ST8804-CS 881024 COPPELL PUBLIC WORKS
MEMORANDUM
October 24, 1988
TO: Taryon Bowmsn, Planning & Zoning Coordinator
FROM: Steve Morton, Public Works Inspector
Howard Pafford, Water Foreman
Per Birdsall, Street Foreman
Richard Diano, Park Foreman
RE: Heartz Road Preliminary Plat - Comments
Water
Add three (3) inline 12" water valves - use 600 feet spacing rule.
Will the existing 8" sanitary sewer take the wastewater flows
from this area?
Need average daily water consumption and average daily sewage
discharge for this area.
Public Works Inspections
Delineate linear park
Drainage easement for 3 - 6x4 box culvert headwall
Grading detail for bank @ existing lakes
Need detour details
Brick paver to match existing crossing
Parks
At lake area, will this be modified to provide for proposed
drainage?
Slopes should be Erassed with suitable materials such as rye if
winter months or bermuda if sum~er months of construction occurs
to reduce erosion and siltation of lake.
Streets
Pavers at the intersection of Heartz & Parkway must match up
c'c~, ~teve Goram, Director of Public Works