Loading...
ST0702-CS100111 (9/20/2011) Keith Marvin - RE: COPPELL ROAD SOUTHPage 1 From: "Marty Murphy" <Martym@JRJPaving.com> To: "Keith Marvin" <kmarvin@ci.coppell.tx.us> Date: 1/11/2010 3:43 PM Subject: RE: COPPELL ROAD SOUTH I don't have James' proposal to you in front of me so I am not sure hat he gave you. Jimmy met with Rick and then gave us the measurements and I fairly certain it did not include the driveway, as you said it is covered under another pay item and uses different material. I will put it where ever you want but I have to buy 24 tons at a minimum and I will furnish and install it for $50.00ton. -----Original Message----- From: Keith Marvin [mailto:kmarvin@ci.coppell.tx.us] Sent: Monday, January 11, 2010 3:23 PM To: Marty Murphy Subject: Re: COPPELL ROAD SOUTH Marty, I'm having a hard time justifying the expense. I think we should do something from the top of the headwall to the edge of the slope of the yard. I do not think we should bring it into the yard, and especially not all the way to the asphalt. The driveway itself is covered under pay item # 129. My estimate is it would take about 9 tons to cover this area. The proposed cost of $100/ton seems high to me. If we can cover the area described above for $500 then I would authorize you to proceed. Call me in the office to discuss this. Thanks, Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "Marty Murphy" <Martym@JRJPaving.com> 1/11/2010 2:12 PM >>> Any news on the rip rap at the end of Mitchell, I have a crew that can install this week if we get the approval. Marty Murphy, Business Manager JRJ Paving, L.P. 1805 Royal Lane, Ste. 107 Dallas, TX. 75229 214-466-8340 214-466-8354 fax (9/20/2011) Keith Marvin - RE: COPPELL ROAD SOUTHPage 2