Loading...
ST0702-CS100429 (9/29/2011) Keith Marvin - RE: Coppell RdPage 1 From: "Marty Murphy" <Martym@JRJPaving.com> To: "Keith Marvin" <KMARVIN@coppelltx.gov> CC: "Jimmy Martin" <jimmym@jrjpaving.com> Date: 4/29/2010 11:56 AM Subject: RE: Coppell Rd That works for me, we can get an extra 1 1/2" for the $2646.00 the pay items will generate. I will pass this on and direct me crews to proceed accordingly. -----Original Message----- From: Keith Marvin [mailto:KMARVIN@coppelltx.gov] Sent: Thursday, April 29, 2010 11:52 AM To: Marty Murphy Cc: Richard Odell Subject: Re: Coppell Rd Marty, I have no desire to lime either. I do want extra concrete though. My suggested solution is to pay the contract amount for lime and prep, and you put the extra thickness that pays for instead. If that gets us 1 or 1.5 inches rather than 2 I'm fine with that. Keith -----Original Message----- From: "Marty Murphy" <Martym@JRJPaving.com> To: Keith Marvin <KMARVIN@coppelltx.gov> Sent: 4/29/2010 11:40:15 AM Subject: FW: Coppell Rd Keith, I received this email today. I am not sure why you want to lime the sub grade to begin with. The approach has already been limed with our contract and Southwestern was limed when it was built. All we are doing is making grade changes for drainage, not replacing for structural integrity. You asked me to construct these changes based on the removal and replacement, not lime. My cost to lime an area this small will be around $7k, I cannot lime this area for the same unit prices in the contract. No matter how big or small an area is you have one full day for each application when applying lime, mix, remix and fine grade. Per the email below you want to trade out two inches for the lime. Typically the even trade off is one inch not two. With 4543 sf or 505 sy of lime area we would have $1080.70 for manipulation and $1565.92 for materials. The additional two inches of concrete material is $3400.00, so you can see it is not an even swap. (9/29/2011) Keith Marvin - RE: Coppell RdPage 2 Let me know what you think. Marty From: Jimmy Martin Sent: Thursday, April 29, 2010 7:55 AM To: Marty Murphy Subject: Coppell Rd Marty, Keith wants us to put in two extra inches of concrete and no lime for the same price on Southwestern . The City is receiving a lot of heat over shutting Coppell Rd down again . The want us to pour this Friday and try and open it up Monday . Ed is just now doing the demo , I don't think we can get this done in that time frame . Jimmy Martin Project Manager JRJ Paving, LP 214-499-3917