Project Southwestern Boulevard Grapevine Creek to Beltline Road Coppell, TX Project Number: 94091194 Material Information Sample Information Specified Strength: 4,000 psi @ 28 days Sample Date: 05110110 Sample Time: 0715 Sampled By: Tirek Driver Mix ID: Weather Conditions: Cloudy Supplier: Accumulative Yards: 10 Batch Size (cy): 10 Batch Time: Plant: Placement Method: Conveyor Truck No.: Ticket No.: Water Added Before (gal):0 Water Added After (gal): 0 Field Test Data Sample Location: FE of Belt Line Road Test Result Specification Placement Location: Southwestern Boulevard from W Slump (in): 3 1 -3 entrance to elementary school to Belt Air Content ( %): 5.0 3 -6 Line Road Concrete Temp. (F): 75 Ambient Temp. (F): 69 Plastic Unit Wt. (pcf): 147.6 Laboratory Test Data Age at Maximum Compressive Set Specimen Diameter Area Date Date Test Load Strength Fracture No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type 1 1 6.00 28.27 05111110 05/13/10 3 108,760 3,850 4 1 2 6.00 28.27 05111110 05/17/10 7 143,890 5,090 5 1 3 6.00 28.27 05111110 05/24/10 14 148,500 5,250 2 1 4 6.00 28.27 05111110 06/07/10 28 159,380 5,640 2 1 5 6.00 28.27 05111110 06/07/10 28 161,770 5,720 2 Average (28 days) 5,680 Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Tirek Driver Started: 0600 Reported To: Finished: 1430 Contractor: Lacy Construction Report Distribution: (1) PacTrust Pacific Realty Associates LP (1) City of Coppell TX (1) City of Coppell TX (2) HalffAssoc Inc (1) Lacy Construction Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CROOO1, 4.28 -10, Rev.4 Page 1 of 3 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon Report Number: 94091194.0090 Service Date: 05110110 8901 Carpenter Frwy. Report Date: 06/08/10 Revision 2 Dallas, TX 75247 214 - 630 -1010 Reg No: F -3272 Client PacTrust Pacific Realty Associates LP Attn: Matthew Oyen 15350 Southwest Sequoia Pkwy Ste 300 Portland, OR 97224 Project Southwestern Boulevard Grapevine Creek to Beltline Road Coppell, TX Project Number: 94091194 Material Information Sample Information Specified Strength: 4,000 psi @ 28 days Sample Date: 05110110 Sample Time: 1115 Sampled By: Tirek Driver Mix ID: Weather Conditions: Cloudy Supplier: Accumulative Yards: 110 Batch Size (cy): 10 Batch Time: Plant: Placement Method: Conveyor Truck No.: Ticket No.: Water Added Before (gal):0 Water Added After (gal): 0 Field Test Data Sample Location: V W of W entrance Test Result Specification Placement Location: Southwestern Boulevard from W Slump (in): 2 1 -3 entrance to elementary school to Belt Air Content ( %): 5.0 3 -6 Line Road Concrete Temp. (F): 77 Ambient Temp. (F): 72 Plastic Unit Wt. (pcf): 149.0 Laboratory Test Data Age at Maximum Compressive Set Specimen Diameter Area Date Date Test Load Strength Fracture No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type 2 1 6.00 28.27 05111110 05/13/10 3 115,180 4,070 4 2 2 6.00 28.27 05111110 05/17/10 7 163,590 5,790 5 2 3 6.00 28.27 05111110 05/24/10 14 169,960 6,010 2 2 4 6.00 28.27 05111110 06/07/10 28 175,390 6,200 2 2 5 6.00 28.27 05111110 06/07/10 28 178,620 6,320 2 Average (28 days) 6,260 Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Tirek Driver Started: 0600 Reported To: Finished: 1430 Contractor: Lacy Construction Report Distribution: (1) PacTrust Pacific Realty Associates LP (1) City of Coppell TX (1) City of Coppell TX (2) Halff Assoc Inc (1) Lacy Construction Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CROOO1, 4- 28-10, RevA Page 2 of 3 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Report Number: 94091194.0090 Irerracon Service Date: 05110110 8901 Carpenter Frwy. Report Date: 06/08/10 Revision 2 Dallas, TX 75247 214- 630 -1010 Reg No: F -3272 Client PacTrust Pacific Realty Associates LP Attn: Matthew Oyen 15350 Southwest Sequoia Pkwy Ste 300 Portland, OR 97224 Project Southwestern Boulevard Grapevine Creek to Beltline Road Coppell, TX Project Number: 94091194 Material Information Sample Information Specified Strength: 4,000 psi @ 28 days Sample Date: 05110110 Sample Time: 1330 Sampled By: Tirek Driver Mix ID: Weather Conditions: Cloudy Supplier: Accumulative Yards: 210 Batch Size (cy): 10 Batch Time: Plant: Placement Method: Conveyor Truck No.: Ticket No.: Water Added Before (gal):0 Water Added After (gal): 0 Field Test Data Sample Location: Corner of Bullock and Southwestern Test Result Specification Boulevard Slump (in): 21/2 1 -3 Placement Location: Southwestern Boulevard from W Air Content ( %): 4.5 3 -6 entrance to elementary school to Belt Concrete Temp. (F): 78 Line Road Ambient Temp. (F): 76 Plastic Unit Wt. (pef): 151.0 Laboratory Test Data Age at Maximum Compressive Set Specimen Diameter Area Date Date Test Load Strength Fracture No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type 3 1 6.00 28.27 05111110 05/13/10 3 109,150 3,860 4 3 2 6.00 28.27 05111110 05/17/10 7 139,860 4,950 5 3 3 6.00 28.27 05111110 05/24/10 14 153,870 5,440 2 3 4 6.00 28.27 05111110 06/07/10 28 158,800 5,620 2 3 5 6.00 28.27 05111110 06/07/10 28 160,400 5,670 2 Average (28 days) 5,650 Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field test: samples. Terracon Rep.: Tirek Driver Started: 0600 Reported To: Contractor: Lacy Construction Report Distribution: (1) PacTnist Pacific Realty Associates LP (1) City of Coppell TX (1) City of Coppell TX (2) Halff Assoc Inc (I) Lacy Construction Finished: 1430 Reviewed By: strength Eric J. Cleveland, P.E. Senior Project Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR0001, 4- 28-10, Rev.a Page 3 of 3