Loading...
ST8804-CS 881024 COPPELL PUBLIC WORKS MEMORANDUM October 24, 1988 TO: Taryon Bowmsn, Planning & Zoning Coordinator FROM: Steve Morton, Public Works Inspector Howard Pafford, Water Foreman Per Birdsall, Street Foreman Richard Diano, Park Foreman RE: Heartz Road Preliminary Plat - Comments Water Add three (3) inline 12" water valves - use 600 feet spacing rule. Will the existing 8" sanitary sewer take the wastewater flows from this area? Need average daily water consumption and average daily sewage discharge for this area. Public Works Inspections Delineate linear park Drainage easement for 3 - 6x4 box culvert headwall Grading detail for bank @ existing lakes Need detour details Brick paver to match existing crossing Parks At lake area, will this be modified to provide for proposed drainage? Slopes should be Erassed with suitable materials such as rye if winter months or bermuda if sum~er months of construction occurs to reduce erosion and siltation of lake. Streets Pavers at the intersection of Heartz & Parkway must match up c'c~, ~teve Goram, Director of Public Works