Loading...
Lesley Retail (QT)-CS110921 � 1 1 GLENN ENGINEERING LETTER OF TRANSMITTAL To: City of Coppell Date: Wednesday, September 21, 2011 Engineering Department 255 Parkway Project No.: 11 663.969 Coppell, TX 75019 Re: QT 969 Attn: Mr. Michael Garza, E.I.T. LIESLAE Y 2t. ML j :4: J L,0 7 — i I L K 5 X Enclosed Under Separate Cover Via No. of Copies Description 3 QT 969 - Revised Civil Plans 1 QT 969 - City Mark -ups 1 Response Letter Sent to you for the following reason: For Approval Review Completed Revise and Resubmit For Your Use Not Reviewed Returned For Review and Comment Remarks. Copy to: Signed: Cheralyn Armijo, P.E. GLENN ENGINEERING CORPORATION CityOfCoppell.docx 105 Decker Court, Suite 910, Irving, Texas 75062 972.717.5151 FAX 972.717/2176 �� GLENN ENGINEERING September 21, 2011 Mr. Michael Garza, E.I.T. City of Coppell 255 Parkway Coppell, Texas 75019 Re: Lesley Retail Addition, Lot 1 Block B (QuikTrip) Construction Plan Review Comments Dear Mr. Garza: Following is Glenn Engineering Corporation's response to your City Comments letter dated September 9, 2011: General 1. Remove all the City of Coppell details from this set, leave only the modified site specific details; the contractor is City details removed. required to have a copy of our details on site at all times. 2. Remove the landscape plans from the civil set. Landscape plan removed. Plat 3. Include the plat. Plat included. Paving Plan and Profile 4. Label Dividend Dr. Done. 5. Use stamped concrete at the drive entrances instead of brick pavers per city standards. Done. 6. Who is building the sidewalk in front of the detention pond? Land seller ith construction of pond. 7. ADA ramp will be required at the intersection of Dividend and Belt Line. Shown (per PK plans) 8. Who is constructing the shared access along the east side? This must be installed prior to final completion. QuikTrip is constructing this. Note added for clarity. Drainage Area and Plan 9. Drainage area F should be collected onsite; use the stub - out that will be provided by the Dividend Dr. construction. This drainage will flow to an inlet on Dividend reference PK plans. This has been coordinated with them. 10. You can remove the 25 yr storm from the chart; we require the 100 yr storm only. Done. 11. Show the directional flow arrows. Done. Erosion Control 12. Why not use the existing drive as a construction entrance? QuikTrip does not desire to put the construction entrance at this location. 13. Show the offsite inlets and have inlet protection around them. Done. Utility Plan 14. The FDC should not tie into the water line; it goes straight into the fire riser room. Corrected. 15. Coordinate with Jay C. London, P.E. of Pacheco Koch on the Dividend Dr. plan; you may need to loop the water line Fire connections moved towards Belt to ensure fire protection at all times. Line. If you have any questions or comments, please contact us. Sincerely, GLENN ENGINEERING CORPORATION • 1 heralyn M. Armin P.E. Project Manager