Loading...
ST0702-CS090913 Page 1 of 4 Keith Marvin - Re: Coppell Road From:   <eburns8318@aol.com> To:   <kmarvin@ci.coppell.tx.us>, <rhp@fwwr.net>, <jstevens@railroadsignalinc.com> Date:   9/13/2009 9:09 AM Subject:   Re: Coppell Road   Keith, I have in fact went to the job site along with the FRA signal inspector and reviewed what is needed. I  sent the revised quote to you and the FWWR. Please approve the quote ASAP so we can get our construction crew scheduled to do the work.  Eddie Burns RSI -----Original Message----- From: Keith Marvin <kmarvin@ci.coppell.tx.us> To: D. Guido <djg@fwwr.net> Cc: 'Frances Wilson' <FWILSON@dart.org>; 'Patsy Hayes' <pah@fwwr.net>; 'Ronald Preuss' <rhp@fwwr.net>; 'Eddie Burns' <eburns@railroadsignalinc.com>; 'Jim Stevens' <jstevens@railroadsignalinc.com> Sent: Wed, Sep 9, 2009 12:07 pm Subject: RE: Coppell Road Guido, Have you folks had a chance to schedule a visit to Coppell Road yet? As I have said before, we are happy to meet with you out there. Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "D. Guido" <djg@fwwr.net> 9/2/2009 7:09 AM >>> Keith, As we discussed 8/20 Eddie Burns of RSI will be here in Fort Worth next week for most of the week. Please give me a call Monday mid-morning so we can schedule a meet. As a reminder, we had some action items from our 8/20 meeting. 1. Eddie asked for plans from the20existing bungalow. I provided those 8/24 by email. Additionally I provided a detailed inventory of the crossing equipment also by email. 2. Regarding agreements I provided DART/City contact info by email on 8/20 for our VP Administration Patsy Hayes. You and Patsy exchanged emails 8/24 - she wrote, "I need a copy of the agreement between the City and Dart. I also need a copy of the bids that were submitted." Please send the bids when you send her the draft agreement if you don't mind. Thanks Keith, ~ guido -----Original Message----- From: Keith Marvin [mailto:kmarvin@ci.coppell.tx.us] Sent: Tuesday, September 01, 2009 4:47 PM file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4AACB6CECity...9/19/2011 Page 2 of 4 To: 'Frances Wilson'; D. Guido Cc: 'Ronald Preuss'; 'Eddie Burns'; 'Jim Stevens' Subject: RE: Coppell Road Has RSI had a chance to visit the project site yet? Do we anticipate a new estimate soon? We stand ready to meet out there if it will help. Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "D. Guido" <djg@fwwr.net> 8/19/2009 3:42 PM >>> I've confirmed that RSI will be available by phone and Frances Wilson of DART will be here. Our address is 2495 E. Long Avenue, Fort Worth, TX 76106. When you get here you'll see a big FWWR sign curbside - come on back over one RR crossing (look both ways) then park at visitor parking on your right - go inside job trailer using door to your left and make yourselves comfortable if I'm not there ahead of you. See you tomorrow. ~ guido -----Original Message----- From: Keith Marvin [mailto:kmarvin@ci.coppell.tx.us] Sent: Tuesday, August 18, 2009 4:14 PM To: 'Frances Wilson'; D. Guido Cc: 'Ronald Preuss'; 'Eddie Burns'; 'Jim Stevens' Subject: RE: Coppell Road Ken Griffin and I are available to meet at your location. Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "D. Guido" <djg@fwwr.net> 8/18/2009 3:56 PM >>> FWWR can't make it over there due to other obligations - if DART and the City can come to Hodge Yard at 2495 E. Long Avenue, Fort Worth, we can call RSI from our conference room. Just let me know so I can reserve the room. ~ guido, FWWR -----Original Message----- From: Keith Marvin [mailto:kmarvin@ci.coppell.tx.us] Sent: Tuesday, August 18, 2009 3:37 PM To: 'Frances Wilson'; D. Guido Cc: 'Ronald Preuss'; 'Eddie Burns'; 'Jim Stevens' Subject: RE: Coppell Road I'm not sure what you mean by a conference call bridge. My understanding was that Dart and FWWR would meet here at Coppell Town Center, and that we would call into RSI. Is that the plan? Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "D. Guido" <djg@fwwr.net> 8/18/2009 3:30 PM >>> file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4AACB6CECity...9/19/2011 Page 3 of 4 Jim Stevens of RSI is going to try and get his designer, Eddie Burns, confirmed, but let’s tentatively plan on a conference call at 10:00 am Central on Thursday, August 20th. City of Coppell – please set up a conference call bridge. We’ll have about an hour. Let us know please Jim. Thanks, ~ guido, FWWR From: Frances Wilson [mailto:FWILSON@dart.org] Sent: Tuesday, August 18, 2009 9:58 AM To: Keith Marvin; D. Guido Cc: 'Ronald Preuss' Subject: RE: Coppell Road Works for me. How about you, Ron & Guido? I know you'll have to coordinate with your signal contractor before we can schedule a time. Let us know when you can. Thanks! >>> "Keith Marvin" <kmarvin@ci.coppell.tx.us> 8/18/2009 8:35 AM >>> We can meet here in Coppell if you like. That should be half way fr each of you. We can then call the RSI folks on the speaker phone. The City of Coppell would like to resolve this as quickly as possible, as we are proceeding with the rest of the construction at this time. Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "Frances Wilson" <FWILSON@dart.org> 8/17/2009 1:24 PM >>> Possibly a teleconference would work. =0 A >>> "D. Guido" <djg@fwwr.net> 8/17/2009 12:39 PM >>> Hello Frances, I have not had an opportunity to discuss it with RSI leadership yet; should be able to discuss it this week as I’m scheduling a regular call. They’re based in Tulsa; I do not know if they will be able to meet on site. ~ guido From:Frances Wilson [mailto:FWILSON@dart.org] Sent: Monday, August 17, 2009 8:45 AM To: Daniel Guido; Ronald Preuss Cc: kmarvin@ci.coppell.tx.us Subject: Re: Coppell Road Ron & Guido, Have you had a chance to contact your signal contractor regarding a meeting with the City of Coppell? As you can see below, Keith Marvin with the City is available Thursday and Friday of this week. I have no conflicts with those days either. Please let know what you find out. file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4AACB6CECity...9/19/2011 Page 4 of 4 Thanks! Frances >>> "Keith Marvin" <kmarvin@ci.coppell.tx.us> 8/17/2009 8:26 AM >>> Frances, Thanks for setting the stage for a meeting. Have you had any response on availability? I am available on Thursday or Friday this week. Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "Frances Wilson" <FWILSON@dart.org> 8/12/2009 11:34 AM >>> Ron & Guido, The City of Coppell has expressed some concern over the cost estimate of new signalization that will accompany the widening and reconstruction of Coppell Road. Could we all meet, including FWWR's signal contractor, to discuss any possibilities of lowering the costs to come closer to the City's budget? Thank you! Frances Frances Wilson, SR/WA, R/W-NAC Sr. Right of Way Representative Commuter Rail & Railroad Management Dallas Area Rapid Transit P.O. Box 660163 1401 Pacific Avenue Dallas, Texas 75266-7210 Phone: (214) 749-3619 Fax: (214) 749-3609 fwilson@dart.org file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4AACB6CECity...9/19/2011 Railroad Signal International 15110 E. Pine St. Tulsa, Oklahoma 74116 Phone: (918) 234-1522 fax: (918) 234-1529 www.railroadsignalinc.com CUSTOMER: FT.WORTH AND WESTERN RAILROAD PROJECT: FURNISH AND INSTALL 2 EACH GATE SIGNALS WITH SIDEWALK GATES AND LED LIGHTHEADS NEW BATTERIES, NEW PRINTS, NEW UNDERGROUND CABLES LOCATION: COPPELL RD SOUTH COPPELL TX RRMP 28.30 CONTROL: HXP-1 $ 47,455.83 MATERIALS $ 84,916.16 FIELD CONSTRUCTION, ENGINEERING, 0.08#REF! EQUIPMENT, FIELD TESTING TOTAL COST OF PROJECT$ 132,371.99 PRICE DOES NOT INCLUDE ANY TRACKWORK EXCEPT BONDING RAIL PRICE FOB JOB SITE. ROAD BORING IS INCLUDED IN PRICE PRICE DOES NOT INCLUDE ANY TAX OF ANY KIND. INSULATED JOINT AND SW RODS (IF REQUIRED) BY RAILROAD THIS QUOTATION IS VALID FOR A PERIOD OF 30 DAYS FROM BID DATE RAILROAD SIGNAL INTL. SEPT 8 2009 EDDIE D. BURNSDATE PRESIDENT APPROVED BY:PO# APPROVED DATE: RAILROAD SIGNAL INTERNATIONAL, LLCPROJECT CUSTOMER: FT.WORTH AND WESTERN RAILROAD 15110 E. PINE STREETCSJ # PROJECT: FURNISH AND INSTALL TULSA, OK. 74116PAYMENT CONTROL 2 EACH GATE SIGNALS WITH SIDEWALK GATES AND LED LIGHTHEA 918-234-1522 LOCATION: COPPELL RD SOUTH COPPELL TX RRMP 28.30 918-234-1529 FAX CONTROL: HXP-1 COST BRECKDOWN 1 2LABOR HRS.PAY RATETOTAL 3ENGINEERING:Reg. HoursPer HourDUE 4SIGNAL DESIGN ENGINEER8$ 56.00$ 448.00 5SIGNAL CONSULTING0$ 65.00$ - 6DRAFTING AUTOCAD36$ 18.00$ 648.00 7ENGINEERING ASST. ADMIN8$ 14.00$ 112.00 8REPRODUCTION COSTS1$ 150.00$ 150.00 9ENGINEERING SUB-TOTAL$ 1,358.00 ADMINISTRATIVE PURCHASING MATERIAL MGT.817.07$ 136.56 ADMINISTRATIVE2414.65$ 351.60 PROJECT SCHEDULING2424.07$ 577.68 PROJECT AUDIT (TULSA)60$ - FIELD AUDIT65$ - ADMINISTRATIVE SUB-TOTAL$ 1,065.84 10 11CONSTRUCTION: 12 13LAYOUT SUPV$ 65.00$ - 14BORING CREW FOREMAN$ 18.00$ - 15BORING LABOR $ 14.00$ - SIGNAL SUPV16$ 65.00$ 1,040.00 16SIGNAL CONSTRUCTION FOREMAN60$ 40.00$ 2,400.00 ASST LABOR CONSTRUCTION120$ 20.00$ 2,400.00 SIGNAL CUTOVER CREW FOREMAN$ 65.00$ - SIGNAL CUTOVER TRAINEE$ 18.00$ - 18FIELD CONSTRUCTION SUB-TOTAL$ 5,840.00 40 41SHOP LABOR SIGNAL ASSLY AND TESTING 42WIRING TESTS # 1415$ 60.00 43LABOR # 2813$ 104.00 44LABOR # 3812$ 96.00 45LABOR # 4811$ 88.00 46 47CONTROL CASE WIRING: 48SHOP FOREMAN16$ 15.45$ 247.20 49WIREMAN # 18$ 14.00$ 112.00 50WIREMAN # 2 51WIRING SHOP SUB-TOTAL$ 707.20 52 53Sub-Total$ 8,971.04 54 55LABOR SURCHARGE FOR COMPANY PAID BENEFITS:24.00%$ 2,153.05 56WORKMENS COMPENSATION INSURANCE6.00%$ 667.45 57TEMPORARY CONTRACT LABOR$ - 58 59TOTAL LABOR$ 11,791.53 60 61 62EQUIPMENT COSTS:# OF DAYS$ PER DAY 63 642006 INTERNATIONAL BOOM TRUCK6$407$ 2,442.00 65303 CAT MINI EXCAVATOR6$235$ 1,410.00 66EQUIPMENT RENTAL EXPENSES1$800$ 800.00 67CUTOVER CREW PICKUP6$85$ 510.00 69BORING TRUCK4$285$ 1,140.00 70BORING UNIT AND TRAILER4$875$ 3,500.00 71EXCAVATOR TRAILER6$45$ 270.00 72GOOSENECK TRAILER$55$ - 73JACK HAMMER ATTACHMENT$35$ - 74TOTAL EQUIPMENT AND MOBILIZATION COSTS$ 10,072.00 75 76 77SUB CONTRACTORS: 78 79POWER TAP 80ROAD BORING MATERIALS$ 1,400.00 81GRAVEL AND DIRT$ 3,500.00 CONCRETE 82TRAFFIC CONTROL$ 650.00 83ONSITE MATERIALS STORGE$ 150.00 84TRACK WORK 85 86 87TOTAL SUB CONTRACTORS:$ 5,700.00 88 89 90PARTS AND MATERIALS 92SEE ATTACHED PARTS LIST W/COST$ 46,525.32 95CRATING & HANDLING2.00%$ 930.51 96 97 98TOTAL PARTS AND MATERIALS$ 47,455.83 99 100 101OTHER COSTS: 102FREIGHT IN$ 1,200.00 103MOBILIZATION EXPENSE TRUCKS$ 900.00 104SUBSISTENCE ALLOWANCES BORING CREW SUBSISTENCE ALLOWANCES SIGNAL CREW$ 1,800.00 106SUBSISTENCE ALLOWANCES LAY OUT AIRFARES$ 1,400.00 RENTAL CARS $ 300.00 107MGMT TRAVEL EXPENSE$ 900.00 108ON SITE MEETING EXPENSE$ 400.00 109BID OR EST. EXPENSE$ 300.00 110SHIPPING COMMON CARRIER$ 1,900.00 111SHIPPING OUR TRUCK 112 113TOTAL OTHER COSTS$ 9,100.00 114 115 116G AND A ALLOCATION ON LABOR AND MAT.38.00%$ 22,514.00 117CONTINGENCY3.00%$ 1,777.42 118GENERAL LIABILITY INSURANCE7.50%$ 4,438.31 119SUB TOTAL COST$ 112,849.09 121BONDING EXPENSE FEE0.00%$ - 122SALES COMMISSION0.00%$ - 123FIXED FEE (PROFIT)15.00%$ 16,927.36 124BANK INTEREST EXPENSE2.00%$ 2,595.53 125TOTAL COST$ 132,371.99 126 RAILROAD SIGNAL INTERNATIONAL MATERIAL LIST Costumer: FT.WORTH AND WESTERN RAILROAD Project: FURNISH AND INSTALL 2 EACH GATE SIGNALS WITH SIDEWALK GATES AND LED LIGHTHEADS COPPELL RD SOUTH COPPELL TX RRMP 28.30 HXP-1 QTYUNITVENDORPART NUMBERDESCRIPTION UNIT. COST. EXT. COST. HOUSE $ - 0EARSI6' X 6' ALUM CONTROL HOUSE W/INTERNAL FOUNDATIONS$ 8,890.00 EAGRAYBARLOAD CENTER 100 AMP $ 240.00 $ - 0 EARSITRAFFIC PRE-AMP BOX (ON OUTSIDE OF CASE) $ 320.00 $ - 0 EAGEMSPOWER OFF LIGHTS $ 32.00 $ - 0 EAFAST SIGNSDOT DOT SIGN AND DECALS $ 133.20 $ - 0 EARSICABLE RISORS PVC 4" $ 23.00 $ - 0 FTGETSTOWER & CASE WIRE #10 $ 0.42 $ - 0 EAGRAINGERDAYTON ATTIC FAN THERMOSTAT 80-140 DEGREES $ 21.39 $ - 0 EAGRAINGERATTIC FAN EXHAUST CENTRIFUGAL VENT FAN $ 114.15 $ - 0 EAB. A. ElectricGFI WALL RECEPTACLES $ 16.00 $ - 0 EARSI5LV7019" EQUIPMENT RACK $ 178.00 $ - 0 EANORBERGPLANDUIT 2-1/4"x2-1/4"x6' 6" $ 22.80 $ - 0 EANORBERGPANDUIT 4"x3"x6' 6" $ 31.50 $ - 0 EANORBERGPANDUIT 1-1/2"x1-1/2"x6' 6" $ 20.40 $ - 0 EAMTM12MDFPLYWOOD MED 49"x3/4"x97" $ 16.99 $ - 0 EAHOME DEPOT4ft FLUORESCENT LIGHTS $ 27.00 $ - 0 SIGNALS-GATES EARSI$ 900.00 2TWOWAY LIGHTARM JCT BOX$ 450.00 EASAFETRAN$ 13,960.00 2MODEL 60 GATE MECHANISM$ 6,980.00 EAUSS$ 310.00 1TORQUE WRENCH GATE$ 310.00 EARSI$ 484.00 215-6X5 SIGNAL MAST$ 242.00 EARSI$ 864.00 25 INCH SPLIT BASE JCT BOX$ 432.00 EARSI$ 228.00 2HIGHWIND BRACKET$ 114.00 EAUSS$ 248.52 4GATE HUBS$ 62.13 EARSI$ 1,272.00 4COUNTERWIEGHT ARMS$ 318.00 EARSI$ 144.00 2GATE WIEGHT STUD PLATE W/RACHET WASHERS$ 72.00 EARSI$ 920.00 10GATE WIEGHTS$ 92.00 EAGSI$ 2,200.00 2GATE KEEPERS$ 1,100.00 EARSI$ 36.00 2GATE WIRE AND MOUNTING HARDWARE$ 18.00 EARSI$ 2,496.00 812" LED LIGHTHEADS W/BACKGROUND AND HOOD$ 312.00 EARSI$ 376.00 8LED GATE LIGHTS$ 47.00 EARSI$ 126.00 2GATE TIP DIODE$ 63.00 EARSI$ 246.00 2RR CROSSING SIGNS HI INT WITH MOUNTING HWG$ 123.00 EARSI$ 66.00 2RODENT PLATE$ 33.00 EARSI$ 370.00 210 FT SIDEWALK GATE HI INT$ 185.00 EARSI$ 1,280.00 220 FT GATE ARM HI INT$ 640.00 EARSI$ 390.00 2ELECTRONIC BELL$ 195.00 FOUNDATIONS 2EARSI GATE FOUNDATIONS$ 610.00$ 1,220.00 MAJOR ELECTRONICS 0EAGETS$ - ELECTROLOGIXS XP4 CROSSING PREDICTION INCLUDING: 0EA227481-000$ 477.00$ - ASSY IWP XTI-1S PERSONALITY 0EA227538-000$ 487.00$ - ASSY VIO-44R PERSONALITY MOD. 0EA251124-000$ 416.00$ - ASSY MODULE CDU-1 0EA251327-000$ 600.00$ - ASSY MODULE IWP CPS-2 0EA251328-000$ 436.00$ - ASSY MODULE IWP XCI-1 0EA251336-000$ 3,816.00$ - ASSY MODULE IWP XTI-1S 0EA251346-000$ 1,007.00$ - ASSY MODULE TC21 IWP NSM-1 0EA251379-000$ 2,054.00$ - ASSY VIO-44R 0EA251395-000$ 1,406.00$ - ASSY MODULE VPM2+ 0EA300752-000$ 3,244.00$ - SYS IWP ASSY CHASSIS W/BP 0EAGETS$ - XING CONTROLLER KIT INCLUDING: 0EA075046-000$ 150.00$ - ASSY XIP-20 CABLE #1 0EA075047-000$ 150.00$ - ASSY XIP-20 CABLE #2 0EA227546-000$ 487.00$ - ASSY IXC PERSONALITY MODULE 0EA227561-000$ 530.00$ - ASSY IXS XIP-20 CROSSING INTER 0EA251384-000$ 2,650.00$ - ASSY MOD IXS IXC-20S 0EAGETS250224-001C$ 296.00$ - MDSA-1 0EARSI-$ 379.00$ - ENERGY BUS PANEL 0EARSI$ 327.00$ - SIGNAL CUT OUT PANEL 0EAGETS$ 490.00$ - 2TC AND BASE 0EARSI$ 734.00$ - LAMP ARRESTER PANEL 0EARSIACSP-20-1ACSP SURGE PROTECTOR$ 120.00$ - 0EATYCO$ 35.00$ - AC POR RELAY POTTER & BRUMFIELD & BASE 0EATYCO$ 35.00$ - DC POR RELAY POTTER & BRUMFIELD & BASE 0EA250141-001 $ 170.00 $ - 5025A TRACK BATTERY REACTOR 1EACRAGG $ 598.00 $ 598.00 BATTERY CHARGER ELEC 40AMP 1EACRAGG $ 468.00 $ 468.00 BATTERY CHARGER ELEC 20AMP 6EAGNB50G19GNB 472 $ 498.00 $ 2,988.00 7EAGNB50G27GNB 680 $ 667.00 $ 4,669.00 1LOTRSITERMINALS MISC.WIRING MATERIALS$ 750.00$ 750.00 4EAHOME DEPOTBLACK ELECTRICAL TAPE$ 2.45$ 9.80 0EAJOSLYNSECONDARY SURGE PROTECTOR$ 31.00$ - 1LTRSIFIELD CABLE WIRE TAGS COMPUTER GEN$ 38.45$ 38.45 1BOXBRADYWNS-211-319$ 121.70$ 121.70 WIRE MARKING SLEEVES 1BOXBRADYCL-317-619-BK$ 46.52$ 46.52 LABELS 0EAWCH$ 18.00$ - TEST SWITCH 0EASAFETRAN$ 6.50$ - BAKELITE BASE POLE LIGHT 6EAGETS$ 13.50$ 81.00 DOUBLE ROW TERMINAL BLOCK W/HARDWARE 6EAGETS$ 12.75$ 76.50 SINGLE ROW TERMINAL BLOCK W/HARDWARE CABLE 75FTGETS1078-05$ 2.08$ 156.00 3C#9 450FtBUSH$ 5.56$ 2,502.00 5 COND 6 CABLE 450FTGETS$ 3.67$ 1,651.50 7 COND 14 CABLE 500FTGETS$ 1.79$ 895.00 2C#6 TW TRACK WIRE 40FTGRAYBAR$ 0.46$ 18.40 Bare #6 COPPER WIRE SOLID GROUND FIELD A389$ 93.75 5EARSIPADLOCKS ( RR)$ 18.75 $ 15.04 8EAERICORAIL CLIPS TRACK WIRE$ 1.88 $ 110.00 2EARSIBOLARDS (YELLOW)$ 55.00 $ 78.00 20FTBUSH2 INCH PVC SCH 80$ 3.90 $ 9.12 6EABUSH2INCH 90 DEGREE SWEEPS$ 1.52 $ 20.64 24FTCHEROKEE3/4 HP AIR HOSE$ 0.86 $ - EAGETSNBS$ 479.00 $ - EARSI25 FT WOODEN POWER POLE$ 255.00 $ - EARSINBS SHUNT TUBES$ 155.00 $ 336.00 2EARSITRACK WIRE JCT BOX$ 168.00 $ - EABUSH4 INCH 90 DEGREE SWEEPS$ 89.00 $ - EABUSH4 INCH 45 DEGREE SWEEPS$ 78.00 $ 41.86 7EAERICOCADWELD ONE SHOT $ 5.98 $ 234.00 1SETERICOBONDWIRE MOLDS (XS STYLE) WITH FRAMES$ 234.00 $ - EAPULL BOXES SMALL$ 245.00 $ - EAPULL BOXES LARGE$ 555.00 $ 457.50 150EAERICOBOND WIRES XS STYLE 6 1/2"$ 3.05 $ 883.50 150EAERICOBONDWIRES XS STYLE LONG WEB$ 5.89 $ 506.00 200FTBUSHSCH 80 PVC$ 2.53 $ 8.45 1CANHOME DEPOTYELLOW PAINT$ 8.45 $ 6.98 1CANHOME DEPOT3 INCH PAINT BRUSH$ 6.98 $ 15.60 8EAERICOWELD ON TRACK CONNECTIONS$ 1.95 $ - EAHOME DEPOTDUCT SEAL FOAM$ 2.25 $ 40.74 6EAHOME DEPOTPLASTER OF PARIS$ 6.79 $ 89.00 100FTERICO3/16 BONDSTRAND INSULATED$ 0.89 $ 11.02 2CANHOME DEPOTPVC GLUE$ 5.51 $ 13.56 2CANHOME DEPOTPVC PIPE CLEANER$ 6.78 $ 3.88 4CANSWALMARTALUMINUM SPRAY PAINT$ 0.97 $ 23.97 3ROLLHOME DEPOTCAUTION TAPE$ 7.99 $ 16.25 1CANHOME DEPOTSCOTCHKOTE ELECTRICAL COATING 15 oz$ 16.25 $ 2.97 1EAHOME DEPOT3M SCOTCH 130c LINERLESS RUBBER SPLICING TAPE$ 2.97 $ 33.10 2EAGRAYBARGROUND RODS$ 16.55 $ 268.00 4EARSITRACK CONNECTION KIT$ 67.00 TOTAL $ 46,525.32