ST8505-CS 881111GINN, INC.
November 11, 1988
Mr. Mike Albe~, President
Ed Bell Cons{ruction Co.
P.O. Boxy.540787
Dallas.,/TX 75220-0777
Re:
Relocation of School Flasher
Belt Line Road Improvements
Coppell, TX
C()NSIILTING EN(;INEERS
Dear Mr. Albert:
Due to public safety being at issue, we have pulled this item out
separately from your cost list for the proposed Change Order No.
Six (6) items recently submitted to this office.
Please proceed immediately with this work to facilitate the
concerns of city staff.
Thank you for your cooperation.
questions.
Please call me if you have any
Sincerely,
Kevin Peiffe~, P.E.
cc:
Russell Doyle, P.E.
Steve Goram
H. Wayne Ginn, P.E.
Randy Fleming
File 255
17103 Preston Road · Sititc 100 · IBl18 · I)allas. Tcxa.s 75248 · i~ho;}c 214,/248-400(}
"'" '~'ORK DIRECTIVE CHANGE
(Inslructions on reverse sidel No.
PROJECT: Belt Line Road Improvements DATE OF ISSUANCE: November 10, 1988
OWNER: City of Coppell
(Name. P.O. Box 478
Address) Coppell, TX 75019
CONTRACTOR: Ed Bell Construction Co,OWNER's Project No.
ENGINEER: Ginn, Inc.
(Kevin Peiffer, P.E.)
CONTRACT FOR: Belt Line Rd. Imprvts£NGINEER's Project No. 755
You are directed to proceed promptly with the following change(s):
Description: Remove, relocate and re-install, complete-in-place, one school flasher
from old Southwestern Blvd. to the new Southwestern Blvd, connection as directed by
~e Faq~in~¢r in_the .fieLd.
rpose o~ work wrect~ve ~nange:
Provide public safety to children in the school zone,
Attachments: (list documents supporting change)
None.
ff a claim is made that the above change(s) have affected Contract Price or Contract Time,
any claim for a Change Order based thereon will involve one of the following methods of
determining the effect of the change(s).
Method of determining change in
Contract Price:
I-1 Time and materials
[] Unit prices
[] Cost plus fixed fee
~ Other Lt~4P SUH
Estimated increase (~ in Contract
Price: $ 165.00
If the change 'involves an increase, the esti-
mated amount is not to be exceeded with-
out f.ur~her authorization.
Method of determining change in
Contract Time:
[2] Contractor's records
[] Engineer's records
~ Other Not Applicable
Estimated increase ~ in Contract
Time: ~days. If the change
involves an increase, the estimated time is
not to be exceeded without further autho-
rization.
RECOMMENDED:
AUTHORIZED;.'
by