Loading...
ST8505-CS 881220 (2) GINN, INC. CONSULTING ENGINEERS December 20, 1988 City of ~oppell P.O. B~ 478 Coppe~, TX 75019 Re: Final Cost ~alysis of Change Order No. One (1) ~lt ~ne Road (South) Improvements - CIP Coppell, TX Dear Mr. Doyle: Please find enclosed an itemized cost analysis for Change Order No.. One (1) on the above referenced project. Also enclosed are copies of the original Change Order No. One (1) along with a Ginn, Inc. letter regarding extra work under this change order. This change order was initiated by Conne11 Development Co., and as a result, an escrow account was established with the City of C0ppell prior to the City Council's authorization for this work. At this time all of the items have been completed and reimbursement in full to the City from the escrow account in the amount of $162,123.38 would be appropriate at this time. On ~ separate, issue, please note that the items of work reflected in"C:O. %1 and. the respective cost cannot be included in the total project cost used for figuring any future street assessments for this project. Please call if you have any questions. Sincerely, Kevin cc: Frank Trando Mark Connell H. Wayne Ginn Randy Fleming File 255 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900 FINAL COST ANALYSIS CHANGE ORDER NO. ONE (1) BELT LINE ROAD (J-2SS) ITEMS DELETED FROM CONTRACT ITEM 462.10 462.12 464.3 475.18 479.19 DESCRIPTION 8'X4' RCBC (CAST- IN-PLACE) 11'X4' RCBC (CAST- IN-PLACE 27" RCP, CLASS III HEADWALL, EAST SIDE, STA 39+00 HEADWALL/WING, WEST STA 39+00 APPROX. UNIT UNITS OUANTI~ PRICE LF 1206 126.88 LF 1380 192.40 LF 13 36.82 EA i 23,920.00 EA i 12,480.00 TOTAL ITEMS DELETED 153,017.28 265,512.00 478.66 23,920.00 12,480.00 455,407.94 462.11 462.18 462.19 464.1 464.6 475.24 475.25 475.26 582.2 582.3 582.10 582.12 582.13 582.14 582.15 582.16 EXTRA ITEMS ADDED TO CONTRACT DESCRIPTION 8'X4' RCBC (CAST- IN-PLACE) LF 9'X5' RCBC (CAST- IN-PLACE) LF 6'X3' RCBC LF 21" RCP, CLASS III LF 36" RCP, CLASS III LF HEADWALL, EAST SIDE STA 39+00 EA 36" THD CH-11 TYPE HEADWALL EA HEADWALL/WINGS, WEST SIDE (STA 31+10.80) EA RELOCATION WATER VALVE (33+65) EA RELOCATE FIRE HYDRANT EA CONC. ENCASE. CLASS B LF 12" PVC WATER LINE CLASS 200 LF 12" WATER VALVE EA 12" WATER PLUG EA 12" PVC SAN. SEWER SDR-35 LF 6" PVC WATER LINE CLASS 200 LF CUT-IN TEE AT STA 36+65 LS 280 126.88 3172 167.00 100 105.25 76 30.16 13 62.61 i 20000.00 I 900.00 I 3850.00 I 104.00 i 676.00 112 15.60 50 59.50 I 950.00 i 105.00 65 65.00 35 40.00 I 1717.63 TOTAL ITEMS ADDED NET CHANGE ORDER AMOUNT 35,526.40 529,724.00 10,525.00 2,292.16 813.93 20,000.00 900.00 3,850.00 104.00 676.00 1,747.20 2,975.00 950.00 105.00 4,225.00 1,400.00 1,717.63 $617,531.32 $162,123.38 (Instruclions on reverse side) CHANGE ORDER DATE OF ISSUANCE: OWNER's Project No, No, ENGINEER: PROJECT: Belt Line Road Improvements 'City of Coppell, Dallas County, TX 'OWNER: City of Coppell (Nam~i 255 Parkway Blvd. Address} Coppell, TX CONTRACTOR: Ed Bell Construction 10215 Gardner Road Dallas, TX 75220-0777 Suite 100 CONTRACT FOR: Paving and Drainage Improvements Hatch. 24~ 1987 . . Ginn, Inc. 17103 Preston RoRd* Dallas, TX 75248 ENGINEER's Project No. 255 You are directed to make the following changes in the Contract Documents. Descd~ion:Revisions to Sheets 52, 53, and 68/107 to modify the size and location of 2-E'x6' and 2-11'x6' reinforced box culvert Line "A" and the deletion of the 9-8'x4~ reinforced box culvert at Sta 39+53. PurposeofChange O~er: Addition and.deletion of drainage improvements and addition of utility improvements. Attachments:(LiM documentssupponingchange) Attachment "A" (Item Breakdown) CHANGE IN CONTRACT PRICE: O inalCon, c, prc, · S 5,540.~ .41 Previous Change Orders No. .... to No. $ Contract Price prior to this Change Order s 1 Net Increase {4s~sss~ of this Change Order $ $16Q.189.~5 Contract Price with all approved Change Orders $ 5,700,~51.76 CHANGE IN CONTRACT TIME: Original Contract Time 540 calendar days Net change from pFCvious Chan~e OrdeFs Contract Time Prior to this Chan~e Order ~40 calendar days Net Increase (decrease) of this change Order Contract Time with all approved Chan~e Orders 540 cale~d~ flays RECOMMENDED: by..-. / ,,.,.~, Quantity Take-Off change Order M'erch' 19, 1987 ITEMS TO BE DELKTf~D FROM CONTRACT ITEM 462.10 462.12 464.3 475.18 479.19 618.3 DESCRIPTION UNIT~.. (~UA NTITYP RI. CE 8'X4' RCBC (CAST IN PLACE) LF 1206 1 l'X4' RCBC (CAST IN PLACE) LF 1380 2?" RCP, CLASS ~I LF 13 HEADWALL, EAST SIDE, STA 39+00 EA 1 HEADWALL/WlNG, WEST STA 39+00 EA l 4" PVC, SCH. 40 LF 40 TO'rAL ITEMS DELETED 126.88 192.40 36.82 23,920.00 12,4~0.00 5.41 AMOUNT 153,017.28 265,512.00 478.66 23,920.00 12,480.00 218.40 $455,624.34 ITEM 462.11 462.18 462.19 464.1 464*6 4"/5.24 4?5.25 4?5.26 582.2 582.3 582.10 582.12 582.13 582.14 582.15 582.16 ITEMS TO BE ADDED TO CONTRACT DESCRIPTION UNIT UNI'rs ~UANTITY PRICE 8'X4' RCBC (CAST IN PLACE) LF 9'X5' RCBC (CAST IN PLACE) LF 6'X3' RCBC LF 21" RCP, CLASS IH LP 36" RCP, CLASS 1II LF HEADWALL, EAST SIDE, STA 39+00 EA 36" THD CH-Il TYPE "B" HEADWALL EA HEADWALL/WINGS, WEST SIDE (STA 31+10.80) EA RELOCATION WATER VALVE (33+65) EA RELOCATE FIRE HYDRANT EA CONC. ]iNCASEMENT CLASS~ LF 12" PVC WATER LINE CLASS..L~Y'2'~ LF 12" WATER VALVE EA 12" WATER PLUG EA 12" PVC SAN. SEWER SDR-35 LF 6" PVC WATER LINE CLASS 200 LF AMOUNT 280 126.88 35'526.40 3,1';2 167.00 520,?24.00 100 105.25 10,525.00 "/6 30.16 2,292.16 13 62.61 813.93 1 20,000.00 20,000.00 I 900.00 900.00 I 3,850.00 3,850.00 I 104.00 104.00 I 676.00 676.00 112 15.60 1,747.20 50 50.50 2,9?5.00 I 950.00 950.00 I 105.00 105.00. 65 65.00 4,225.00 35 40.00 1,400.00 TOTAL ITEMS ADDED TO CHANGE ORDER NET CHANGE ORDER $615,813.69 $160~189.35 3072a/0320 Mr. Tom Bethune, Jr. Ed Bell Construction Co. 10215 Gardner Road P.O. Box 20777 Dallas, TX 75220-0777 CONSULTING ENG!INEERS,I Re: Belt Line Road - Coppe11, TX Dear Mr. Bethune, We have completed our review of the breakdown of costs you submitted on the' 12" waterline extension at Station 36 + 65 installed as part of Change Order No. One (1). We shall agree to $1717.63 for this work. is attached for your records. A breakdown of costs Please indicate this as a lump sum figure under "Extras" on your next application for payment under C.C. #1 and we shall recommend payment to the City of Coppell. Sincerely, j~evi~'~Pei f fer KP/dsp cc: Jim Koch, Powell & Powe11 Engineers H. Wayne Ginn Randy Fleming J255 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900 Cost'BreakdOvn for e a.vork on Belt Line Road, Copp(~ · :Cu't in 12 X 12 Tee at :St'ation. 36+65 Material: 12 X 12 Tee 1 ea 12 X' 6 Tee 1 ea 12 X 12 Sleeve 1 ea 12" PVC 3 li 326.71 236.32 115.45 7.80 Labor: 5-5-87 7 hrs.. 5-6-87 3 hrs. Insurance and Taxes: (30~) Overhead and Profit: (15~) Equtpaent Rent: $D310 loader day 326;71 · 236.32 115.45 ~ #0 23.~0 617.76 185.33 92.66 120.00 STIMSoN'CONTRACTING COMPAI~ P. O. Box 18027 Dallas, TX 75218 214 278-3525