Loading...
ST8505-CS 881111GINN, INC. November 11, 1988 Mr. Mike Albe~, President Ed Bell Cons{ruction Co. P.O. Boxy.540787 Dallas.,/TX 75220-0777 Re: Relocation of School Flasher Belt Line Road Improvements Coppell, TX C()NSIILTING EN(;INEERS Dear Mr. Albert: Due to public safety being at issue, we have pulled this item out separately from your cost list for the proposed Change Order No. Six (6) items recently submitted to this office. Please proceed immediately with this work to facilitate the concerns of city staff. Thank you for your cooperation. questions. Please call me if you have any Sincerely, Kevin Peiffe~, P.E. cc: Russell Doyle, P.E. Steve Goram H. Wayne Ginn, P.E. Randy Fleming File 255 17103 Preston Road · Sititc 100 · IBl18 · I)allas. Tcxa.s 75248 · i~ho;}c 214,/248-400(} "'" '~'ORK DIRECTIVE CHANGE (Inslructions on reverse sidel No. PROJECT: Belt Line Road Improvements DATE OF ISSUANCE: November 10, 1988 OWNER: City of Coppell (Name. P.O. Box 478 Address) Coppell, TX 75019 CONTRACTOR: Ed Bell Construction Co,OWNER's Project No. ENGINEER: Ginn, Inc. (Kevin Peiffer, P.E.) CONTRACT FOR: Belt Line Rd. Imprvts£NGINEER's Project No. 755 You are directed to proceed promptly with the following change(s): Description: Remove, relocate and re-install, complete-in-place, one school flasher from old Southwestern Blvd. to the new Southwestern Blvd, connection as directed by ~e Faq~in~¢r in_the .fieLd. rpose o~ work wrect~ve ~nange: Provide public safety to children in the school zone, Attachments: (list documents supporting change) None. ff a claim is made that the above change(s) have affected Contract Price or Contract Time, any claim for a Change Order based thereon will involve one of the following methods of determining the effect of the change(s). Method of determining change in Contract Price: I-1 Time and materials [] Unit prices [] Cost plus fixed fee ~ Other Lt~4P SUH Estimated increase (~ in Contract Price: $ 165.00 If the change 'involves an increase, the esti- mated amount is not to be exceeded with- out f.ur~her authorization. Method of determining change in Contract Time: [2] Contractor's records [] Engineer's records ~ Other Not Applicable Estimated increase ~ in Contract Time: ~days. If the change involves an increase, the estimated time is not to be exceeded without further autho- rization. RECOMMENDED: AUTHORIZED;.' by