ST0702-CS090930(9/19/2011) Keith Marvin - RE: CHANGE ORDER 1 FOR COPPELL ROAD Page 1 From: Keith Marvin To: Scott, James Date: 9/30/2009 1:19 PM Subject: RE: CHANGE ORDER 1 FOR COPPELL ROAD Attachments: ST0702- Trackwork.pdf James, Attached is the bid from Trackwork with their contact information. We do not yet have an agreement in place with Fort Worth and Western Railroad (FWWR). I will bring that agreement to City Council on October 13th. Trackwork will actually contract with FWWR. I also spoke with DART this morning, and they tell me that JRJ has not yet submitted a Contractors Right of Entry form for this project. I think they will want one for both the paving and the communication conduit. The form is located in the contract documents. Keith Keith Marvin, P.E. Project Engineer (972) 304 -3681 >>> "James Scott" < ]amessCa@]RJPaving com 9/30/2009 10:59 AM >>> Keith I was emailing to see ifyou could give me the contact info for track works for the rail on Coppell road. Thank you James Scott JRJ Paving. - - - -- Original Message---- - From: Keith Marvin rmai Ito: KMARVIN @ci.coppell.tx. us] Sent: Friday, August 28, 2009 11:12 AM To: Marty Murphy Cc: Richard Odell; longhornincCa@hughes.net James Scott Subject: Re: CHANGE ORDER 1 FOR COPPELL ROAD I think we need to use flowable fill. If that makes the cost go up, get me the number. Keith - - - -- Original Message---- - From: "Marty Murphy" < Martym @JRJPavin_q com To: Keith Marvin < KMARVIN @ci.coppell.tx.us Cc: < longhornincCa@hughes.net > Cc: James Scott < ]amessCa@]RJPaving com Sent: 8/28/2009 11:10:10 AM Subject: RE: CHANGE ORDER 1 FOR COPPELL ROAD I doubt if he planned on backfilling with anything other than the native material. We can ask. - - - -- Original Message---- - From: Keith Marvin rmailto :kmarvinCa@ci.coppell.tx.us] Sent: Friday, August 28, 2009 11:01 AM To: James Scott; Marty Murphy (9/19/2011) Keith Marvin - RE: CHANGE ORDER 1 FOR COPPELL ROAD Page 2 Cc: Richard Odell; longhornincCa@hughes.net Subject: RE: CHANGE ORDER 1 FOR COPPELL ROAD Marty, I think we can make this work. I would be more comfortable with this if we backfill to the top of this box with flowable fill. Would that be an additional cost, or had you planned it that way already? Keith Keith Marvin, P.E. Project Engineer (972) 304 -3681 >>> "Marty Murphy" < MartymCa@JRJPavinc1 com 8/28/2009 10:52 AM >>> Keith If I understand your question correctly, we will have a piece of 36" RCP between the manhole and the box structure for the connection just as if it were two manholes. I believe we will be placing a steel casing over the pipe and will have to use ram neck or a rubber gasket around the casing. The settlement issue should not be a problem as it will be backfilled just as would a manhole and the adjoining RCP. Brian, correct me if I am wrong. Marty - - - -- Original Message---- - From: Keith Marvin rmailto :kmarvinCa@ci.coppell.tx.us] Sent: Friday, August 28, 2009 10:40 AM To: James Scott Cc: Marty Murphy Subject: RE: CHANGE ORDER 1 FOR COPPELL ROAD James, Do you have an option 2 for a cast in place box connected to the existing box? If not, how do we connect this to the existing box, and how do we ensure no settlement, and that it will be water tight? Keith Keith Marvin, P.E. Project Engineer (972) 304 -3681 > >> "James Scott" < ]amessCa@]RJPaving com 8/28/2009 9:20 AM > >> Here it is - - - -- Original Message - - - -- (9/19/2011) Keith Marvin - RE: CHANGE ORDER 1 FOR COPPELL ROAD Page 3 From: Keith Marvin rmailto :kmarvin @ci.coppell.tx.us' Sent: Thursday, August 27, 2009 4:06 PM To: James Scott Subject: RE: CHANGE ORDER 1 FOR COPPELL ROAD Ok. The sooner the better. Keith Keith Marvin, P.E. Project Engineer (972) 304 -3681 >>> "James Scott" < ]amessCa@]RJPaving com 8/27/2009 3:59 PM >>> I just spoke to our sub contractor and he is putting the finishing touches on it right now. - - - -- Original Message---- - From: Keith Marvin rmailto :kmarvinCa@ci.coppell.tx.us] Sent: Thursday, August 27, 2009 3:57 PM To: James Scott Cc: Richard Odell; Marty Murphy Subject: RE: CHANGE ORDER 1 FOR COPPELL ROAD James /Marty, We need to close out Change Order #1. 1 need the pricing on the water /storm box in Bethel in order to do that. Please send it over as soon as you can. I need the final dollar amount for this change so I can work on the sewer line change that needs to go to City Council. If we don't have the numbers for CO #1 by Monday, then I can't do CO #2, and we will miss the window for the 9/8 council meeting. If we miss that meeting, we will not be able to get the sewer line approved until the 9/22 City Council Meeting. Keith Keith Marvin, P.E. Project Engineer (972) 304 -3681 >>> "James Scott" < ]amessCa@]RJPaving com 8/26/2009 10:25 AM >>> - - - -- Original Message---- - From: Keith Marvin rmai Ito: KMARVIN @ci.coppell.tx. us] Sent: Wednesday, August 26, 2009 10:04 AM To: James Scott Subject: Re: CHANGE ORDER 1 FOR COPPELL ROAD Is there supposed to be an attachment here? - - - -- Original Message---- - From: "James Scott" < ]amessCa@]RJPaving com To: Keith Marvin < KMARVIN @ci.coppell.tx.us (9/19/2011) Keith Marvin - RE: CHANGE ORDER 1 FOR COPPELL ROAD Page 4 Sent: 8/26/2009 9:36:41 AM Subject: RE: CHANGE ORDER 1 FOR COPPELL ROAD After taling with my utilitie sub, it appears that they ran into s problem with the SS at the service center. They need to lower it to connect it. The attached change order reflects the work that neds to be done. Apperently this is holding up my sub right now. Thank you - - - -- Original Message---- - From: Keith Marvin rmailto :kmarvinCa@ci.coppell.tx.us] Sent: Wednesday, August 26, 2009 8:47 AM To: James Scott Cc: Richard Odell; Marty Murphy Subject: Re: CHANGE ORDER 1 FOR COPPELL ROAD James, Any word on the 16" water line box? Keith Keith Marvin, P.E. Project Engineer (972) 304 -3681 >>> "James Scott" < ]amessCa@]RJPaving com 8/24/2009 10:26 AM >>> Keith, This is the change order # 1 we will send over the pricing for the 16" box etc... by tomorrow This is everything else tho. James Scott