ST8505-CS 881220GINN, INC.
CONSULTING ENGINEERS
December 20, 1988
Mr. Frank Trando
City of Coppell
P.O. Box 478
Coppell, TX 75019
Re:
Belt Line Road Improvements
Application for Payment No. 20
Dear Mr. Trando:
Enclosed are three (3) copies of Application for Payment No. 20
in the amount of $2,103.44 from Ed Bell Construction Co.
representing work performed on the above referenced project
through November 30, 1988.
We have reviewed this application and recommend that payment in
full be made at this time.
Sincerely,
H Wayne Ginn P.E.
KEP/HWG/dsp
enclosure: (3) Pay Applications
cc-
Ed Bell Construction Co. w/enclosure
Alan Ratliff
Randy ~l~min~ ~/~nclosuro
~±le 255 ~/enclosure
17103 Preston Road · Suite 100 · LB !18 · Dallas, Texas 75248 · Phone 214/248-4900