ST0702-CS090913
Page 1 of 4
Keith Marvin - Re: Coppell Road
From: <eburns8318@aol.com>
To: <kmarvin@ci.coppell.tx.us>, <rhp@fwwr.net>, <jstevens@railroadsignalinc.com>
Date: 9/13/2009 9:09 AM
Subject: Re: Coppell Road
Keith, I have in fact went to the job site along with the FRA signal inspector and reviewed what is
needed. I sent the revised quote to you and the FWWR. Please approve the quote ASAP so we can get
our construction crew scheduled to do the work. Eddie Burns RSI
-----Original Message-----
From: Keith Marvin <kmarvin@ci.coppell.tx.us>
To: D. Guido <djg@fwwr.net>
Cc: 'Frances Wilson' <FWILSON@dart.org>; 'Patsy Hayes' <pah@fwwr.net>; 'Ronald Preuss'
<rhp@fwwr.net>; 'Eddie Burns' <eburns@railroadsignalinc.com>; 'Jim Stevens'
<jstevens@railroadsignalinc.com>
Sent: Wed, Sep 9, 2009 12:07 pm
Subject: RE: Coppell Road
Guido,
Have you folks had a chance to schedule a visit to Coppell Road yet?
As I have said before, we are happy to meet with you out there.
Keith
Keith Marvin, P.E.
Project Engineer
(972) 304-3681
>>> "D. Guido" <djg@fwwr.net> 9/2/2009 7:09 AM >>>
Keith,
As we discussed 8/20 Eddie Burns of RSI will be here in Fort Worth next
week for most of the week. Please give me a call Monday mid-morning so
we can schedule a meet.
As a reminder, we had some action items from our 8/20 meeting.
1. Eddie asked for plans from the20existing bungalow. I provided those
8/24 by email. Additionally I provided a detailed inventory of the
crossing equipment also by email.
2. Regarding agreements I provided DART/City contact info by email on
8/20 for our VP Administration Patsy Hayes. You and Patsy exchanged
emails 8/24 - she wrote, "I need a copy of the agreement between the
City and Dart. I also need a copy of the bids that were submitted."
Please send the bids when you send her the draft agreement if you don't
mind.
Thanks Keith,
~ guido
-----Original Message-----
From: Keith Marvin [mailto:kmarvin@ci.coppell.tx.us]
Sent: Tuesday, September 01, 2009 4:47 PM
file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4AACB6CECity...9/19/2011
Page 2 of 4
To: 'Frances Wilson'; D. Guido
Cc: 'Ronald Preuss'; 'Eddie Burns'; 'Jim Stevens'
Subject: RE: Coppell Road
Has RSI had a chance to visit the project site yet? Do we anticipate a
new estimate soon?
We stand ready to meet out there if it will help.
Keith
Keith Marvin, P.E.
Project Engineer
(972) 304-3681
>>> "D. Guido" <djg@fwwr.net> 8/19/2009 3:42 PM >>>
I've confirmed that RSI will be available by phone and Frances Wilson
of DART will be here. Our address is 2495 E. Long Avenue, Fort Worth,
TX 76106. When you get here you'll see a big FWWR sign curbside - come
on back over one RR crossing (look both ways) then park at visitor
parking on your right - go inside job
trailer using door to your left
and make yourselves comfortable if I'm not there ahead of you.
See you tomorrow.
~ guido
-----Original Message-----
From: Keith Marvin [mailto:kmarvin@ci.coppell.tx.us]
Sent: Tuesday, August 18, 2009 4:14 PM
To: 'Frances Wilson'; D. Guido
Cc: 'Ronald Preuss'; 'Eddie Burns'; 'Jim Stevens'
Subject: RE: Coppell Road
Ken Griffin and I are available to meet at your location.
Keith Marvin, P.E.
Project Engineer
(972) 304-3681
>>> "D. Guido" <djg@fwwr.net> 8/18/2009 3:56 PM >>>
FWWR can't make it over there due to other obligations - if DART and
the City can come to Hodge Yard at 2495 E. Long Avenue, Fort Worth, we
can call RSI from our conference room. Just let me know so I can
reserve the room.
~ guido, FWWR
-----Original Message-----
From: Keith Marvin [mailto:kmarvin@ci.coppell.tx.us]
Sent: Tuesday, August 18, 2009 3:37 PM
To: 'Frances Wilson'; D. Guido
Cc: 'Ronald Preuss'; 'Eddie Burns'; 'Jim Stevens'
Subject: RE: Coppell Road
I'm not sure what you mean by a conference call bridge. My
understanding was that Dart and FWWR would meet here at Coppell Town
Center, and that we would call into RSI. Is that the plan?
Keith
Keith Marvin, P.E.
Project Engineer
(972) 304-3681
>>> "D. Guido" <djg@fwwr.net> 8/18/2009 3:30 PM >>>
file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4AACB6CECity...9/19/2011
Page 3 of 4
Jim Stevens of RSI is going to try and get his designer, Eddie Burns,
confirmed, but let’s tentatively plan on a conference call at 10:00 am
Central on Thursday, August 20th. City of Coppell – please set up a
conference call bridge. We’ll have about an hour.
Let us know please Jim.
Thanks,
~ guido, FWWR
From: Frances Wilson [mailto:FWILSON@dart.org]
Sent: Tuesday, August 18, 2009 9:58 AM
To: Keith Marvin; D. Guido
Cc: 'Ronald Preuss'
Subject: RE: Coppell Road
Works for me. How about you, Ron & Guido? I know you'll have to
coordinate with your signal contractor before we can schedule a time.
Let us know when you can. Thanks!
>>> "Keith Marvin" <kmarvin@ci.coppell.tx.us> 8/18/2009 8:35 AM >>>
We can meet here in Coppell if you like. That should be half way fr
each of you. We can then call the RSI folks on the speaker phone.
The City of Coppell would like to resolve this as quickly as possible,
as we are proceeding with the rest of the construction at this time.
Keith
Keith Marvin, P.E.
Project Engineer
(972) 304-3681
>>> "Frances Wilson" <FWILSON@dart.org> 8/17/2009 1:24 PM >>>
Possibly a teleconference would work.
=0
A
>>> "D. Guido" <djg@fwwr.net> 8/17/2009 12:39 PM >>>
Hello Frances,
I have not had an opportunity to discuss it with RSI leadership yet;
should be able to discuss it this week as I’m scheduling a regular
call.
They’re based in Tulsa; I do not know if they will be able to meet on
site.
~ guido
From:Frances Wilson [mailto:FWILSON@dart.org]
Sent: Monday, August 17, 2009 8:45 AM
To: Daniel Guido; Ronald Preuss
Cc: kmarvin@ci.coppell.tx.us
Subject: Re: Coppell Road
Ron & Guido,
Have you had a chance to contact your signal contractor regarding a
meeting with the City of Coppell? As you can see below, Keith Marvin
with the City is available Thursday and Friday of this week. I have no
conflicts with those days either. Please let know what you find out.
file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4AACB6CECity...9/19/2011
Page 4 of 4
Thanks!
Frances
>>> "Keith Marvin" <kmarvin@ci.coppell.tx.us> 8/17/2009 8:26 AM >>>
Frances,
Thanks for setting the stage for a meeting. Have you had any response
on availability? I am available on Thursday or Friday this week.
Keith
Keith Marvin, P.E.
Project Engineer
(972) 304-3681
>>> "Frances Wilson" <FWILSON@dart.org> 8/12/2009 11:34 AM >>>
Ron
& Guido,
The City of Coppell has expressed some concern over the cost estimate
of new signalization that will accompany the widening and reconstruction
of Coppell Road. Could we all meet, including FWWR's signal contractor,
to discuss any possibilities of lowering the costs to come closer to the
City's budget?
Thank you!
Frances
Frances Wilson, SR/WA, R/W-NAC
Sr. Right of Way Representative
Commuter Rail & Railroad Management
Dallas Area Rapid Transit
P.O. Box 660163
1401 Pacific Avenue
Dallas, Texas 75266-7210
Phone: (214) 749-3619
Fax: (214) 749-3609
fwilson@dart.org
file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4AACB6CECity...9/19/2011
Railroad Signal International
15110 E. Pine St.
Tulsa, Oklahoma 74116
Phone: (918) 234-1522 fax: (918) 234-1529
www.railroadsignalinc.com
CUSTOMER:
FT.WORTH AND WESTERN RAILROAD
PROJECT:
FURNISH AND INSTALL
2 EACH GATE SIGNALS WITH SIDEWALK GATES AND LED LIGHTHEADS
NEW BATTERIES, NEW PRINTS, NEW UNDERGROUND CABLES
LOCATION:
COPPELL RD SOUTH COPPELL TX RRMP 28.30
CONTROL:
HXP-1
$ 47,455.83
MATERIALS
$ 84,916.16
FIELD CONSTRUCTION, ENGINEERING,
0.08#REF!
EQUIPMENT, FIELD TESTING
TOTAL COST OF PROJECT$ 132,371.99
PRICE DOES NOT INCLUDE ANY TRACKWORK EXCEPT BONDING RAIL
PRICE FOB JOB SITE.
ROAD BORING IS INCLUDED IN PRICE
PRICE DOES NOT INCLUDE ANY TAX OF ANY KIND.
INSULATED JOINT AND SW RODS (IF REQUIRED) BY RAILROAD
THIS QUOTATION IS VALID FOR A PERIOD OF 30 DAYS FROM BID DATE
RAILROAD SIGNAL INTL.
SEPT 8 2009
EDDIE D. BURNSDATE
PRESIDENT
APPROVED BY:PO#
APPROVED DATE:
RAILROAD SIGNAL INTERNATIONAL, LLCPROJECT
CUSTOMER:
FT.WORTH AND WESTERN RAILROAD
15110 E. PINE STREETCSJ #
PROJECT:
FURNISH AND INSTALL
TULSA, OK. 74116PAYMENT CONTROL
2 EACH GATE SIGNALS WITH SIDEWALK GATES AND LED LIGHTHEA
918-234-1522
LOCATION:
COPPELL RD SOUTH COPPELL TX RRMP 28.30
918-234-1529 FAX
CONTROL:
HXP-1
COST BRECKDOWN
1
2LABOR HRS.PAY RATETOTAL
3ENGINEERING:Reg. HoursPer HourDUE
4SIGNAL DESIGN ENGINEER8$ 56.00$ 448.00
5SIGNAL CONSULTING0$ 65.00$ -
6DRAFTING AUTOCAD36$ 18.00$ 648.00
7ENGINEERING ASST. ADMIN8$ 14.00$ 112.00
8REPRODUCTION COSTS1$ 150.00$ 150.00
9ENGINEERING SUB-TOTAL$ 1,358.00
ADMINISTRATIVE
PURCHASING MATERIAL MGT.817.07$ 136.56
ADMINISTRATIVE2414.65$ 351.60
PROJECT SCHEDULING2424.07$ 577.68
PROJECT AUDIT (TULSA)60$ -
FIELD AUDIT65$ -
ADMINISTRATIVE SUB-TOTAL$ 1,065.84
10
11CONSTRUCTION:
12
13LAYOUT SUPV$ 65.00$ -
14BORING CREW FOREMAN$ 18.00$ -
15BORING LABOR $ 14.00$ -
SIGNAL SUPV16$ 65.00$ 1,040.00
16SIGNAL CONSTRUCTION FOREMAN60$ 40.00$ 2,400.00
ASST LABOR CONSTRUCTION120$ 20.00$ 2,400.00
SIGNAL CUTOVER CREW FOREMAN$ 65.00$ -
SIGNAL CUTOVER TRAINEE$ 18.00$ -
18FIELD CONSTRUCTION SUB-TOTAL$ 5,840.00
40
41SHOP LABOR SIGNAL ASSLY AND TESTING
42WIRING TESTS # 1415$ 60.00
43LABOR # 2813$ 104.00
44LABOR # 3812$ 96.00
45LABOR # 4811$ 88.00
46
47CONTROL CASE WIRING:
48SHOP FOREMAN16$ 15.45$ 247.20
49WIREMAN # 18$ 14.00$ 112.00
50WIREMAN # 2
51WIRING SHOP SUB-TOTAL$ 707.20
52
53Sub-Total$ 8,971.04
54
55LABOR SURCHARGE FOR COMPANY PAID BENEFITS:24.00%$ 2,153.05
56WORKMENS COMPENSATION INSURANCE6.00%$ 667.45
57TEMPORARY CONTRACT LABOR$ -
58
59TOTAL LABOR$ 11,791.53
60
61
62EQUIPMENT COSTS:# OF DAYS$ PER DAY
63
642006 INTERNATIONAL BOOM TRUCK6$407$ 2,442.00
65303 CAT MINI EXCAVATOR6$235$ 1,410.00
66EQUIPMENT RENTAL EXPENSES1$800$ 800.00
67CUTOVER CREW PICKUP6$85$ 510.00
69BORING TRUCK4$285$ 1,140.00
70BORING UNIT AND TRAILER4$875$ 3,500.00
71EXCAVATOR TRAILER6$45$ 270.00
72GOOSENECK TRAILER$55$ -
73JACK HAMMER ATTACHMENT$35$ -
74TOTAL EQUIPMENT AND MOBILIZATION COSTS$ 10,072.00
75
76
77SUB CONTRACTORS:
78
79POWER TAP
80ROAD BORING MATERIALS$ 1,400.00
81GRAVEL AND DIRT$ 3,500.00
CONCRETE
82TRAFFIC CONTROL$ 650.00
83ONSITE MATERIALS STORGE$ 150.00
84TRACK WORK
85
86
87TOTAL SUB CONTRACTORS:$ 5,700.00
88
89
90PARTS AND MATERIALS
92SEE ATTACHED PARTS LIST W/COST$ 46,525.32
95CRATING & HANDLING2.00%$ 930.51
96
97
98TOTAL PARTS AND MATERIALS$ 47,455.83
99
100
101OTHER COSTS:
102FREIGHT IN$ 1,200.00
103MOBILIZATION EXPENSE TRUCKS$ 900.00
104SUBSISTENCE ALLOWANCES BORING CREW
SUBSISTENCE ALLOWANCES SIGNAL CREW$ 1,800.00
106SUBSISTENCE ALLOWANCES LAY OUT
AIRFARES$ 1,400.00
RENTAL CARS $ 300.00
107MGMT TRAVEL EXPENSE$ 900.00
108ON SITE MEETING EXPENSE$ 400.00
109BID OR EST. EXPENSE$ 300.00
110SHIPPING COMMON CARRIER$ 1,900.00
111SHIPPING OUR TRUCK
112
113TOTAL OTHER COSTS$ 9,100.00
114
115
116G AND A ALLOCATION ON LABOR AND MAT.38.00%$ 22,514.00
117CONTINGENCY3.00%$ 1,777.42
118GENERAL LIABILITY INSURANCE7.50%$ 4,438.31
119SUB TOTAL COST$ 112,849.09
121BONDING EXPENSE FEE0.00%$ -
122SALES COMMISSION0.00%$ -
123FIXED FEE (PROFIT)15.00%$ 16,927.36
124BANK INTEREST EXPENSE2.00%$ 2,595.53
125TOTAL COST$ 132,371.99
126
RAILROAD SIGNAL INTERNATIONAL
MATERIAL LIST
Costumer:
FT.WORTH AND WESTERN RAILROAD
Project:
FURNISH AND INSTALL
2 EACH GATE SIGNALS WITH SIDEWALK GATES AND LED LIGHTHEADS
COPPELL RD SOUTH COPPELL TX RRMP 28.30
HXP-1
QTYUNITVENDORPART NUMBERDESCRIPTION UNIT. COST. EXT. COST.
HOUSE
$ -
0EARSI6' X 6' ALUM CONTROL HOUSE W/INTERNAL FOUNDATIONS$ 8,890.00
EAGRAYBARLOAD CENTER 100 AMP $ 240.00 $ -
0
EARSITRAFFIC PRE-AMP BOX (ON OUTSIDE OF CASE) $ 320.00 $ -
0
EAGEMSPOWER OFF LIGHTS $ 32.00 $ -
0
EAFAST SIGNSDOT DOT SIGN AND DECALS $ 133.20 $ -
0
EARSICABLE RISORS PVC 4" $ 23.00 $ -
0
FTGETSTOWER & CASE WIRE #10 $ 0.42 $ -
0
EAGRAINGERDAYTON ATTIC FAN THERMOSTAT 80-140 DEGREES $ 21.39 $ -
0
EAGRAINGERATTIC FAN EXHAUST CENTRIFUGAL VENT FAN $ 114.15 $ -
0
EAB. A. ElectricGFI WALL RECEPTACLES $ 16.00 $ -
0
EARSI5LV7019" EQUIPMENT RACK $ 178.00 $ -
0
EANORBERGPLANDUIT 2-1/4"x2-1/4"x6' 6" $ 22.80 $ -
0
EANORBERGPANDUIT 4"x3"x6' 6" $ 31.50 $ -
0
EANORBERGPANDUIT 1-1/2"x1-1/2"x6' 6" $ 20.40 $ -
0
EAMTM12MDFPLYWOOD MED 49"x3/4"x97" $ 16.99 $ -
0
EAHOME DEPOT4ft FLUORESCENT LIGHTS $ 27.00 $ -
0
SIGNALS-GATES
EARSI$ 900.00
2TWOWAY LIGHTARM JCT BOX$ 450.00
EASAFETRAN$ 13,960.00
2MODEL 60 GATE MECHANISM$ 6,980.00
EAUSS$ 310.00
1TORQUE WRENCH GATE$ 310.00
EARSI$ 484.00
215-6X5 SIGNAL MAST$ 242.00
EARSI$ 864.00
25 INCH SPLIT BASE JCT BOX$ 432.00
EARSI$ 228.00
2HIGHWIND BRACKET$ 114.00
EAUSS$ 248.52
4GATE HUBS$ 62.13
EARSI$ 1,272.00
4COUNTERWIEGHT ARMS$ 318.00
EARSI$ 144.00
2GATE WIEGHT STUD PLATE W/RACHET WASHERS$ 72.00
EARSI$ 920.00
10GATE WIEGHTS$ 92.00
EAGSI$ 2,200.00
2GATE KEEPERS$ 1,100.00
EARSI$ 36.00
2GATE WIRE AND MOUNTING HARDWARE$ 18.00
EARSI$ 2,496.00
812" LED LIGHTHEADS W/BACKGROUND AND HOOD$ 312.00
EARSI$ 376.00
8LED GATE LIGHTS$ 47.00
EARSI$ 126.00
2GATE TIP DIODE$ 63.00
EARSI$ 246.00
2RR CROSSING SIGNS HI INT WITH MOUNTING HWG$ 123.00
EARSI$ 66.00
2RODENT PLATE$ 33.00
EARSI$ 370.00
210 FT SIDEWALK GATE HI INT$ 185.00
EARSI$ 1,280.00
220 FT GATE ARM HI INT$ 640.00
EARSI$ 390.00
2ELECTRONIC BELL$ 195.00
FOUNDATIONS
2EARSI GATE FOUNDATIONS$ 610.00$ 1,220.00
MAJOR ELECTRONICS
0EAGETS$ -
ELECTROLOGIXS XP4 CROSSING PREDICTION INCLUDING:
0EA227481-000$ 477.00$ -
ASSY IWP XTI-1S PERSONALITY
0EA227538-000$ 487.00$ -
ASSY VIO-44R PERSONALITY MOD.
0EA251124-000$ 416.00$ -
ASSY MODULE CDU-1
0EA251327-000$ 600.00$ -
ASSY MODULE IWP CPS-2
0EA251328-000$ 436.00$ -
ASSY MODULE IWP XCI-1
0EA251336-000$ 3,816.00$ -
ASSY MODULE IWP XTI-1S
0EA251346-000$ 1,007.00$ -
ASSY MODULE TC21 IWP NSM-1
0EA251379-000$ 2,054.00$ -
ASSY VIO-44R
0EA251395-000$ 1,406.00$ -
ASSY MODULE VPM2+
0EA300752-000$ 3,244.00$ -
SYS IWP ASSY CHASSIS W/BP
0EAGETS$ -
XING CONTROLLER KIT INCLUDING:
0EA075046-000$ 150.00$ -
ASSY XIP-20 CABLE #1
0EA075047-000$ 150.00$ -
ASSY XIP-20 CABLE #2
0EA227546-000$ 487.00$ -
ASSY IXC PERSONALITY MODULE
0EA227561-000$ 530.00$ -
ASSY IXS XIP-20 CROSSING INTER
0EA251384-000$ 2,650.00$ -
ASSY MOD IXS IXC-20S
0EAGETS250224-001C$ 296.00$ -
MDSA-1
0EARSI-$ 379.00$ -
ENERGY BUS PANEL
0EARSI$ 327.00$ -
SIGNAL CUT OUT PANEL
0EAGETS$ 490.00$ -
2TC AND BASE
0EARSI$ 734.00$ -
LAMP ARRESTER PANEL
0EARSIACSP-20-1ACSP SURGE PROTECTOR$ 120.00$ -
0EATYCO$ 35.00$ -
AC POR RELAY POTTER & BRUMFIELD & BASE
0EATYCO$ 35.00$ -
DC POR RELAY POTTER & BRUMFIELD & BASE
0EA250141-001 $ 170.00 $ -
5025A TRACK BATTERY REACTOR
1EACRAGG $ 598.00 $ 598.00
BATTERY CHARGER ELEC 40AMP
1EACRAGG $ 468.00 $ 468.00
BATTERY CHARGER ELEC 20AMP
6EAGNB50G19GNB 472 $ 498.00 $ 2,988.00
7EAGNB50G27GNB 680 $ 667.00 $ 4,669.00
1LOTRSITERMINALS MISC.WIRING MATERIALS$ 750.00$ 750.00
4EAHOME DEPOTBLACK ELECTRICAL TAPE$ 2.45$ 9.80
0EAJOSLYNSECONDARY SURGE PROTECTOR$ 31.00$ -
1LTRSIFIELD CABLE WIRE TAGS COMPUTER GEN$ 38.45$ 38.45
1BOXBRADYWNS-211-319$ 121.70$ 121.70
WIRE MARKING SLEEVES
1BOXBRADYCL-317-619-BK$ 46.52$ 46.52
LABELS
0EAWCH$ 18.00$ -
TEST SWITCH
0EASAFETRAN$ 6.50$ -
BAKELITE BASE POLE LIGHT
6EAGETS$ 13.50$ 81.00
DOUBLE ROW TERMINAL BLOCK W/HARDWARE
6EAGETS$ 12.75$ 76.50
SINGLE ROW TERMINAL BLOCK W/HARDWARE
CABLE
75FTGETS1078-05$ 2.08$ 156.00
3C#9
450FtBUSH$ 5.56$ 2,502.00
5 COND 6 CABLE
450FTGETS$ 3.67$ 1,651.50
7 COND 14 CABLE
500FTGETS$ 1.79$ 895.00
2C#6 TW TRACK WIRE
40FTGRAYBAR$ 0.46$ 18.40
Bare #6 COPPER WIRE SOLID GROUND
FIELD
A389$ 93.75
5EARSIPADLOCKS ( RR)$ 18.75
$ 15.04
8EAERICORAIL CLIPS TRACK WIRE$ 1.88
$ 110.00
2EARSIBOLARDS (YELLOW)$ 55.00
$ 78.00
20FTBUSH2 INCH PVC SCH 80$ 3.90
$ 9.12
6EABUSH2INCH 90 DEGREE SWEEPS$ 1.52
$ 20.64
24FTCHEROKEE3/4 HP AIR HOSE$ 0.86
$ -
EAGETSNBS$ 479.00
$ -
EARSI25 FT WOODEN POWER POLE$ 255.00
$ -
EARSINBS SHUNT TUBES$ 155.00
$ 336.00
2EARSITRACK WIRE JCT BOX$ 168.00
$ -
EABUSH4 INCH 90 DEGREE SWEEPS$ 89.00
$ -
EABUSH4 INCH 45 DEGREE SWEEPS$ 78.00
$ 41.86
7EAERICOCADWELD ONE SHOT $ 5.98
$ 234.00
1SETERICOBONDWIRE MOLDS (XS STYLE) WITH FRAMES$ 234.00
$ -
EAPULL BOXES SMALL$ 245.00
$ -
EAPULL BOXES LARGE$ 555.00
$ 457.50
150EAERICOBOND WIRES XS STYLE 6 1/2"$ 3.05
$ 883.50
150EAERICOBONDWIRES XS STYLE LONG WEB$ 5.89
$ 506.00
200FTBUSHSCH 80 PVC$ 2.53
$ 8.45
1CANHOME DEPOTYELLOW PAINT$ 8.45
$ 6.98
1CANHOME DEPOT3 INCH PAINT BRUSH$ 6.98
$ 15.60
8EAERICOWELD ON TRACK CONNECTIONS$ 1.95
$ -
EAHOME DEPOTDUCT SEAL FOAM$ 2.25
$ 40.74
6EAHOME DEPOTPLASTER OF PARIS$ 6.79
$ 89.00
100FTERICO3/16 BONDSTRAND INSULATED$ 0.89
$ 11.02
2CANHOME DEPOTPVC GLUE$ 5.51
$ 13.56
2CANHOME DEPOTPVC PIPE CLEANER$ 6.78
$ 3.88
4CANSWALMARTALUMINUM SPRAY PAINT$ 0.97
$ 23.97
3ROLLHOME DEPOTCAUTION TAPE$ 7.99
$ 16.25
1CANHOME DEPOTSCOTCHKOTE ELECTRICAL COATING 15 oz$ 16.25
$ 2.97
1EAHOME DEPOT3M SCOTCH 130c LINERLESS RUBBER SPLICING TAPE$ 2.97
$ 33.10
2EAGRAYBARGROUND RODS$ 16.55
$ 268.00
4EARSITRACK CONNECTION KIT$ 67.00
TOTAL
$ 46,525.32