Loading...
ST0702-CS090626 (2)(9/13/2011) Keith Marvin - coppell road south deduct Page - 1 ] From: "James Scott" <Jamess @JRJPaving.com> To: "Keith Marvin" <kmarvin @ci.coppell.tx.us> Date: 6/26/2009 5:02 PM Subject: coppell road south deduct Attachments: nevillcopier @jrjpaving com_20090626_163948.pdf Ketih, I attached the deduct here Thank you James Scott J RJ Paving 214- 466 -8430 - - - -- Original Message---- - From: Keith Marvin [ mailto :kmarvin @ci.coppell.tx.us] Sent: Friday, June 19, 2009 5:27 PM To: James Scott Subject: Kimbel Kourt James, I discussed the request for information relative to the Kimbel Kourt bid with our Purchasing Manager. He has advised me not to release the CAD files. It looks like you will need to do a take off from the sections included in the plans. Keith Keith Marvin, P.E. Project Engineer (972) 304 -3681 JRJ 214- 466 -8340 PAVING, LP P.O. Box 59934 FAX (Sales) 214 -466 -8354 FAX (Admin) 214 - 466 -8352 City of Coppell Att: Keith Marvin, P.E. Project Engineer Coppell Road South Paving and Drainage Improvements Mr. Marvin, 1805 Royal Lane, Suite 107 Dallas, TX 75229 This letter is to inform you that if the above mentioned street can be closed down in either 1 or 2 sections then their will be a deduct from item 2 traffic control. If the north section, from approximately 5 +95 — 14 +10, is closed then the deduct for the north section will be $22,914.00 If the south section, from approximately 15 +00 — 20 +30, is closed then the deduct for the south section will be $18,126.00 If both the north and south sections are closed then the total deduct will be $41,040.00 ASPHALT /CONCRETE PAVING • EXCAVATION • MILLING