Loading...
ST0301A-CS090514 (9/13/2011) Keith Marvin - Re: City of Coppell ProjectsPage 1 From: Keith Marvin To:david.cheney@twcable.com; DFW Telecom, Inc.; warren.fyffe@twcable.com CC:Rassmusen, Michael; Thornhill, Caleb Date: 5/14/2009 12:14 PM Subject: Re: City of Coppell Projects Mr. Hatton, The power poles were moved months ago. A simple visit to the site by TWC personnel would show the location. In fact the pole that I believe your riser is on has not, and will not move. As far as plans go, I understood that you were coordinating with Caleb Thornhill of Freese & Nichols for electronic copies of plans. They are the designer of this section as well as the section of Bethel Road. I look forward to the submittal of Bethel Road. My question on Southwestern is relative to completion of the aerial work, and has nothing to do with underground. I would like to meet with TW Cable to discuss how we can better coordinate these CIP projects. Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "DFW Telecom, Inc." <dfw_telecom@tx.rr.com> 5/14/2009 11:39 AM >>> Keith, We have completed the design of the section along Bethel Rd from Denton Tap to Armstrong ( Penfolds ), and I submitted the plans to TWC for their review. There are no other conflicts in that area as far as I know of. However we do have one section of underground that will need to be replaced on S. Coppell Rd between Bethel and Southwestern. This section is a coax cable that feeds from the west side of S. Coppell Rd into the city service center. This cable comes off a power pole and crosses S. Coppell Rd into the service center, so placement of the new power poles is a factor that will effect our design. We will need to know where the new poles are going to be placed before we can proceed with the design on this section. If you could please forward me the AutoCAD files for road widening between Bethel and Southwestern on S. Coppell Rd. it would greatly speed up the process of our design, and ensure that we clear the proposed road widening and any city utility placement. Also please forward any plans available that show where the new power poles will be placed. I am unaware of any underground along Southwestern, all work in that area should only be aerial. If I am mistaken about that, I would also need the AutoCAD files for that section as well. Respectfully, David Hatton DFW Telecom, Inc. (9/13/2011) Keith Marvin - Re: City of Coppell ProjectsPage 2 PO Box 450251 Garland, Texas 75042 Phone: 972 / 234-2538 Fax: 972 / 234-2539 Cell: 972 / 670-2113 email: dfw_telecom@tx.rr.com ----- Original Message ----- From: "Keith Marvin" <kmarvin@ci.coppell.tx.us> To: <david.cheney@twcable.com>; <warren.fyffe@twcable.com> Cc: "Michael Rassmusen" <mike.rassmusen@twcable.com>; <dfw_telecom@tx.rr.com> Sent: Thursday, May 14, 2009 10:37 AM Subject: City of Coppell Projects David/Warren, I wanted to touch base with you on the status of our City of Coppell Projects. We opened bids for the construction of Coppell Road South (Southwestern to Bethel) on Tuesday. We plan to award the project in June, with construction beginning in July. We have yet to see a permit from you for any work in this corridor. I know you have some minor work on the aerial cable to attach to new Oncor poles and detach from the ones to be removed. There was some discussion of the underground an whether it would need to be relocated. We are continuing to move forward with Southwestern Blvd (Coppell Road to Denton Tap). I understand your new cable is in place. It appears you need to complete the demolition of the old. We expect to begin construction in June. Bethel Road (Penfolds to Denton Tap) is ready to move to construction as soon as all utilities are clear. We have been coordinating with your designer for copies of plans. I believe he has had everything for a few weeks. I hope you are making progress on these projects. Please let me know if you need anything else from us to move these forward. Keith Marvin, P.E. Project Engineer (972) 304-3681