Loading...
NL Cypress-CS110916 T H E •C 1 T Y •O F COPPELL A 5 1 s September 16, 2011 Brad Moss Kimley -Horn and Associates, Inc 12700 Park Central Drive Suite 1800 Dallas, TX 75251 RE: Saintsbury Traffic Signal & Right Turn Lane Construction Plan Review Comments — 1 Submittal The City of Coppell has reviewed the referenced plans and has the following comments to offer: General - 1. Location of Road does not conform to City of Coppell Thoroughfare Plan. 2. Add a space in Belt Line Road, not Beltline. 3. Verify correct street names throughout set of plans. Cover - 4. Revise vicinity map to show accurate location of existing and proposed streets. Traffic Control - 5. Belt Line Road must be open to 3 lanes of northbound traffic no later than 3:30 pm each day. 6. On a 45 mph street the City of Coppell requires the use of a flashing arrow board for each lane reduction. 7. Longitudinal buffer space on 45 mph road is 195'. 8. Show Dividend Drive on plan & revise TTC if necessary. Removal Plan - 9. Remove existing inlet. 10. Label proposed & existing utilities on plan. Intersection Improvement Plan - 11. Field connect to existing storm sewer pipe. 12. Show existing franchise utilities in area. Possible conflict with new inlet location. 13. Need one crosswalk across Belt Line Road. Provide ramps on both ends with landing. May need to modify median nose to fit. 14. Revise "puppy tracks" to tie to first left lane and not outside lane. 15. Add stop bar for southbound Belt Line Road. A FAMILY COMMUNITY FOR A LIFETIME 255 PARKWAY * P.O. BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * WWW.COPPELLTX.GOV 2 16. Provide 5' Sidewalk from intersection to south property line (will tie to new gas station on corner of Dividend Drive). 17. Dowel into existing lane. Traffic Signal General Notes - 18. Contractor will need to provide signal poles (round with transformer base). 19. Traffic signs shall be 3M DG3 reflective sheeting or equal. 20. Provide Opticom multimode with GPS & IR. Traffic Signal Layout - 21. Show existing fiber optic from pull boxes in median & tie to cabinet (splice). 22. Show confirmation light w /extension, Transformer base and ILSN. 23. Revise ILSN sign lettering. Please make the necessary changes and submit these marked -up plans and two sets of revised plans to the City for review. There may be additional comments marked throughout the plans and specifications that may need to be addressed as well. If you have any question please contact this office at your convenience. Sincerely, George Marshall, P.E., C.'. . Kenneth M. Griffin, P.E., C.F.M Civil Engineer Director of Eng /Public Works Office Phone: (972) 304 -3562 Office: 972 - 304 -3686 Fax: (972) 304 -3570 Fax: 972 - 304 -7041 Mrarshall@coppelltx.gov kgriffin(ccoppelltx.gov