Loading...
WA9903-SP000111 SHIMEK, JACOBS & FINKLEA, L.L.P. CONSULTING ENGINEERS DALLAS, TEXAS Date: January 18, 2000 AUI, Inc. ~Se6xas 76110 Re: City of Coppell, Texas Village Parkway Pump Station We are transmitting herewith 3 copies of the submittal data furnished by Architectural Utilities, Inc. These copies have been reviewed and marked as follows: Explanation No Make Revise Submit No. Exceptions Corrections and Specified Dwg. No. Sheets Dwg. Description Taken Rejected Noted Resubmit Items 5 Concrete Resubmittal X 4 Flex Coupling X Remarks: By: ~ ~ ,,/' Mr Ga~ ~ .... Checking of shop drawings by Shimek, Jacobs & Finklea is only for general conformance with the design concept of the project and general compliance with the information given in the contract documents. Any action shown is subject to the requirements of the plans and specifications. Contractor is responsible for: dimensions which shall be confirmed and correlated at the job site; fabrication processes and techniques of construction; coordination of his work with that of all other trades; and performing his work in a safe and satisfactory manner. J:\Coppell\ 1999-153\L\design\kxshopdwg I doc Baugh & Associates, Inc. Products Marketing Specialists 11203 Jones Rd. West - Houston, Texas 77065 Phone (281) 807-9696 - Fax (281) 807-4607 SUBMITTAL DATA For FLEX COUPLINGS For ADDITION OF PUMP No. 4 AT THE VILLAGE PARKWAY PUMP STATION PROJECT No. WA99-03 BID No. Q-119902 For CITY OF COPPELL, TX. PREPARED BY: BAUGH & ASSOCIATES, INC. January 11, 2000 _/ [~EXCEPTION TAKEN E] MAKE CORRECTIONS NOTED E) REJECTED J"l RE'VISE AND RESUBMIT ~ SUBMIT SPECIFIED ITEM Checking Is Onh] for general conformance with the design concept of the Project and ~'eneral compliance with fhe information given In the contract documents. Any action shown is subject to the requi;ements of the plans and specifications. Contrector is responsible for: dimensions which shall be confirmed and correlated at the job site; fabrication Processes and techniques of construction, co- ordination Of his work with that of all other trades and Performing his work in a safe and satisfactory manner. S'HIM':K, JACOBS & FINKLEA CONSULTI~'.iG ENGINEERS DALLAS, TEXAS REVIEWED AND 8UBNm m m m::u BY ALe GENERAL CONTRACTORS 3OO W. RAMSEY FORT WORTH. TX 78110 ~ P~pe O.D ! MIDDLE RING ASTM A36/A53 Minim. Yield 36,000 PSI Cold Expanded 1% GASKET · B~ker SBR per ASTM D2000 ANSI A21.111 AWWA C-Ill 5. ktNmNG -Baker Shop Coat BAICER SERIES 200 COUPLING 2. FOLLOWER RING AISI CI020/lOZl Single Mill Section Cold Expnnded 1% 4. BOLT High Strength Low Alloy per ANSI/AWWA Cll I/A21.1 l with h~avy hex nuts per ASTM A563 6. COATING Baker Shop Coat All dinlensions are in inches. Flexible couplirr~s do not provide against pull out of Couplings ineets the provisions of ANSI/AWWA C219-97 ( Couplings stintlard for plaits end pipe ripe Item OD 30.00 Catalog Number :ZOO- 30.00 2 20.00 200-20.00 Middle Ring Ove~-all Bolt/Threaded Rod Weight Diameter ( LBS ) T L (O.A.D) Qty Dinm Lgth 114 7 34-318 16 5/8 11 135 Wt, rking Pressure (Psi) 244 1/4 7 24-3/8 12 5/8 i 1 93 362 BAKER COWLING COMPANY., INC. 2929 S. Snntn Fe Los Angeles, CA 90058 Baker Fax: 800-247-1174 Im: NON Oh: SIO mi: STO tO Cu,~: gaugh & A,ssocint~$ DATE: 01-0~-2000 P. 0,9': B1828 By: ram satyarthl Proj: VILLAGE PKWY DWG/: AK-17279 Baker Ph. 213-583-3444 Outside Calif. 800-247-7164 Rev: 0 e,. {:)HOP L: L~AOP gem ,kJ Mee.r,,.~imlt:[X/Ire-I: V 13~14 lie, IT V 1J'?. ~ INSTRU,~,OI~ MUST BE FORWARD!~ TO BAKER . -. COUPLING COMPANY INC, Manufacturers- Couplings, Adaplors, & Specialties 2929 So. Santa Fe Avenue 213-583-3444 800-247-7164 FAX 213-587-4258 Los Ange4es, CA 90058 INSTALLATION INSTRUCTIONS FOR BAIcgR SgRW-S 200 COUTLINGLq I. Measure pipe diameter at 8 placm 45 clog. apxrt. Difference between minimum and maximum should not exceed *(C) . If the difference is greater than {C), make corrections by rounding up thepipe with trench jacl~, or suitable wooden post and wedges. Mainlain this rotredress until the joint iS made tap, and all torqueing has been completed. *-Refer to TABLE ON PIPE F.N]) TOLERANCES on Page Two. 2. Pipe ends mt~t be cleail and rre of all oil, dirt, loose scale & rust. A thorough deaning with a wire brush is recommended. AH wdds on pipe ends must be ground smooth. ASSEMBLY~ I. Place a end ring on each pipe end. If the end ring(s) does not easil7 dip on pipe, correct pipe out-of- rmmdness with jacks or posts as noted above in !. '2. The gaskets should be cleaned and inspec___~ for any dantap ht shipment, and thin stretched over pipe ends. It may he helpful Io wet the gaskets with wain' to make installation easier. 3. Place the center sleeve on one pipe end. Race gasket and other end dng on the other pipe end. Slide the center sleeve into position and center over gap between Ihe two pipe ends. 4. XMI'ORTANT: The dearam betwere the OD of the pipe ends and the ID or the center aleeve and end rlngs is to he distributed as eveoly as possible. No mm~llma l/$"g~or q-,~,t is mqmhilde. Wooden wedges or plastic shims may he used. These __e~___ering aids my k removed after the coupling is assembled. The wedges or shims must not project into the gasket pocket. 5. Be sure that Ihe gasket pocket in the end ring(s) is free from wood, dirt, metal or other ~dd debris. 6. Apply *flu soap to the gasket and center aleeve bevel face, and push gaskets into place. (In winter, use ethylem~ glyeol mixture). *Pipe joint Lubwlcank Smeord Carp, Cmssdgn, NJ, or tquaL 7. Push end rings a~sins( Wasket, and rotat~ one end ring umil bolt holm line up. !IOL'r~G UP L Insert all bolts, tighten nuts finger tight. it ix mnvenient Io tighten bolts by downward wrmr. Mng. Inert bolts so nuts are on Ib karl side of the inslaller, as he faces the pipe.. ~i'AINLE~ ~ NUTS BR FIgLp LUBRICATED WH'B A SUITABLE ANTI GAILIN~ COM!q)UND PIt!OR _3'0 BGLT 2. Be certain that tim md ring(s) iS ~ Over the inter sleeve wlthom any interference. Xf necessary, wedges may he used to free rig end ring(s) from the edg~ or the center delve. B(!,T~n,~I sr~VE TY~ COIXPa ~qGS DO NOT FROVI!IC ~ON A CMNST ~ OF PIP~ (2) 3. On couplings 60~ and large:', 3 or 4 instailez~ can best tighten. Space the Instal|ers ~mlb~ around the coupling, and lave all advance in the same direction as they lighten each ,rot. Be ctdain llmt the tnd ring does not 'cock' as the nuts are tightreal. A tnv~ wreath. mmmt be mgd, Tighten to 30-35 foot pounds all around, two or Ihree times, Increase Ihe wrmch setting to 40-50 foot pounds, and co"tlnue the procedure to 75 foot pounds for 5/8' bolts and 90 foot pounds for 3/4" and larger belt At the maximum tightness, go around the coupling several times to assure uniform gasket pressure. 4. BeJ'or~ final llghl~ming, jr'is good tedmlque to strfke each bolt bead with a light .sledge hammer to Rat all parts. 5. AFfER FINAL TIGHTENING HAS BEEN COMPLETED. remove all pipe roundup material. RETIGHTENING OF BOLTS: Arm- 24 hours, or jmt bcf'erc filling with water, it my be necmsary to check the tigJ~ness of the boil:s, Follow Ihe Inkst torque _u,tii!lg as showit above. ~iNG: Irksks ck. vdope during tln kni proctdurr,~gblm mr- -- yk-Slop lni~ Cmdlum sksdd k cm:rciacd to a.~'urc thai md r;ng, asder skcre or Ikbolting Im'dwarek md ov,-~hu.~l during this CAUTION: A OiOe ~,~,ci;on should never be allowed to' HANG in the cootdlno. ellher More or after making up the joint. Coupllnts are desiened to FLOAT on the pipe ends. not support the pipe. ~ END PREPARATION: The pipe shall he sufl'ziently free frem indentatiom, projections, or roll marks for a disOmo: 18" from the md ot the pipe to make a tight joint with the rubber gasket type or coupling. For a distanem of 18" from the end of the pipe, the pipe circumf~ s!~ll nol he more than fA) largeror_ smaller than the outside-circumference computed from the sperY~ed outside diameter. All of the out-of- roundness shall be in the form o[ a smooth oval thai can he jmcke:d rmmd in soch a manner llmt the difference behveen the mlxillluffi I~d min~!Iufll dins.=_--- S S]~]I IIOt ellCIM~d (C~ . TAm-W- ON (A) f83 (C) (+). (-) O1~. TQL TOL ~aX 12"-42" FollOw' A1VlrYA C-219, Treble 4, Plle 12 for all app]icafiom 44"-72" I/1" I/it" 73"-~6" 3/1~ I/it" !/8" 9"/"-!20" 114" 1/16" 3/16" 120" & up I/4" I/1~' 114" NOTE.' Series 216 Insulating Couplings and Series 60,1 Flanged Coupling .Adapters may be jailed using thera imtructiora. INSUt. ATU mXrr(s). Pmltlm Imot(s} plpc rod(s), mm fonow mug |mmOim frmm ibe b~ .... '~t- IMPORTANT. ASSRMBLY t, akee, is me/d"Nsd m that i/4' openiM Many ooe place BOLTED SLEEVE TYPE COUPLINGS DO NOT PEOYIDIE: PR~ AGAINS~ PULLOUT 0FPIPE BAKER follows the proHsions outlln~d In AIVtVA C-219 when manufacturing BOLTED SLEEVE TYFE COUPLINGS, FLANCED COUPLING ADAPrt:RS, or rdMed productS.