Loading...
ST8804-CS 890503'4P Jerry Parch Consulting Engineers May 3, 198~ Cop~ell, Texas 75019 21~/~62-0022 H~ID DELIVeReD RE: JP No. 88009; Heartz Road North of Sandy Lake Road; Coppell, Texas Dear Russell: Enclosed are two sets of construction plans of proposed improvements for Heartz Road between Sandy Lake Road and Parkway Boulevard in Coppell, Texas. Our last submittal to the city on April 13, 1989 included revisions based on comments received from the Department of Public Works and from Mr. Kevin Peiffer, P.E. of Ginn, Inc. provided to me in our meeting on April 7, 1989. v/Since our last submittal to the city, the following revisions have been made. 1. The plans have been revised in accordance with additional comments received from Mr. Kevin Peiffer based on our April 13th submittal. 2. Plans for brick facing on proposed box culvert headwalls have been included. 3. Plans have been revised in accordance with comments received from Mr. Dan Dowdey, P.E., Roberts & Dowdey Civil Engineers, engineers for Univest and the Coppell Health Care Center. The revisions generally included the following: A. Increase in the size of proposed Storm Drain Line "C" to a 54 inch R.C.P. B. Adjustment of the low point near Station 15+00 to avoid conflict with a proposed driveway for the Health Care Center. C. Lowering of the proposed grade shown on our submittal of April 13, 1989 from station 7+00 to Parkway Boulevard by approximately 0.5 feet. 320 ~Vestway Place, Suite 501 · Arlington, Texas 76018 · Metro (817) 467-2418 · (817) 465-0259 Mr. Russell Doyle, P.E. May 3, 1989 JP No. 88009 Page 2 of 2 D. Adjustment of the Sanitary Sewer manhole previously shown at street station 15+25 to street station 14+90. E. Deletion of the eight inch water service to the west at street station 15+25. A separate submittal of these plans along with a copy of this letter are being delivered to Ginn, Inc. and to Roberts & Dowdey. ~"Also enclosed is a report of our meeting yesterday concerning sight distance at the Heartz Road - Sandy Lake Road intersection. In addition six sets of construction plans for subgrade preparation in Heartz Road are enclosed. On behalf of ABQ Development Corporation, I request that the city authorize us to proceed with this portion of the construction at this time. If you have any questions, please call. Sincerely, Parche', P.E. JP:ch Enclosures: Two sets of construction plans - Heartz Road Letter report on Sight Distance meeting of May 2, 1989 Six sets of construction plans - Subgrade Preparation - Heartz Road cc: Mr. Jay Chester, P.E./ABQ Development Corporation Mr. Mike Allen/Univest Development Company Mr. Dan Dowdey, P.E./Roberts & Dowdey Civil Engineers w/encl. Mr. Steve Goram/City of Coppell Mr. Kevin Peiffer, P.E./Ginn, Inc. w/encl.