ST1002-CS110829
(9/30/2011) Keith Marvin - RE: RE: Old Town Coppell and Bethel Road QuestionsPage 1
From:
"Greg Yancey" <gregyancey@verizon.net>
To:
"'Keith Marvin'" <kmarvin@coppelltx.gov>
Date:
8/29/2011 6:11 PM
Subject:
RE: RE: Old Town Coppell and Bethel Road Questions
Hi Keith:
Does the attached UT-19 look right to you? Looks like the drives are shown
incorrectly.
Gregory K. Yancey
Provident Company
(214) 215-9400 v
(214) 276-1709 f
gregyancey@verizon.net
-----Original Message-----
From: Keith Marvin [mailto:kmarvin@coppelltx.gov]
Sent: Monday, August 29, 2011 10:46 AM
To: gregyancey@verizon.net
Cc: Mindi Hurley
Subject: Fwd: RE: Old Town Coppell and Bethel Road Questions
Greg,
Attached is a draft addendum that will be going out today on the Old Town
project. This should be addressing most of your remaining comments.
Keith
Keith Marvin, P.E.
Project Engineer
(972) 304-3681
>>> Dan Prendergast <drp@freese.com> 8/29/2011 9:25 AM >>>
Keith,
Attached is the draft version of Addendum 1. I'm still waiting on our
Irrigation folks to send me their updated sheet. I also haven't included
the bid tab because there are a few quantities that I'm still updating. I
wanted you to get this ASAP because there are quite a few sheets to review.
Please call me with any questions/concerns
Thanks
Dan Prendergast, E.I.T.
East Transportation/Infrastructure
Freese and Nichols, Inc.
1701 N. Market St., Suite 500
Dallas, Texas 75202
214-217-2216
www.freese.com
(9/30/2011) Keith Marvin - RE: RE: Old Town Coppell and Bethel Road QuestionsPage 2
-----Original Message-----
From: Keith Marvin [mailto:kmarvin@coppelltx.gov]
Sent: Friday, August 26, 2011 5:05 PM
To: Dan Prendergast; Tricia Hatley
Subject: Fwd: Old Town Coppell and Bethel Road Questions
Dan,
These questions came in today prior to the deadline. Let's try to include
answers in the addendum that will go out on Monday.
Thanks,
Keith
Keith Marvin, P.E.
Project Engineer
(972) 304-3681
>>> "Dusty DeFury" <dusty@bowmanconstruction.com> 8/26/2011 4:29 PM >>>
Jerod,
Questions Are as follows:
1.Pay item no. 129 Describes 2" HMAC, 6" Agg base, Sheet DT-1 Details 4"
HMAC,6" Agg base. Please Clarify
2. All tree wells will need to be excavated 36" Deep x 5' x 10'. What is
this excavation subsidiary to? No pay item for tree wells? please clarify
Thanks,
Dusty DeFury
Jim Bowman Construction Company, L.P.
2716 S. Rigsbee Dr.
Plano, Tx 75074
Bus: (972) 423-1313
Fax: (972) 423-9447
(9/30/2011) Keith Marvin - RE: RE: Old Town Coppell and Bethel Road QuestionsPage 3
Mobile: (214) 926-9554
Please consider the environment before printing this message.
This electronic mail message is intended exclusively for the individual or
entity to which it is addressed. This message, together with any attachment,
may contain the sender's organization's confidential and privileged
information. The recipient is hereby notified to treat the information as
confidential and privileged and to not disclose or use the information
except as authorized by sender's organization. Any unauthorized review,
printing, retention, copying, disclosure, distribution, retransmission,
dissemination or other use of, or taking of any action in reliance upon,
this information by persons or entities other than the intended recipient is
prohibited. If you received this message in error, please immediately
contact the sender by reply email and delete all copies of the material from
any computer. Thank you for your cooperation.
__________ Information from ESET Smart Security, version of virus signature
database 6419 (20110829) __________
The message was checked by ESET Smart Security.
http://www.eset.com
__________ Information from ESET Smart Security, version of virus signature
database 6420 (20110829) __________
The message was checked by ESET Smart Security.
http://www.eset.com